Published 2004-11-26 · Federal Register document 04-25788
Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-135 and -145 Series Airplanes
Publication summary
This amendment supersedes an existing airworthiness directive (AD), applicable to certain EMBRAER Model EMB-135 and -45 series airplanes. The existing AD currently requires a one-time inspection to detect incorrect wiring of the electrical connectors to the pressure switches and cartridges on the fire extinguisher bottles for the engines and the auxiliary power unit (APU); disconnection and reconnection of the wiring, as necessary; and adjustment of the length of the harnesses on the fire extinguisher bottles to avoid future misconnections. This amendment requires additional adjustment of the length of the harnesses; installation of a color-coded identification system to avoid misconnections during maintenance; and a functional test of the engine fire extinguisher system. This amendment also expands the applicability of the existing AD to include additional airplanes. The actions specified by this AD are intended to prevent the issuance of erroneous commands or the receipt of erroneous information pertaining to the fire extinguisher system for the engines and the APU, which could result in the inability to put out a fire in an engine or in the APU. This action is intended to address the identified unsafe condition.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:13.905821+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2004-cb1e1f18d61cac01
- Source row
- results[498]
- Raw source SHA-256
- cb1e1f18d61cac01616802134d899b0c8ce1a9f79716b5ee037f78e4cb53a00a
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2004-23-19
- Effective date printed in this edition
- 2005-01-03
Some source clauses remain unstructured. Read the complete publication for conditions that have not been interpreted here.
Read 2 complete recorded clauses
Applicability wording · Applicability
Applicability: Model EMB-135 and -145 series airplanes, as listed in EMBRAER Service Bulletin 145-26-0010, Change 03, dated August 28, 2002; certificated in any category.
Exact source excerpt. Text positions 9643–9820, end exclusive, in the original decoded publication. SHA-256: 2ed6ef3260d07bf7adfbb823c814fd2bfbd59efacd8283d7802355975f414229
Compliance and requirements
Compliance: Required as indicated, unless accomplished
previously.
To prevent the issuance of erroneous commands or the receipt of
erroneous information pertaining to the fire extinguisher system for
the engines and auxiliary power unit (APU), which could result in
the inability to put out a fire in an engine or in the APU,
accomplish the following:
Restatement of the Requirements of AD 2001-10-15
Inspection
(a) For airplanes listed in EMBRAER Service Bulletin 145-26-
0009, dated January 26, 2001: Within 100 flight hours after June 8,
2001 (the effective date of AD 2001-10-15, amendment 39-12241),
perform a one-time general visual inspection to detect incorrect
wiring of electrical connectors to the pressure switches and
cartridges on the fire extinguisher bottles for the engines and the
APU, in accordance with paragraph 3.D. of the Accomplishment
Instructions of EMBRAER Service Bulletin 145-26-0009, dated January
26, 2001; or Change 01, dated June 25, 2001.
Note 1: For the purposes of this AD, a general visual inspection
is defined as: ``A visual examination of an interior or exterior
area, installation, or assembly to detect obvious damage, failure,
or irregularity. This level of inspection is made under normally
available lighting conditions such as daylight, hangar lighting,
flashlight, or droplight, and may require removal or opening of
access panels or doors. Stands, ladders, or platforms may be
required to gain proximity to the area being checked.''
(1) If the wiring connections are correct: Prior to further
flight, adjust the length of the harnesses to the fire extinguisher
bottles, in accordance with the service bulletin.
(2) If the wiring connections are incorrect: Prior to further
flight, re-connect them and adjust the length of the harnesses to
the fire extinguisher bottles, in accordance with the service
bulletin.
New Requirements of This AD
Inspection
(b) For airplanes not subject to paragraph (a) of this AD:
Within 100 flight hours after the effective date of this AD, perform
a one-time general visual inspection to detect incorrect wiring of
electrical connectors to the pressure switches and cartridges on the
fire extinguisher bottles for the engines and the APU, in accordance
with paragraph 3.D. of the Accomplishment Instructions of EMBRAER
Service Bulletin 145-26-0009, Change 01, dated June 25, 2001.
(1) If the wiring connections are correct: Prior to further
flight, adjust the length of the harnesses to the fire extinguisher
bottles, in accordance with the service bulletin.
(2) If the wiring connections are incorrect: Prior to further
flight, re-connect them and adjust the length of the harnesses to
the fire extinguisher bottles, in accordance with the service
bulletin.
Modifications
(c) For all airplanes: Within 4,000 flight hours after the
effective date of this AD, modify the electrical harnesses and
electrical connectors of the engine and APU fire extinguisher
system, including installing identification sleeves and color-coded
identification stickers, in accordance with the Accomplishment
Instructions of EMBRAER Service Bulletin 145-26-0010, Change 03,
dated August 28, 2002.
[[Page 68775]]
Parts Installation
(d) As of the effective date of this AD, no person may install
on any airplane, engine fire extinguisher bottle part number (P/N)
33600057-1 or P/N 33600057-5, serial number (S/N) 26916D1 through
42300D1 inclusive; and APU fire extinguisher bottles P/N 30100050-1
or P/N 30100050-5, S/N 30209A1 through S/N 38950A1, inclusive;
unless color-coded stickers are installed in accordance with
paragraph (c) of this AD.
Actions Accomplished Per Previous Issues of the Service Bulletin
(e) Actions accomplished prior to the effective date of this AD
in accordance with EMBRAER Service Bulletin 145-26-0010, dated June
25, 2001; Change 01, dated January 3, 2002; or Change 02, dated June
5, 2002; are considered acceptable for compliance with the
corresponding actions specified in this AD.
Alternative Methods of Compliance
(f) In accordance with 14 CFR 39.19, the Manager, International
Branch, ANM-116, FAA, Transport Airplane Directorate, is authorized
to approve alternative methods of compliance for this AD.
Incorporation by Reference
(g) Unless otherwise specified in this AD, the actions shall be
done in accordance with EMBRAER Service Bulletin 145-26-0009, dated
January 26, 2001, or EMBRAER Service Bulletin 145-26-0009, Change
01, dated June 25, 2001; and EMBRAER Service Bulletin 145-26-0010,
Change 03, dated August 28, 2002; as applicable.
(1) The incorporation by reference of EMBRAER Service Bulletin
145-26-0009, Change 01, dated June 25, 2001; and EMBRAER Service
Bulletin 145-26-0010, Change 03, dated August 28, 2002; is approved
by the Director of the Federal Register in accordance with 5 U.S.C.
552(a) and 1 CFR part 51. EMBRAER Service Bulletin 145-26-0010,
Change 03, dated August 28, 2002, contains the following effective
pages:
------------------------------------------------------------------------
Change level shown
Page number on page Date shown on page
------------------------------------------------------------------------
1-3, 8.......................... 03................ August 28, 2002.
4-7, 9-24, 39-41................ Original.......... June 25, 2001.
25-38........................... 01................ January 3, 2002.
------------------------------------------------------------------------
(2) The incorporation by reference of EMBRAER Service Bulletin
145-26-0009, dated January 26, 2001, was approved previously by the
Director of the Federal Register as of June 8, 2001 (66 FR 28646,
May 24, 2001).
(3) Copies may be obtained from Empresa Brasileira de
Aeronautica S.A. (EMBRAER), P.O. Box 343--CEP 12.225, Sao Jose dos
Campos--SP, Brazil. Copies may be inspected at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or
at the National Archives and Records Administration (NARA). For
information on the availability of this material at NARA, call (202)
741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Note 2: The subject of this AD is addressed in Brazilian
airworthiness directive 2001-09-01R1, dated June 26, 2002.
Effective Date
(h) This amendment becomes effective on January 3, 2005.
Exact source excerpt. Text positions 9820–16384, end exclusive, in the original decoded publication. SHA-256: 25b8b537d224ed00e53d05b7262afa4b6737ee929f613d09c438ee894a78ba00
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2004-23-19 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: c92a8b3db48f8a0967e7932e81607a399a29e9eeb1f68dbbbca2626237551f8d. Source manifest: c242232259e69eff6d9f5a2722d86400056f8f71ca278259d796c61a30456afd.
Official source · 2004-11-26
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 69, Number 227 (Friday, November 26, 2004)]
[Rules and Regulations]
[Pages 68773-68775]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 04-25788]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 2002-NM-351-AD; Amendment 39-13874; AD 2004-23-19]
RIN 2120-AA64
Airworthiness Directives; Empresa Brasileira de Aeronautica S.A.
(EMBRAER) Model EMB-135 and -145 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment supersedes an existing airworthiness directive
(AD), applicable to certain EMBRAER Model EMB-135 and -45 series
airplanes. The existing AD currently requires a one-time inspection to
detect incorrect wiring of the electrical connectors to the pressure
switches and cartridges on the fire extinguisher bottles for the
engines and the auxiliary power unit (APU); disconnection and
reconnection of the wiring, as necessary; and adjustment of the length
of the harnesses on the fire extinguisher bottles to avoid future
misconnections. This amendment requires additional adjustment of the
length of the harnesses; installation of a color-coded identification
system to avoid misconnections during maintenance; and a functional
test of the engine fire extinguisher system. This amendment also
expands the applicability of the existing AD to include additional
airplanes. The actions specified by this AD are intended to prevent the
issuance of erroneous commands or the receipt of erroneous information
pertaining to the fire extinguisher system for the engines and the APU,
which could result in the inability to put out a fire in an engine or
in the APU. This action is intended to address the identified unsafe
condition.
DATES: Effective January 3, 2005.
The incorporation by reference of certain publications listed in
the regulations is approved by the Director of the Federal Register as
of January 3, 2005.
The incorporation by reference of EMBRAER Service Bulletin 145-26-
0009, dated January 26, 2001, as listed in the regulations, was
approved previously by the Director of the Federal Register as of June
8, 2001 (66 FR 28646, May 24, 2001).
ADDRESSES: The service information referenced in this AD may be
obtained from Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O.
Box 343--CEP 12.225, Sao Jose dos Campos--SP, Brazil. This information
may be examined at the Federal Aviation Administration (FAA), Transport
Airplane Directorate, Rules Docket, 1601 Lind Avenue, SW., Renton,
Washington; or at the National Archives and Records Administration
(NARA). For information on the availability of this material at NARA,
call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
FOR FURTHER INFORMATION CONTACT: Todd Thompson, Aerospace Engineer,
International Branch, ANM-116, FAA, Transport Airplane Directorate,
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425)
227-1175; fax (425) 227-1149.
SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal
Aviation Regulations (14 CFR part 39) by superseding AD 2001-10-15,
amendment 39-12241 (66 FR 28646, May 24, 2001), which is applicable to
certain EMBRAER Model EMB-135 and -145 series airplanes, was published
in the Federal Register on May 12, 2004 (69 FR 26326). The action
proposed to continue to require a one-time inspection to detect
incorrect wiring of the electrical connectors to the pressure switches
and cartridges on the fire extinguisher bottles for the engines and the
auxiliary power unit (APU); disconnection and reconnection of the
wiring, as necessary; and adjustment of the length of the harnesses on
the fire extinguisher bottles to avoid future misconnections. The
action also proposed to require additional adjustment of the length of
the harnesses; installation of a color-coded identification system to
avoid misconnections during maintenance; and a functional test of the
engine fire extinguisher system. The action also proposed to expand the
applicability of the existing AD to include additional airplanes.
Comments
Interested persons have been afforded an opportunity to participate
in the making of this amendment. Due consideration has been given to
the single comment received.
Request To Extend Compliance Time for Modification
One commenter, the airplane manufacturer, requests that we revise
paragraph (c) of the proposed AD to extend the compliance time from
4,000 to 5,000 flight hours for modifying the electrical harnesses and
electrical connectors of the engine and APU fire extinguisher system.
The commenter states that this would allow operators of affected
airplanes to do the modification during a regularly scheduled
maintenance visit. The commenter states that this extension would not
compromise flight safety because the proposed AD would also require a
general visual inspection to detect incorrect wiring of connectors. The
compliance time for this general visual inspection is 100 flight hours
after June 8, 2001 (the effective date of AD 2001-10-15) for airplanes
subject to AD 2001-10-15, and 100 flight hours after the effective date
of this AD for airplanes added to the applicability of this AD.
We do not concur. In consultation with the Departmento de Aviacao
Civil,
[[Page 68774]]
which is the airworthiness authority for Brazil, we have determined
that extending the compliance time for the modification is not
appropriate, and would not adequately ensure continued flight safety.
We have not revised this AD.
Explanation of Editorial Change to Final Rule
We have revised paragraph (d) of this AD to correct typographical
errors in two serial numbers.
Conclusion
After careful review of the available data, including the comment
noted above, we have determined that air safety and the public interest
require the adoption of the rule with the change described previously.
We have determined that this change will neither increase the economic
burden on any operator nor increase the scope of the AD.
Cost Impact
There are approximately 435 airplanes of U.S. registry that will be
affected by this AD.
The actions that are currently required by AD 2001-10-15 and
continue to be required by this AD take approximately 3 work hours per
airplane, at an average labor rate of $65 per work hour. Based on these
figures, the cost impact of the currently required actions on U.S.
operators is estimated to be $84,825, or $195 per airplane.
The new actions that are required by this AD will take
approximately 7 work hours per airplane, at an average labor rate of
$65 per work hour. Required parts will cost approximately $93 per
airplane. Based on these figures, the cost impact of the new
requirements of this AD on U.S. operators is estimated to be $238,380,
or $548 per airplane.
The cost impact figures discussed above are based on assumptions
that no operator has yet accomplished any of the requirements of this
AD action, and that no operator would accomplish those actions in the
future if this AD were not adopted. The cost impact figures discussed
in AD rulemaking actions represent only the time necessary to perform
the specific actions actually required by the AD. These figures
typically do not include incidental costs, such as the time required to
gain access and close up, planning time, or time necessitated by other
administrative actions.
Regulatory Impact
The regulations adopted herein will not have a substantial direct
effect on the States, on the relationship between the national
Government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, it
is determined that this final rule does not have federalism
implications under Executive Order 13132.
For the reasons discussed above, I certify that this action (1) is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the Rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends part 39 of
the Federal Aviation Regulations (14 CFR part 39) as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. Section 39.13 is amended by removing amendment 39-12241 (66 FR
28646, May 24, 2001), and by adding a new airworthiness directive (AD),
amendment 39-13874, to read as follows:
2004-23-19 Empresa Brasileira de Aeronautica S.A. (EMBRAER):
Amendment 39-13874. Docket 2002-NM-351-AD. Supersedes AD 2001-10-15,
Amendment 39-12241.
Applicability: Model EMB-135 and -145 series airplanes, as
listed in EMBRAER Service Bulletin 145-26-0010, Change 03, dated
August 28, 2002; certificated in any category.
Compliance: Required as indicated, unless accomplished
previously.
To prevent the issuance of erroneous commands or the receipt of
erroneous information pertaining to the fire extinguisher system for
the engines and auxiliary power unit (APU), which could result in
the inability to put out a fire in an engine or in the APU,
accomplish the following:
Restatement of the Requirements of AD 2001-10-15
Inspection
(a) For airplanes listed in EMBRAER Service Bulletin 145-26-
0009, dated January 26, 2001: Within 100 flight hours after June 8,
2001 (the effective date of AD 2001-10-15, amendment 39-12241),
perform a one-time general visual inspection to detect incorrect
wiring of electrical connectors to the pressure switches and
cartridges on the fire extinguisher bottles for the engines and the
APU, in accordance with paragraph 3.D. of the Accomplishment
Instructions of EMBRAER Service Bulletin 145-26-0009, dated January
26, 2001; or Change 01, dated June 25, 2001.
Note 1: For the purposes of this AD, a general visual inspection
is defined as: ``A visual examination of an interior or exterior
area, installation, or assembly to detect obvious damage, failure,
or irregularity. This level of inspection is made under normally
available lighting conditions such as daylight, hangar lighting,
flashlight, or droplight, and may require removal or opening of
access panels or doors. Stands, ladders, or platforms may be
required to gain proximity to the area being checked.''
(1) If the wiring connections are correct: Prior to further
flight, adjust the length of the harnesses to the fire extinguisher
bottles, in accordance with the service bulletin.
(2) If the wiring connections are incorrect: Prior to further
flight, re-connect them and adjust the length of the harnesses to
the fire extinguisher bottles, in accordance with the service
bulletin.
New Requirements of This AD
Inspection
(b) For airplanes not subject to paragraph (a) of this AD:
Within 100 flight hours after the effective date of this AD, perform
a one-time general visual inspection to detect incorrect wiring of
electrical connectors to the pressure switches and cartridges on the
fire extinguisher bottles for the engines and the APU, in accordance
with paragraph 3.D. of the Accomplishment Instructions of EMBRAER
Service Bulletin 145-26-0009, Change 01, dated June 25, 2001.
(1) If the wiring connections are correct: Prior to further
flight, adjust the length of the harnesses to the fire extinguisher
bottles, in accordance with the service bulletin.
(2) If the wiring connections are incorrect: Prior to further
flight, re-connect them and adjust the length of the harnesses to
the fire extinguisher bottles, in accordance with the service
bulletin.
Modifications
(c) For all airplanes: Within 4,000 flight hours after the
effective date of this AD, modify the electrical harnesses and
electrical connectors of the engine and APU fire extinguisher
system, including installing identification sleeves and color-coded
identification stickers, in accordance with the Accomplishment
Instructions of EMBRAER Service Bulletin 145-26-0010, Change 03,
dated August 28, 2002.
[[Page 68775]]
Parts Installation
(d) As of the effective date of this AD, no person may install
on any airplane, engine fire extinguisher bottle part number (P/N)
33600057-1 or P/N 33600057-5, serial number (S/N) 26916D1 through
42300D1 inclusive; and APU fire extinguisher bottles P/N 30100050-1
or P/N 30100050-5, S/N 30209A1 through S/N 38950A1, inclusive;
unless color-coded stickers are installed in accordance with
paragraph (c) of this AD.
Actions Accomplished Per Previous Issues of the Service Bulletin
(e) Actions accomplished prior to the effective date of this AD
in accordance with EMBRAER Service Bulletin 145-26-0010, dated June
25, 2001; Change 01, dated January 3, 2002; or Change 02, dated June
5, 2002; are considered acceptable for compliance with the
corresponding actions specified in this AD.
Alternative Methods of Compliance
(f) In accordance with 14 CFR 39.19, the Manager, International
Branch, ANM-116, FAA, Transport Airplane Directorate, is authorized
to approve alternative methods of compliance for this AD.
Incorporation by Reference
(g) Unless otherwise specified in this AD, the actions shall be
done in accordance with EMBRAER Service Bulletin 145-26-0009, dated
January 26, 2001, or EMBRAER Service Bulletin 145-26-0009, Change
01, dated June 25, 2001; and EMBRAER Service Bulletin 145-26-0010,
Change 03, dated August 28, 2002; as applicable.
(1) The incorporation by reference of EMBRAER Service Bulletin
145-26-0009, Change 01, dated June 25, 2001; and EMBRAER Service
Bulletin 145-26-0010, Change 03, dated August 28, 2002; is approved
by the Director of the Federal Register in accordance with 5 U.S.C.
552(a) and 1 CFR part 51. EMBRAER Service Bulletin 145-26-0010,
Change 03, dated August 28, 2002, contains the following effective
pages:
------------------------------------------------------------------------
Change level shown
Page number on page Date shown on page
------------------------------------------------------------------------
1-3, 8.......................... 03................ August 28, 2002.
4-7, 9-24, 39-41................ Original.......... June 25, 2001.
25-38........................... 01................ January 3, 2002.
------------------------------------------------------------------------
(2) The incorporation by reference of EMBRAER Service Bulletin
145-26-0009, dated January 26, 2001, was approved previously by the
Director of the Federal Register as of June 8, 2001 (66 FR 28646,
May 24, 2001).
(3) Copies may be obtained from Empresa Brasileira de
Aeronautica S.A. (EMBRAER), P.O. Box 343--CEP 12.225, Sao Jose dos
Campos--SP, Brazil. Copies may be inspected at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or
at the National Archives and Records Administration (NARA). For
information on the availability of this material at NARA, call (202)
741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Note 2: The subject of this AD is addressed in Brazilian
airworthiness directive 2001-09-01R1, dated June 26, 2002.
Effective Date
(h) This amendment becomes effective on January 3, 2005.
Issued in Renton, Washington, on November 10, 2004.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 04-25788 Filed 11-24-04; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T04:00:33.274463+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 2a3a662e7e43dd02b1228772d550adc45372961967d8a95b266a9b23e57fb254
- Text SHA-256
- c92a8b3db48f8a0967e7932e81607a399a29e9eeb1f68dbbbca2626237551f8d
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.