Published 2001-12-12 · Federal Register document 01-30202
Airworthiness Directives; Airbus Model A300 B2 and B4, A300 B4-600 and B4-600R, and A310 Series Airplanes
Publication summary
This amendment adopts a new airworthiness directive (AD), applicable to certain Airbus Model A300 B2 and B4, A300 B4-600 and B4- 600R, and A310 series airplanes, that requires modification of the terminal blocks of the starter feeder line of the auxiliary power unit (APU). This action is necessary to prevent slackness and subsequent overheat and arcing of certain wiring connections. This action is intended to address the identified unsafe condition.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:03.835669+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2001-8d66ddb74aa17366
- Source row
- results[513]
- Raw source SHA-256
- 8d66ddb74aa17366596c5f6ccb4e6d04532df19ae027b6fa003379bdedb52c7e
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2001-24-26
- Effective date printed in this edition
- 2002-01-16
Some source clauses remain unstructured. Read the complete publication for conditions that have not been interpreted here.
Read 2 complete recorded clauses
Applicability wording · Applicability
Applicability: The following airplanes, certificated in any
category:
Table 1.--Applicability
----------------------------------------------------------------------------------------------------------------
Excluding those airplanes modified per Airbus Modification 10212, or
Model Airbus Service Bulletin
----------------------------------------------------------------------------------------------------------------
A300 B2 and B4 series airplanes....... A300-24-0079, Revision 02, dated January 3, 2001.
A300 B4-600 and B4-600R series A300-24-6034, Revision 03, dated April 6, 2001.
airplanes.
A310 series airplanes................. A310-24-2045, Revision 05, dated April 6, 2001.
----------------------------------------------------------------------------------------------------------------
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
otherwise modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
alternative method of compliance in accordance with paragraph (b) of
this AD. The request should include an assessment of the effect of
the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not been
eliminated, the request should include specific proposed actions to
address it.
Exact source excerpt. Text positions 5580–7301, end exclusive, in the original decoded publication. SHA-256: f8ccdc4bc5713f2d4409aeff267a51a26873e9c02cf7b77dd8c73483b210c91f
Compliance and requirements
Compliance: Required as indicated, unless accomplished
previously.
To prevent slackness and subsequent overheat and arcing of
certain wiring connections, accomplish the following:
Modification and Replacement
(a) Modify the terminal blocks (including a general visual
inspection of the threaded portion of the lugs to detect damage,
distortion, or elongation; measurement of stud dimensions; and re-
identification of the terminal blocks), as specified by Table 2 of
this AD. If any discrepancy is detected, prior to further flight,
replace the terminal block with a new part in accordance with the
applicable service bulletin. Table 2 follows:
Table 2.--Modification Requirements
------------------------------------------------------------------------
Prior to the times
Perform the specified by
modification in paragraphs (i) and
For Model accordance with (ii), whichever
Airbus Service occurs later, for
Bulletin each model
------------------------------------------------------------------------
(1) A300 B2 and B4 series A300-24-0079, (i) The accumulation
airplanes. Revision 02, of 32,000 total
dated January 3, flight cycles or
2001. 40,000 total flight
hours, whichever
occurs first.
(ii) 3,600 flight
cycles after the
effective date of
this AD.
(2) A300 B4-600 and B4-600R A300-24-6034, (i) The accumulation
series airplanes. Revision 03, of 26,000 total
dated April 6, flight cycles or
2001. 40,000 flight hours,
whichever occurs
first.
(ii) 3,600 flight
cycles after the
effective date of
this AD.
(3) A310 series airplanes..... A310-24-2045, (i) The accumulation
Revision 05, of 26,000 total
dated April 6, flight cycles or
2001. 40,000 flight hours,
whichever occurs
first.
(ii) 3,600 flight
cycles after the
effective date of
this AD.
------------------------------------------------------------------------
Note 2: For the purposes of this AD, a general visual inspection
is defined as: ``A visual examination of an interior or exterior
area, installation, or assembly to detect obvious damage, failure,
or irregularity. This level of inspection is made under normally
available lighting conditions such as daylight, hangar lighting,
flashlight, or drop-light, and may require removal or opening of
access panels or doors. Stands, ladders, or platforms may be
required to gain proximity to the area being checked.''
Note 3: Modification, prior to the effective date of this AD, in
accordance with Airbus Service Bulletin A300-24-0079, dated March
15, 1993, or Revision 01, dated September 22, 1993 (for Model A300
B2 and B4 series airplanes); A300-24-6034, dated March 15, 1993,
Revision 01, dated September 22, 1993; or Revision 02, dated
September 7, 1994 (for Model A300 B4-600 and B4-600R series
airplanes); or A310-24-2045, dated March 15, 1993, Revision 01,
dated September 22, 1993, Revision 02, dated September 7, 1994,
Revision 03, dated February 24, 1995, or Revision 04, dated November
24, 1995 (for Model A310 series airplanes); is acceptable for
compliance with the requirements of paragraph (a) of this AD.
Alternative Methods of Compliance
(b) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, International Branch, ANM-116,
Transport Airplane Directorate, FAA. Operators shall submit their
requests through an appropriate FAA Principal Maintenance Inspector,
who may add comments and then send it to the Manager, International
Branch, ANM-116.
Note 4: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the International Branch, ANM-116.
Special Flight Permits
(c) Special flight permits may be issued in accordance with
sections 21.197 and 21.199 of the Federal Aviation Regulations (14
CFR 21.197 and 21.199) to operate the airplane to a location where
the requirements of this AD can be accomplished.
Incorporation by Reference
(d) The actions shall be done in accordance with Airbus Service
Bulletin A300-24-0079, Revision 02, dated January 3, 2001; Airbus
Service Bulletin A300-24-6034, Revision 03, dated April 6, 2001; or
Airbus Service Bulletin A310-24-2045, Revision 05, dated April 6,
2001; as applicable. This incorporation by reference was approved by
the Director of the Federal Register in accordance with 5 U.S.C.
552(a) and 1 CFR part 51. Copies may be obtained from Airbus
Industrie, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex,
France. Copies may be inspected at the FAA, Transport Airplane
[[Page 64114]]
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the
Office of the Federal Register, 800 North Capitol Street, NW., suite
700, Washington, DC.
Note 5: The subject of this AD is addressed in French
airworthiness directive 2001-266(B), dated June 27, 2001.
Effective Date
(e) This amendment becomes effective on January 16, 2002.
Exact source excerpt. Text positions 7301–13858, end exclusive, in the original decoded publication. SHA-256: 48419bb6784ab91906040f56d8c3a594eb38dc2edc56b096bcda19a6db18192b
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2001-24-26 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: d0b5e19f4c1445967f3d3b32d8abf0226aebb461a0c9e3dd5e4b15f627903564. Source manifest: 20864c11b921dface716641903b3aebc9586fe88d45e3643d1d346a142889c88.
Official source · 2001-12-12
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 66, Number 239 (Wednesday, December 12, 2001)]
[Rules and Regulations]
[Pages 64112-64114]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 01-30202]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 2001-NM-204-AD; Amendment 39-12543; AD 2001-24-26]
RIN 2120-AA64
Airworthiness Directives; Airbus Model A300 B2 and B4, A300 B4-
600 and B4-600R, and A310 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment adopts a new airworthiness directive (AD),
applicable to certain Airbus Model A300 B2 and B4, A300 B4-600 and B4-
600R, and A310 series airplanes, that requires modification of the
terminal blocks of the starter feeder line of the auxiliary power unit
(APU). This action is necessary to prevent slackness and subsequent
overheat and arcing of certain wiring connections. This action is
intended to address the identified unsafe condition.
DATES: Effective January 16, 2002.
The incorporation by reference of certain publications listed in
the regulations is approved by the Director of the Federal Register as
of January 16, 2002.
ADDRESSES: The service information referenced in this AD may be
obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707
Blagnac Cedex, France. This information may be examined at the Federal
Aviation Administration (FAA), Transport Airplane Directorate, Rules
Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of
the Federal Register, 800 North Capitol Street, NW., suite 700,
Washington, DC.
FOR FURTHER INFORMATION CONTACT: Dan Rodina, Aerospace Engineer,
International Branch, ANM-116, FAA, Transport Airplane Directorate,
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425)
227-2125; fax (425) 227-1149.
SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal
Aviation Regulations (14 CFR part 39) to include an airworthiness
directive (AD) that is applicable to certain Airbus Model A300 B2 and
B4, A300 B4-600 and B4-600R, and A310 series airplanes was published in
the Federal Register on August 27, 2001 (66 FR 44990). That action
proposed to require modification of the terminal blocks of the starter
feeder line of the auxiliary power unit (APU).
Comments
Interested persons have been afforded an opportunity to participate
in the making of this amendment. No comments were submitted in response
to the proposal or the FAA's determination of the cost to the public.
Conclusion
The FAA has determined that air safety and the public interest
require the adoption of the rule as proposed.
Cost Impact
The FAA estimates that 153 airplanes of U.S. registry will be
affected by this AD. It will take approximately 1 to 3 work hours per
airplane (depending on configuration) to accomplish the required
actions, at an average labor rate of $60 per work hour. Based on these
figures, the cost impact of the AD on U.S. operators is estimated to be
$60 to $180 per airplane.
The cost impact figure discussed above is based on assumptions that
no operator has yet accomplished any of the requirements of this AD
action, and that no operator would accomplish those actions in the
future if this AD were not adopted. The cost impact figures discussed
in AD rulemaking actions represent only the time necessary to perform
the specific actions actually required by the AD. These figures
typically do not include incidental costs, such as the time required to
gain access and close up, planning time, or time necessitated by other
administrative actions.
Regulatory Impact
The regulations adopted herein will not have a substantial direct
effect on the States, on the relationship between the national
Government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, it
is determined that this final rule does not have federalism
implications under Executive Order 13132.
For the reasons discussed above, I certify that this action (1) is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the Rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
``ADDRESSES.''
[[Page 64113]]
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends part 39 of
the Federal Aviation Regulations (14 CFR part 39) as follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
2. Section 39.13 is amended by adding the following new
airworthiness directive:
2001-24-26 Airbus Industrie: Amendment 39-12543. Docket 2001-NM-
204-AD.
Applicability: The following airplanes, certificated in any
category:
Table 1.--Applicability
----------------------------------------------------------------------------------------------------------------
Excluding those airplanes modified per Airbus Modification 10212, or
Model Airbus Service Bulletin
----------------------------------------------------------------------------------------------------------------
A300 B2 and B4 series airplanes....... A300-24-0079, Revision 02, dated January 3, 2001.
A300 B4-600 and B4-600R series A300-24-6034, Revision 03, dated April 6, 2001.
airplanes.
A310 series airplanes................. A310-24-2045, Revision 05, dated April 6, 2001.
----------------------------------------------------------------------------------------------------------------
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
otherwise modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
alternative method of compliance in accordance with paragraph (b) of
this AD. The request should include an assessment of the effect of
the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not been
eliminated, the request should include specific proposed actions to
address it.
Compliance: Required as indicated, unless accomplished
previously.
To prevent slackness and subsequent overheat and arcing of
certain wiring connections, accomplish the following:
Modification and Replacement
(a) Modify the terminal blocks (including a general visual
inspection of the threaded portion of the lugs to detect damage,
distortion, or elongation; measurement of stud dimensions; and re-
identification of the terminal blocks), as specified by Table 2 of
this AD. If any discrepancy is detected, prior to further flight,
replace the terminal block with a new part in accordance with the
applicable service bulletin. Table 2 follows:
Table 2.--Modification Requirements
------------------------------------------------------------------------
Prior to the times
Perform the specified by
modification in paragraphs (i) and
For Model accordance with (ii), whichever
Airbus Service occurs later, for
Bulletin each model
------------------------------------------------------------------------
(1) A300 B2 and B4 series A300-24-0079, (i) The accumulation
airplanes. Revision 02, of 32,000 total
dated January 3, flight cycles or
2001. 40,000 total flight
hours, whichever
occurs first.
(ii) 3,600 flight
cycles after the
effective date of
this AD.
(2) A300 B4-600 and B4-600R A300-24-6034, (i) The accumulation
series airplanes. Revision 03, of 26,000 total
dated April 6, flight cycles or
2001. 40,000 flight hours,
whichever occurs
first.
(ii) 3,600 flight
cycles after the
effective date of
this AD.
(3) A310 series airplanes..... A310-24-2045, (i) The accumulation
Revision 05, of 26,000 total
dated April 6, flight cycles or
2001. 40,000 flight hours,
whichever occurs
first.
(ii) 3,600 flight
cycles after the
effective date of
this AD.
------------------------------------------------------------------------
Note 2: For the purposes of this AD, a general visual inspection
is defined as: ``A visual examination of an interior or exterior
area, installation, or assembly to detect obvious damage, failure,
or irregularity. This level of inspection is made under normally
available lighting conditions such as daylight, hangar lighting,
flashlight, or drop-light, and may require removal or opening of
access panels or doors. Stands, ladders, or platforms may be
required to gain proximity to the area being checked.''
Note 3: Modification, prior to the effective date of this AD, in
accordance with Airbus Service Bulletin A300-24-0079, dated March
15, 1993, or Revision 01, dated September 22, 1993 (for Model A300
B2 and B4 series airplanes); A300-24-6034, dated March 15, 1993,
Revision 01, dated September 22, 1993; or Revision 02, dated
September 7, 1994 (for Model A300 B4-600 and B4-600R series
airplanes); or A310-24-2045, dated March 15, 1993, Revision 01,
dated September 22, 1993, Revision 02, dated September 7, 1994,
Revision 03, dated February 24, 1995, or Revision 04, dated November
24, 1995 (for Model A310 series airplanes); is acceptable for
compliance with the requirements of paragraph (a) of this AD.
Alternative Methods of Compliance
(b) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, International Branch, ANM-116,
Transport Airplane Directorate, FAA. Operators shall submit their
requests through an appropriate FAA Principal Maintenance Inspector,
who may add comments and then send it to the Manager, International
Branch, ANM-116.
Note 4: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the International Branch, ANM-116.
Special Flight Permits
(c) Special flight permits may be issued in accordance with
sections 21.197 and 21.199 of the Federal Aviation Regulations (14
CFR 21.197 and 21.199) to operate the airplane to a location where
the requirements of this AD can be accomplished.
Incorporation by Reference
(d) The actions shall be done in accordance with Airbus Service
Bulletin A300-24-0079, Revision 02, dated January 3, 2001; Airbus
Service Bulletin A300-24-6034, Revision 03, dated April 6, 2001; or
Airbus Service Bulletin A310-24-2045, Revision 05, dated April 6,
2001; as applicable. This incorporation by reference was approved by
the Director of the Federal Register in accordance with 5 U.S.C.
552(a) and 1 CFR part 51. Copies may be obtained from Airbus
Industrie, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex,
France. Copies may be inspected at the FAA, Transport Airplane
[[Page 64114]]
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the
Office of the Federal Register, 800 North Capitol Street, NW., suite
700, Washington, DC.
Note 5: The subject of this AD is addressed in French
airworthiness directive 2001-266(B), dated June 27, 2001.
Effective Date
(e) This amendment becomes effective on January 16, 2002.
Issued in Renton, Washington, on November 28, 2001.
Vi L. Lipski,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 01-30202 Filed 12-11-01; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T04:24:13.522816+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 1ab70035ce49017236d45d5aeff2724875b6f866a0fbf91b22f634a7aa9c4af3
- Text SHA-256
- d0b5e19f4c1445967f3d3b32d8abf0226aebb461a0c9e3dd5e4b15f627903564
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.