Published 2001-11-26 · Federal Register document 01-29187
Airworthiness Directives; Boeing Model 747 Series Airplanes
Publication summary
This amendment supersedes an existing airworthiness directive (AD), applicable to certain Boeing Model 747 series airplanes, that currently requires repetitive detailed visual inspections to find discrepancies of the installation of the midspar fuse pins of the inboard and outboard struts, and follow-on actions, if necessary. That AD also provides for an optional terminating modification for the repetitive inspections. This amendment continues to require repetitive detailed visual inspections to find discrepancies of the installation of the midspar fuse pins of the inboard and outboard struts, and follow-on actions, if necessary. This amendment mandates accomplishment of the previously optional terminating modification. The actions specified by this AD are intended to find and fix discrepancies of the installation of the midspar fuse pins, which could result in loss of the secondary retention capability of the fuse pins, migration of the fuse pins, and consequent loss of the strut and engine from the airplane. This action is intended to address the identified unsafe condition.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:03.835669+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2001-8d66ddb74aa17366
- Source row
- results[475]
- Raw source SHA-256
- 8d66ddb74aa17366596c5f6ccb4e6d04532df19ae027b6fa003379bdedb52c7e
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2001-23-15
- Effective date printed in this edition
- 2001-12-31
Some source clauses remain unstructured. Read the complete publication for conditions that have not been interpreted here.
Read 2 complete recorded clauses
Applicability wording · Applicability
Applicability: Model 747 series airplanes, line numbers 1
through 1046 that have accomplished Airworthiness Directives 95-10-
16, 95-13-05, 95-13-06, or 95-13-07; and line numbers 1047 through
1271 inclusive; certificated in any category.
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
[[Page 58915]]
alternative method of compliance in accordance with paragraph (c)(1)
of this AD. The request should include an assessment of the effect
of the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not been
eliminated, the request should include specific proposed actions to
address it.
Exact source excerpt. Text positions 13545–14557, end exclusive, in the original decoded publication. SHA-256: 7c6177002130e211c0514502e2b64e6056ce33b4a937b24839c60e272a29a275
Compliance and requirements
Compliance: Required as indicated, unless accomplished
previously.
To find and fix discrepancies of the installation of the midspar
fuse pins of the inboard and outboard strut, which could result in
loss of the secondary retention capability of the fuse pins,
migration of the fuse pins, and consequent loss of the strut and
engine from the airplane; accomplish the following:
Restatement of the Requirements of AD 2001-05-05
Inspections/Follow-On Actions
(a) At the time specified in paragraph (a)(1) or (a)(2) of this
AD, as applicable: Do a detailed visual inspection to find
discrepancies (e.g., incorrect thread protrusion, which is less than
two threads protruding from the nut between the nut and the
secondary retention washer; incorrect gap between the fuse pin
primary nut and secondary retention washer; cracked or broken torque
stripe) of the installation of the midspar fuse pins of the inboard
and outboard struts, per Figure 2 of Boeing Service Bulletin 747-
54A2206, Revision 1, dated February 22, 2001, or Revision 2, dated
May 17, 2001.
(1) For airplanes having the production equivalent of one of the
AD's listed in Table 1 of this AD: Do the inspection at the later of
the times specified in paragraphs (a)(1)(i) and (a)(1)(ii) of this
AD.
(i) Before the accumulation of 8,000 total flight hours, or
within 24 months since manufacture of the airplane, whichever occurs
first.
(ii) Within 90 days after March 21, 2001 (the effective date of
AD 2001-05-05, amendment 39-12141).
(2) For airplanes modified per one of the AD's listed in Table 1
of this AD: Do the inspection at the later of the times specified in
paragraphs (a)(2)(i) and (a)(2)(ii) of this AD. Table 1 follows:
Table 1
------------------------------------------------------------------------
Amendment
AD No. No.
------------------------------------------------------------------------
AD 95-10-16.................................................. 39-9233
AD 95-13-05.................................................. 39-9285
AD 95-13-06.................................................. 39-9286
AD 95-13-07.................................................. 39-9287
------------------------------------------------------------------------
(i) Within 8,000 flight hours or 24 months after the
modification, whichever occurs first.
(ii) Within 90 days after March 21, 2001.
Note 2: Where there are differences between the AD and the
service bulletin, the AD prevails.
Note 3: For the purposes of this AD, a detailed visual
inspection is defined as: ``An intensive visual examination of a
specific structural area, system, installation, or assembly to
detect damage, failure, or irregularity. Available lighting is
normally supplemented with a direct source of good lighting at
intensity deemed appropriate by the inspector. Inspection aids such
as mirror, magnifying lenses, etc., may be used. Surface cleaning
and elaborate access procedures may be required.''
(A) If no discrepancy is found: Repeat the inspection at
intervals not to exceed 8,000 flight hours or 24 months, whichever
occurs first, until you do the terminating modification specified in
paragraph (b) of this AD.
(B) If any discrepancy is found, and the primary nut has backed
off and contacts the secondary retention washer: Before further
flight, do the terminating modification specified in paragraph (b)
of this AD.
(C) If any discrepancy is found, and the primary nut does not
contact the secondary retention washer: Repeat the inspection at
intervals not to exceed 90 days. Within 18 months after the initial
finding, or before March 21, 2001, whichever occurs later, do the
terminating modification specified in paragraph (b) of this AD.
Note 4: Inspections done prior to the effective date of this AD
per Boeing Alert Service Bulletin 747-54A2206, dated October 19,
2000, are acceptable for compliance with the inspections required by
paragraph (a) of this AD.
New Requirements of This AD
Terminating Action
(b) Within 6 years after the effective date of this AD: Do the
terminating modification (replacement of the primary nut of the
midspar fuse pin, installation of torque strip, a detailed visual
inspection of the fuse pin threads for damage, and replacement, if
necessary) per Figure 3 of Boeing Service Bulletin 747-54A2206,
Revision 1, dated February 22, 2001, or Figure 3 of Boeing Service
Bulletin 747-54A2206, Revision 2, dated May 17, 2001. Doing this
modification ends the repetitive inspections required by this AD.
Note 5: Doing the terminating modification prior to the
effective date of this AD per Boeing Alert Service Bulletin 747-
54A2206, dated October 19, 2000, is acceptable for compliance with
the terminating action required by paragraph (b) of this AD.
Alternative Methods of Compliance
(c)(1) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, Seattle Aircraft Certification
Office (ACO), FAA. Operators shall submit their requests through an
appropriate FAA Principal Maintenance Inspector, who may add
comments and then send it to the Manager, Seattle ACO.
(2) Any alternative method of compliance which was approved
previously in accordance with AD 2001-05-05 is approved for
compliance with this AD.
Note 6: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the Seattle ACO.
Special Flight Permits
(d) Special flight permits may be issued in accordance with
sections 21.197 and 21.199 of the Federal Aviation Regulations (14
CFR 21.197 and 21.199) to operate the airplane to a location where
the requirements of this AD can be accomplished.
Incorporation by Reference
(e) The actions shall be done in accordance with Boeing Service
Bulletin 747-54A2206, Revision 1, dated February 22, 2001; or Boeing
Service Bulletin 747-54A2206, Revision 2, dated May 17, 2001.
(1) The incorporation by reference of Boeing Service Bulletin
747-54A2206, Revision 2, dated May 17, 2001, is approved by the
Director of the Federal Register, in accordance with 5 U.S.C. 552(a)
and 1 CFR part 51.
(2) The incorporation by reference of Boeing Service Bulletin
747-54A2206, Revision 1, dated February 22, 2001, was approved
previously by the Director of the Federal Register as of March 21,
2001 (66 FR 13424, March 6, 2001).
(3) Copies may be obtained from Boeing Commercial Airplane
Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be
inspected at the FAA, Transport Airplane Directorate, 1601 Lind
Avenue, SW., Renton, Washington; or at the Office of the Federal
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Effective Date
(f) This amendment becomes effective on December 31, 2001.
Exact source excerpt. Text positions 14557–21700, end exclusive, in the original decoded publication. SHA-256: 39d29bb4abb2b9235821a5e9c78fb1f06459575c5ead27c6b524d8534234d1a6
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2001-23-15 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 57e660014ae62ba73556f7c221ce7d5e837d3fb5e38c07a35d88afeb422ede7f. Source manifest: a3cda7851b164dc30d44470fc976214a6a0d28c359f7142f756342c245829676.
Official source · 2001-11-26
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 66, Number 227 (Monday, November 26, 2001)]
[Rules and Regulations]
[Pages 58913-58915]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 01-29187]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
Prices of new books are listed in the first FEDERAL REGISTER issue of each
week.
========================================================================
Federal Register / Vol. 66, No. 227 / Monday, November 26, 2001 /
Rules and Regulations
[[Page 58913]]
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 2001-NM-02-AD; Amendment 39-12514; AD 2001-23-15]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 747 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment supersedes an existing airworthiness directive
(AD), applicable to certain Boeing Model 747 series airplanes, that
currently requires repetitive detailed visual inspections to find
discrepancies of the installation of the midspar fuse pins of the
inboard and outboard struts, and follow-on actions, if necessary. That
AD also provides for an optional terminating modification for the
repetitive inspections. This amendment continues to require repetitive
detailed visual inspections to find discrepancies of the installation
of the midspar fuse pins of the inboard and outboard struts, and
follow-on actions, if necessary. This amendment mandates accomplishment
of the previously optional terminating modification. The actions
specified by this AD are intended to find and fix discrepancies of the
installation of the midspar fuse pins, which could result in loss of
the secondary retention capability of the fuse pins, migration of the
fuse pins, and consequent loss of the strut and engine from the
airplane. This action is intended to address the identified unsafe
condition.
DATES: Effective December 31, 2001.
The incorporation by reference of Boeing Service Bulletin 747-
54A2206, Revision 2, dated May 17, 2001, as listed in the regulations,
is approved by the Director of the Federal Register, as of December 31,
2001.
The incorporation by reference of Boeing Service Bulletin 747-
54A2206, Revision 1, dated February 22, 2001, as listed in the
regulations, was approved previously by the Director of the Federal
Register as of March 21, 2001 (66 FR 13424, March 6, 2001).
ADDRESSES: The service information referenced in this AD may be
obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle,
Washington 98124-2207. This information may be examined at the Federal
Aviation Administration (FAA), Transport Airplane Directorate, Rules
Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of
the Federal Register, 800 North Capitol Street, NW., suite 700,
Washington, DC.
FOR FURTHER INFORMATION CONTACT: Tamara Anderson, Aerospace Engineer,
Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office,
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425)
227-2771; fax (425) 227-1181.
SUPPLEMENTARY INFORMATION: Existing airworthiness directive AD 2001-05-
05, amendment 39-12141 (66 FR 13424), applicable to certain Boeing
Model 747 series airplanes, was published in the Federal Register on
March 6, 2001 as a final rule with request for comments. This AD
requires repetitive detailed visual inspections to find discrepancies
of the installation of the midspar fuse pins of the inboard and
outboard struts, and follow-on actions, if necessary. This AD also
provides for an optional terminating modification for the repetitive
inspections. The rule became effective on March 21, 2001.
A proposal to amend part 39 of the Federal Aviation Regulations (14
CFR part 39) by superseding AD 2001-05-05 was published in the Federal
Register on April 26, 2001 (66 FR 20950). The action proposed to
continue to require repetitive detailed visual inspections to find
discrepancies of the installation of the midspar fuse pins of the
inboard and outboard struts, and follow-on actions, if necessary. The
action also proposed to mandate accomplishment of the previously
optional terminating modification.
Actions Since the Issuance of the NPRM
Since the issuance of the NPRM, the FAA has reviewed and approved
Boeing Service Bulletin 747-54A2206, Revision 2, dated May 17, 2001.
Revision 2 describes procedures for use of an alternate replacement
nut, in addition to the replacement nut specified in Revision 1, dated
February 22, 2001.
Comments
Interested persons have been afforded an opportunity to participate
in the making of this rule. The FAA received comments regarding both AD
2001-05-05 and the proposed rule having Docket Number 2001-NM-02-AD.
These comments and our response are presented below.
I. Comments to AD 2001-05-05
Request for Use of an Alternate Replacement Nut
One commenter requests that the FAA provide for use of an alternate
replacement for the primary retention nut having part number (P/N)
BACN10JC24CD, which is listed in Boeing Service Bulletin 747-54A2206,
Revision 1, dated February 22, 2001. The commenter states that the
replacement nuts specified in AD 2001-05-05 are not readily available
from the manufacturer.
The FAA concurs, and has changed this final rule accordingly by
approving Boeing Service Bulletin 747-54A2206, Revision 2, dated May
17, 2001, which provides for use of an alternate replacement nut.
Request for Increase of Repetitive Inspection Interval
Another commenter asks that the repetitive inspection interval
specified in paragraph (a) be increased from 8,000 flight hours to
8,500 flight hours to facilitate inspections at the C-check.
The FAA does not concur because the specified repetitive interval
is based on the recommendation of the manufacturer and on the C-check
schedule of the majority of operators. However, the FAA notes that the
commenter may apply for an alternative method of compliance, in
accordance with paragraph (c)(1) of this AD.
II. Comments to 2001-NM-02-AD
Request To Continue Terminating Action as Optional
One commenter objects to the proposal to mandate accomplishment of
the previously optional terminating action. The commenter cites two
[[Page 58914]]
reasons for its objection: (1) It has found no instances of backed-off
primary retention nuts for the midspar fuse pins on the inboard and the
outboard strut, and (2) there are two fuse pin retention devices in
place, which are designed to prevent midspar fuse pin migration.
The FAA does not concur that the previously optional terminating
action should remain optional. The unsafe condition has resulted in at
least three incidents of the primary retention nut on the midspar
fitting fuse pin backing off. In one of these incidents, the primary
retention nut contacted the secondary retention washer. This action
will require that the terminating action be performed within 6 years.
If the repetitive inspections reveal a discrepancy, the terminating
action must be performed sooner. Therefore, no change to the final rule
has been made in response to this comment.
Request for Clarification of Applicability
The manufacturer requests that the wording in paragraph (a)(1) of
the proposed AD be changed from ``For airplanes modified per the
production equivalent of one of the AD's listed in Table 1 of this
AD:'' to ``For airplanes having the production equivalent of one of the
AD's listed in Table I of this AD:'' and that AD 99-10-10 be removed
from Table 1.
The FAA agrees that these changes will provide clarification and
has changed paragraph (a)(1) of this AD accordingly. In line with this
change, the FAA has also revised the applicability of this AD to
specify this clarification.
Request To Revise Cost Impact
One commenter requests that the FAA revise the Cost Impact
paragraph to reflect that at least 12 work-hours may be necessary to
perform the required action rather than the 4 work-hours cited in the
proposed rule.
The FAA does not concur. The cost analysis of the AD is limited to
the cost of actions actually required by the rule. It does not consider
the costs of ``on condition'' actions, such as replacing a nut, if
replacement is needed during a required inspection. Such ``on-
condition'' actions would be required to be accomplished, regardless of
AD direction, in order to correct an unsafe condition identified in an
airplane and to ensure operation of that airplane in an airworthy
condition, as required by the Federal Aviation Regulations. In
addition, the FAA recognizes that, in accomplishing the requirements of
any AD, operators may incur ``incidental'' costs in addition to the
``direct'' costs that are reflected in the cost analysis presented in
the AD preamble. However, the cost analysis in AD rulemaking actions
typically does not include incidental costs, such as the time required
to gain access and close up; planning time; or time necessitated by
other administrative requirements. No change to the cost impact is
necessary in the final rule.
Conclusion
After careful review of the available data, including the comments
noted above, the FAA has determined that air safety and the public
interest require the adoption of the rule with the changes described
above. The FAA has determined that these changes will neither increase
the economic burden on any operator nor increase the scope of the AD.
Cost Impact
There are approximately 1,111 Boeing Model 747 series airplanes of
the affected design in the worldwide fleet. The FAA estimates that 256
airplanes of U.S. registry will be affected by this AD.
The inspections that are currently required by AD 2001-05-05 take
approximately 4 work hours per airplane to accomplish, at an average
labor rate of $60 per work hour. Based on these figures, the cost
impact of the currently required inspections on U.S. operators is
estimated to be $61,440, or $240 per airplane, per inspection cycle.
The terminating modification that is required by this new AD will
take approximately 4 work hours per airplane to accomplish, at an
average labor rate of $60 per work hour. Required parts will cost
approximately $1,000 per airplane. Based on these figures, the cost
impact of the modification required by this AD on U.S. will be
$317,440, or $1,240 per airplane.
The cost impact figures discussed above are based on assumptions
that no operator has yet accomplished any of the requirements of this
AD action, and that no operator would accomplish those actions in the
future if this AD were not adopted. The cost impact figures discussed
in AD rulemaking actions represent only the time necessary to perform
the specific actions actually required by the AD. These figures
typically do not include incidental costs, such as the time required to
gain access and close up, planning time, or time necessitated by other
administrative actions.
Regulatory Impact
The regulations adopted herein will not have a substantial direct
effect on the States, on the relationship between the national
Government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, it
is determined that this final rule does not have federalism
implications under Executive Order 13132.
For the reasons discussed above, I certify that this action (1) Is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the Rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends part 39 of
the Federal Aviation Regulations (14 CFR part 39) as follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
2. Section 39.13 is amended by removing amendment 39-12141 (66 FR
13424, March 6, 2001), and by adding a new airworthiness directive
(AD), amendment 39-12514, to read as follows:
2001-23-15 Boeing: Docket 2001-NM-02-AD. Supersedes AD 2001-05-05,
amendment 39-12141.
Applicability: Model 747 series airplanes, line numbers 1
through 1046 that have accomplished Airworthiness Directives 95-10-
16, 95-13-05, 95-13-06, or 95-13-07; and line numbers 1047 through
1271 inclusive; certificated in any category.
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
[[Page 58915]]
alternative method of compliance in accordance with paragraph (c)(1)
of this AD. The request should include an assessment of the effect
of the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not been
eliminated, the request should include specific proposed actions to
address it.
Compliance: Required as indicated, unless accomplished
previously.
To find and fix discrepancies of the installation of the midspar
fuse pins of the inboard and outboard strut, which could result in
loss of the secondary retention capability of the fuse pins,
migration of the fuse pins, and consequent loss of the strut and
engine from the airplane; accomplish the following:
Restatement of the Requirements of AD 2001-05-05
Inspections/Follow-On Actions
(a) At the time specified in paragraph (a)(1) or (a)(2) of this
AD, as applicable: Do a detailed visual inspection to find
discrepancies (e.g., incorrect thread protrusion, which is less than
two threads protruding from the nut between the nut and the
secondary retention washer; incorrect gap between the fuse pin
primary nut and secondary retention washer; cracked or broken torque
stripe) of the installation of the midspar fuse pins of the inboard
and outboard struts, per Figure 2 of Boeing Service Bulletin 747-
54A2206, Revision 1, dated February 22, 2001, or Revision 2, dated
May 17, 2001.
(1) For airplanes having the production equivalent of one of the
AD's listed in Table 1 of this AD: Do the inspection at the later of
the times specified in paragraphs (a)(1)(i) and (a)(1)(ii) of this
AD.
(i) Before the accumulation of 8,000 total flight hours, or
within 24 months since manufacture of the airplane, whichever occurs
first.
(ii) Within 90 days after March 21, 2001 (the effective date of
AD 2001-05-05, amendment 39-12141).
(2) For airplanes modified per one of the AD's listed in Table 1
of this AD: Do the inspection at the later of the times specified in
paragraphs (a)(2)(i) and (a)(2)(ii) of this AD. Table 1 follows:
Table 1
------------------------------------------------------------------------
Amendment
AD No. No.
------------------------------------------------------------------------
AD 95-10-16.................................................. 39-9233
AD 95-13-05.................................................. 39-9285
AD 95-13-06.................................................. 39-9286
AD 95-13-07.................................................. 39-9287
------------------------------------------------------------------------
(i) Within 8,000 flight hours or 24 months after the
modification, whichever occurs first.
(ii) Within 90 days after March 21, 2001.
Note 2: Where there are differences between the AD and the
service bulletin, the AD prevails.
Note 3: For the purposes of this AD, a detailed visual
inspection is defined as: ``An intensive visual examination of a
specific structural area, system, installation, or assembly to
detect damage, failure, or irregularity. Available lighting is
normally supplemented with a direct source of good lighting at
intensity deemed appropriate by the inspector. Inspection aids such
as mirror, magnifying lenses, etc., may be used. Surface cleaning
and elaborate access procedures may be required.''
(A) If no discrepancy is found: Repeat the inspection at
intervals not to exceed 8,000 flight hours or 24 months, whichever
occurs first, until you do the terminating modification specified in
paragraph (b) of this AD.
(B) If any discrepancy is found, and the primary nut has backed
off and contacts the secondary retention washer: Before further
flight, do the terminating modification specified in paragraph (b)
of this AD.
(C) If any discrepancy is found, and the primary nut does not
contact the secondary retention washer: Repeat the inspection at
intervals not to exceed 90 days. Within 18 months after the initial
finding, or before March 21, 2001, whichever occurs later, do the
terminating modification specified in paragraph (b) of this AD.
Note 4: Inspections done prior to the effective date of this AD
per Boeing Alert Service Bulletin 747-54A2206, dated October 19,
2000, are acceptable for compliance with the inspections required by
paragraph (a) of this AD.
New Requirements of This AD
Terminating Action
(b) Within 6 years after the effective date of this AD: Do the
terminating modification (replacement of the primary nut of the
midspar fuse pin, installation of torque strip, a detailed visual
inspection of the fuse pin threads for damage, and replacement, if
necessary) per Figure 3 of Boeing Service Bulletin 747-54A2206,
Revision 1, dated February 22, 2001, or Figure 3 of Boeing Service
Bulletin 747-54A2206, Revision 2, dated May 17, 2001. Doing this
modification ends the repetitive inspections required by this AD.
Note 5: Doing the terminating modification prior to the
effective date of this AD per Boeing Alert Service Bulletin 747-
54A2206, dated October 19, 2000, is acceptable for compliance with
the terminating action required by paragraph (b) of this AD.
Alternative Methods of Compliance
(c)(1) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, Seattle Aircraft Certification
Office (ACO), FAA. Operators shall submit their requests through an
appropriate FAA Principal Maintenance Inspector, who may add
comments and then send it to the Manager, Seattle ACO.
(2) Any alternative method of compliance which was approved
previously in accordance with AD 2001-05-05 is approved for
compliance with this AD.
Note 6: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the Seattle ACO.
Special Flight Permits
(d) Special flight permits may be issued in accordance with
sections 21.197 and 21.199 of the Federal Aviation Regulations (14
CFR 21.197 and 21.199) to operate the airplane to a location where
the requirements of this AD can be accomplished.
Incorporation by Reference
(e) The actions shall be done in accordance with Boeing Service
Bulletin 747-54A2206, Revision 1, dated February 22, 2001; or Boeing
Service Bulletin 747-54A2206, Revision 2, dated May 17, 2001.
(1) The incorporation by reference of Boeing Service Bulletin
747-54A2206, Revision 2, dated May 17, 2001, is approved by the
Director of the Federal Register, in accordance with 5 U.S.C. 552(a)
and 1 CFR part 51.
(2) The incorporation by reference of Boeing Service Bulletin
747-54A2206, Revision 1, dated February 22, 2001, was approved
previously by the Director of the Federal Register as of March 21,
2001 (66 FR 13424, March 6, 2001).
(3) Copies may be obtained from Boeing Commercial Airplane
Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be
inspected at the FAA, Transport Airplane Directorate, 1601 Lind
Avenue, SW., Renton, Washington; or at the Office of the Federal
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Effective Date
(f) This amendment becomes effective on December 31, 2001.
Issued in Renton, Washington, on November 15, 2001.
Kalene C. Yanamura,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 01-29187 Filed 11-23-01; 8:45 am]
BILLING CODE 4910-13-U
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T04:24:51.064074+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- cc450690032f8d86e8887094d0ae7deaa26a4705a663bdb095f7ebbb67d69432
- Text SHA-256
- 57e660014ae62ba73556f7c221ce7d5e837d3fb5e38c07a35d88afeb422ede7f
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.