Published 2000-06-19 · Federal Register document 00-15186
Airworthiness Directives; Airbus Model A300-600 Series Airplanes
Publication summary
This amendment supersedes an existing airworthiness directive (AD), applicable to certain Airbus Model A300-600 series airplanes, that currently requires repetitive ultrasonic inspections to detect cracks in the bolt holes inboard and outboard of rib 9 on the bottom booms of the front and rear wing spars, and repair, if necessary. This amendment requires revising the compliance thresholds for the inspection and requires that the inspections be repeated at reduced intervals. This amendment is prompted by issuance of mandatory continuing airworthiness information by a foreign civil airworthiness authority. The actions specified by this AD are intended to prevent fatigue cracks in the bolt holes of the wing spars, which could result in reduced structural integrity of a wing spar.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:00.616356+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2000-18aee3630151116d
- Source row
- results[312]
- Raw source SHA-256
- 18aee3630151116d2fb3a6893673332fd0937cde18bc691722f3a802a62279eb
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2000-12-11
- Effective date printed in this edition
- 2000-07-24
Some source clauses remain unstructured. Read the complete publication for conditions that have not been interpreted here.
Read 2 complete recorded clauses
Applicability wording · Applicability
Applicability: Model A300-600 series airplanes, certificated in
any category, on which Airbus Modification 10161 has not been
installed in production.
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
otherwise modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
alternative method of compliance in accordance with paragraph (c) of
this AD. The request should include an assessment of the effect of
the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not been
eliminated, the request should include specific proposed actions to
address it.
Exact source excerpt. Text positions 6326–7241, end exclusive, in the original decoded publication. SHA-256: 03775def029aab5ce3cb999116bd177a130f03af4776ea6da9eeaeba9533bcf7
Compliance and requirements
Compliance: Required as indicated, unless accomplished
previously.
To prevent fatigue cracks in the bolt holes of the wing spars,
which could result in reduced structural integrity of a wing spar,
accomplish the following:
Ultrasonic Inspections
(a) Perform an ultrasonic inspection to detect fatigue cracking
of the bolt holes inboard and outboard of rib 9 on the bottom booms
of the front and rear wing spars, in accordance with Airbus Service
Bulletin A300-57-6037, dated August 1, 1994, or Revision 1, dated
August 31, 1995, at the applicable time specified in paragraph
(a)(1) or (a)(2) of this AD. Repeat the inspection thereafter at
intervals not to exceed 4,800 flight cycles or 11,000 flight hours,
whichever occurs first.
(1) For airplanes on which Airbus Modification 8842 (reference
Airbus Service Bulletin A300-57-6039) has not been installed:
Inspect at the earlier of the times specified by paragraphs
(a)(1)(i) and (a)(1)(ii) of this AD.
(i) Prior to the accumulation of 17,000 total flight cycles, or
within 2,000 flight cycles after May 10, 1995 (the effective date of
AD 95-07-05, amendment 39-9187), whichever occurs later.
(ii) Prior to the accumulation of 39,000 total flight hours.
(2) For airplanes on which Airbus Modification 8842 has been
installed: Inspect at the earlier of the times specified by
paragraphs (a)(2)(i) and (a)(2)(ii) of this AD.
(i) Within 17,000 flight cycles after accomplishment of Airbus
Modification 8842, or within 2,000 flight cycles after May 10, 1995,
whichever occurs later.
(ii) Within 39,000 flight hours after accomplishment of Airbus
Modification 8842.
Corrective Action
(b) If any crack is found, prior to further flight, repair in
accordance with Airbus Service Bulletin A300-57-6037, dated August
1, 1994, or Revision 1, dated August 31, 1995. Thereafter, perform
the repetitive inspections required by paragraph (a) of this AD.
Alternative Methods of Compliance
(c) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, International Branch, ANM-116, FAA,
Transport Airplane Directorate. Operators shall submit their
requests through an appropriate FAA Principal Maintenance Inspector,
who may add comments and then send it to the Manager, International
Branch, ANM-116.
Note 2: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the International Branch, ANM-116.
Special Flight Permits
(d) Special flight permits may be issued in accordance with
Secs. 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR
21.197 and 21.199) to operate the airplane to a location where the
requirements of this AD can be accomplished.
Incorporation by Reference
(e) The actions shall be done in accordance with Airbus Service
Bulletin A300-57-6037, dated August 1, 1994; or Airbus Service
Bulletin A300-57-6037, Revision 1, dated August 31, 1995, as
applicable. Airbus Service Bulletin A300-57-6037, Revision 1, dated
August 31, 1995, contains the following list of effective pages:
------------------------------------------------------------------------
Revision level
Page No. shown on page Date shown on page
------------------------------------------------------------------------
1, 2, 4-6.................... 1................ August 31, 1995.
3, 7-17...................... Original......... August 1, 1994.
------------------------------------------------------------------------
(1) The incorporation by reference of Airbus Service Bulletin
A300-57-6037, Revision 1, dated August 31, 1995, is approved by the
Director of the Federal Register in accordance with 5 U.S.C. 552(a)
and 1 CFR part 51.
(2) The incorporation by reference of Airbus Service Bulletin
A300-57-6037, dated August 1, 1994, was approved previously by the
Director of the Federal Register as of May 10, 1995 (60 FR 17990,
April 10, 1995).
(3) Copies may be obtained from Airbus Industrie, 1 Rond Point
Maurice Bellonte, 31707 Blagnac Cedex, France. Copies may be
inspected at the FAA, Transport Airplane Directorate, 1601 Lind
Avenue, SW., Renton, Washington; or at the Office of the Federal
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Note 3: The subject of this AD is addressed in French
airworthiness directive 94-208-169(B)R2, dated October 8, 1997.
(f) This amendment becomes effective on July 24, 2000.
Exact source excerpt. Text positions 7241–11892, end exclusive, in the original decoded publication. SHA-256: a14a686948ea2e26480c14d58480a5f439d3cdb37567ba4856273de9b62bb094
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2000-12-11 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: eb82690fc707b23a9a5bb690a98c4893aa9157a38d36c2420d0637f4a49e0080. Source manifest: 3fd958b72988eef13959ce947a54152df050aa6ce40bd463263802ea8063c037.
Official source · 2000-06-19
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 65, Number 118 (Monday, June 19, 2000)]
[Rules and Regulations]
[Pages 37853-37854]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 00-15186]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 98-NM-164-AD; Amendment 39-11789; AD 2000-12-11]
RIN 2120-AA64
Airworthiness Directives; Airbus Model A300-600 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment supersedes an existing airworthiness directive
(AD), applicable to certain Airbus Model A300-600 series airplanes,
that currently requires repetitive ultrasonic inspections to detect
cracks in the bolt holes inboard and outboard of rib 9 on the bottom
booms of the front and rear wing spars, and repair, if necessary. This
amendment requires revising the compliance thresholds for the
inspection and requires that the inspections be repeated at reduced
intervals. This amendment is prompted by issuance of mandatory
continuing airworthiness information by a foreign civil airworthiness
authority. The actions specified by this AD are intended to prevent
fatigue cracks in the bolt holes of the wing spars, which could result
in reduced structural integrity of a wing spar.
DATES: Effective July 24, 2000.
The incorporation by reference of Airbus Service Bulletin A300-57-
6037, Revision 1, dated August 31, 1995, as listed in the regulations,
is approved by the Director of the Federal Register as of July 24,
2000.
The incorporation by reference of Airbus Service Bulletin A300-57-
6037, dated August 1, 1994, as listed in the regulations, was approved
previously by the Director of the Federal Register as of May 10, 1995
(60 FR 17990, April 10, 1995).
ADDRESSES: The service information referenced in this AD may be
obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707
Blagnac Cedex, France. This information may be examined at the Federal
Aviation Administration (FAA), Transport Airplane Directorate, Rules
Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of
the Federal Register, 800 North Capitol Street, NW., suite 700,
Washington, DC.
FOR FURTHER INFORMATION CONTACT: Norman B. Martenson, Manager,
International Branch, ANM-116, FAA, Transport Airplane Directorate,
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425)
227-2110; fax (425) 227-1149.
SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal
Aviation Regulations (14 CFR part 39) by superseding AD 95-07-05,
amendment 39-9187 (60 FR 17990, April 10, 1995), which is applicable to
certain Airbus Model A300-600 series airplanes, was published in the
Federal Register on April 20, 2000 (65 FR 21157). The action proposed
to continue to require repetitive ultrasonic inspections to detect
cracks in the bolt holes inboard and outboard of rib 9 on the bottom
booms of the front and rear wing spars, and repair, if necessary. The
action also proposed to revise the compliance thresholds for the
inspection and require that the inspections be repeated at reduced
intervals.
Comments
Interested persons have been afforded an opportunity to participate
in the making of this amendment. No comments were submitted in response
to the proposal or the FAA's determination of the cost to the public.
Conclusion
The FAA has determined that air safety and the public interest
require the adoption of the rule as proposed.
Cost Impact
There are approximately 75 airplanes of U.S. registry that will be
affected by this AD.
The inspection that is currently required by AD 95-07-05, and
retained in this AD, takes approximately 1 work hour per airplane to
accomplish (excluding 10 work hours for access and close-up), at an
average labor rate of $60 per work hour. Based on this figure, the cost
impact of the currently required inspection on U.S. operators is
estimated to be $4,500, or $60 per airplane, per inspection cycle.
The cost impact figure discussed above is based on assumptions that
no operator has yet accomplished any of the requirements of this AD
action, and that no operator would accomplish those actions in the
future if this AD were not adopted.
Regulatory Impact
The regulations adopted herein will not have a substantial direct
effect on the States, on the relationship between the national
Government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, it
is determined that this final rule does not have federalism
implications under Executive Order 13132.
For the reasons discussed above, I certify that this action (1) is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the Rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends part 39 of
the Federal Aviation Regulations (14 CFR part 39) as follows:
[[Page 37854]]
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
2. Section 39.13 is amended by removing amendment 39-9187 (60 FR
17990, April 10, 1995), and by adding a new airworthiness directive
(AD), amendment 39-11789, to read as follows:
2000-12-11 Airbus Industrie: Amendment 39-11789. Docket 98-NM-164-
AD. Supersedes AD 95-07-05, Amendment 39-9187.
Applicability: Model A300-600 series airplanes, certificated in
any category, on which Airbus Modification 10161 has not been
installed in production.
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
otherwise modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
alternative method of compliance in accordance with paragraph (c) of
this AD. The request should include an assessment of the effect of
the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not been
eliminated, the request should include specific proposed actions to
address it.
Compliance: Required as indicated, unless accomplished
previously.
To prevent fatigue cracks in the bolt holes of the wing spars,
which could result in reduced structural integrity of a wing spar,
accomplish the following:
Ultrasonic Inspections
(a) Perform an ultrasonic inspection to detect fatigue cracking
of the bolt holes inboard and outboard of rib 9 on the bottom booms
of the front and rear wing spars, in accordance with Airbus Service
Bulletin A300-57-6037, dated August 1, 1994, or Revision 1, dated
August 31, 1995, at the applicable time specified in paragraph
(a)(1) or (a)(2) of this AD. Repeat the inspection thereafter at
intervals not to exceed 4,800 flight cycles or 11,000 flight hours,
whichever occurs first.
(1) For airplanes on which Airbus Modification 8842 (reference
Airbus Service Bulletin A300-57-6039) has not been installed:
Inspect at the earlier of the times specified by paragraphs
(a)(1)(i) and (a)(1)(ii) of this AD.
(i) Prior to the accumulation of 17,000 total flight cycles, or
within 2,000 flight cycles after May 10, 1995 (the effective date of
AD 95-07-05, amendment 39-9187), whichever occurs later.
(ii) Prior to the accumulation of 39,000 total flight hours.
(2) For airplanes on which Airbus Modification 8842 has been
installed: Inspect at the earlier of the times specified by
paragraphs (a)(2)(i) and (a)(2)(ii) of this AD.
(i) Within 17,000 flight cycles after accomplishment of Airbus
Modification 8842, or within 2,000 flight cycles after May 10, 1995,
whichever occurs later.
(ii) Within 39,000 flight hours after accomplishment of Airbus
Modification 8842.
Corrective Action
(b) If any crack is found, prior to further flight, repair in
accordance with Airbus Service Bulletin A300-57-6037, dated August
1, 1994, or Revision 1, dated August 31, 1995. Thereafter, perform
the repetitive inspections required by paragraph (a) of this AD.
Alternative Methods of Compliance
(c) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, International Branch, ANM-116, FAA,
Transport Airplane Directorate. Operators shall submit their
requests through an appropriate FAA Principal Maintenance Inspector,
who may add comments and then send it to the Manager, International
Branch, ANM-116.
Note 2: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the International Branch, ANM-116.
Special Flight Permits
(d) Special flight permits may be issued in accordance with
Secs. 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR
21.197 and 21.199) to operate the airplane to a location where the
requirements of this AD can be accomplished.
Incorporation by Reference
(e) The actions shall be done in accordance with Airbus Service
Bulletin A300-57-6037, dated August 1, 1994; or Airbus Service
Bulletin A300-57-6037, Revision 1, dated August 31, 1995, as
applicable. Airbus Service Bulletin A300-57-6037, Revision 1, dated
August 31, 1995, contains the following list of effective pages:
------------------------------------------------------------------------
Revision level
Page No. shown on page Date shown on page
------------------------------------------------------------------------
1, 2, 4-6.................... 1................ August 31, 1995.
3, 7-17...................... Original......... August 1, 1994.
------------------------------------------------------------------------
(1) The incorporation by reference of Airbus Service Bulletin
A300-57-6037, Revision 1, dated August 31, 1995, is approved by the
Director of the Federal Register in accordance with 5 U.S.C. 552(a)
and 1 CFR part 51.
(2) The incorporation by reference of Airbus Service Bulletin
A300-57-6037, dated August 1, 1994, was approved previously by the
Director of the Federal Register as of May 10, 1995 (60 FR 17990,
April 10, 1995).
(3) Copies may be obtained from Airbus Industrie, 1 Rond Point
Maurice Bellonte, 31707 Blagnac Cedex, France. Copies may be
inspected at the FAA, Transport Airplane Directorate, 1601 Lind
Avenue, SW., Renton, Washington; or at the Office of the Federal
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Note 3: The subject of this AD is addressed in French
airworthiness directive 94-208-169(B)R2, dated October 8, 1997.
(f) This amendment becomes effective on July 24, 2000.
Issued in Renton, Washington, on June 9, 2000.
Donald L. Riggin,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 00-15186 Filed 6-16-00; 8:45 am]
BILLING CODE 4910-13-U
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T04:38:33.257089+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 1e3a90f8fb4904498f2aeb6dc8a95c66eb802bdb11e7e285913e74cda316fdb0
- Text SHA-256
- eb82690fc707b23a9a5bb690a98c4893aa9157a38d36c2420d0637f4a49e0080
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.