Back to publication catalog

Published 2005-09-16 · Federal Register document 05-18314

Airworthiness Directives; McDonnell Douglas Model DC-9-14, DC-9-15, and DC-9-15F Airplanes; and McDonnell Douglas Model DC-9-20, DC-9-30, DC-9-40, and DC-9-50 Series Airplanes

Publication summary

The FAA is adopting a new airworthiness directive (AD) for all transport category airplanes listed above. This AD requires repetitive inspections for cracks of the main landing gear (MLG) shock strut cylinder, and related investigative and corrective actions if necessary. This AD results from two reports of a collapsed MLG and a report of cracks in two MLG cylinders. We are issuing this AD to detect and correct fatigue cracks in the shock strut cylinder of the MLG, which could result in a collapsed MLG during takeoff or landing, and possible reduced structural integrity of the airplane.

Why this record is shown

Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:17.300228+00:00. The title, summary and date are source facts.

Source revision
federal_register_ad_metadata_2005-5d43d153038ee1c1
Source row
results[387]
Raw source SHA-256
5d43d153038ee1c1c214f5c3688e38e25e37b832227fe65d52f7420a65ee20f2

Final-rule publication

Recorded publication clauses

AD identifier printed in this edition
2005-19-08
Effective date printed in this edition
2005-10-21
Read 14 complete recorded clauses
Effective Date
Effective Date

    (a) This AD becomes effective October 21, 2005.

Exact source excerpt. Text positions 10441–10510, end exclusive, in the original decoded publication. SHA-256: 5f7bd720cb2925ce8cd3ebbe9f36e2fb5f4fb3fa03738776a186d3c874b493ae

Affected ADs
Affected ADs

    (b) None.

Exact source excerpt. Text positions 10510–10539, end exclusive, in the original decoded publication. SHA-256: 027fbc44617399472b6ac4741da3aee18448654374228bcf4fe3f01df6b1539b

Applicability wording · Applicability
Applicability

    (c) This AD applies to all McDonnell Douglas Model DC-9-14, DC-
9-15, and DC-9-15F airplanes; Model DC-9-21 airplanes; Model DC-9-
31, DC-9-32, DC-9-32 (VC-9C), DC-9-32F, DC-9-33F, DC-9-34, DC-9-34F, 
and DC-9-32F (C-9A, C-9B) airplanes; Model DC-9-41 airplanes; and 
Model DC-9-51 airplanes; certificated in any category.

Exact source excerpt. Text positions 10539–10882, end exclusive, in the original decoded publication. SHA-256: d56dfa2fc11b02016c88018572810a1e4be1544d7020d0f0fe6c35c22ef87d6b

Unsafe Condition
Unsafe Condition

    (d) This AD results from two reports of a collapsed main landing 
gear (MLG) and a report of cracks in two MLG cylinders. We are 
issuing this AD to detect and correct fatigue cracks in the shock 
strut cylinder of the MLG, which could result in a collapsed MLG 
during takeoff or landing, and possible reduced structural integrity 
of the airplane.

Exact source excerpt. Text positions 10882–11255, end exclusive, in the original decoded publication. SHA-256: b89da8fd7234e50b15357f41e82311e5f193286bc0599cafa355f70a99051abe

Compliance
Compliance

    (e) You are responsible for having the actions required by this 
AD performed within the compliance times specified, unless the 
actions have already been done.

Exact source excerpt. Text positions 11255–11433, end exclusive, in the original decoded publication. SHA-256: 64a7a1579f37f56eafecd0aeb3c528e7c89f6292ed0cb53091423917642d5847

Service Bulletin Reference Paragraph
Service Bulletin Reference Paragraph

    (f) The term ``service bulletin,'' as used in this AD, means the 
Accomplishment Instructions of Boeing Alert Service Bulletin DC9-
32A350, Revision 1, dated August 3, 2005.

Exact source excerpt. Text positions 11433–11650, end exclusive, in the original decoded publication. SHA-256: d559b20bb5eedadd803a150019f5396d3ddc758df5df6b49b8bc4f66361bbed0

Records Review
Records Review

    (g) Before the applicable compliance time specified in paragraph 
(h) or Table 1 of this AD, as applicable, do the applicable actions 
in paragraphs (g)(1) and (g)(2) of this AD.
    (1) For all airplane groups: Review the airplane maintenance 
records of the MLG to

[[Page 54618]]

determine its service history and the number of landings on the MLG 
shock strut cylinder.
    (2) For Group 3 airplanes identified in the service bulletin: 
Review the maintenance records to determine if the MLG cylinder on 
each Group 3 airplane has always been on a Group 3 airplane, and do 
the actions in paragraph (k) of this AD.

Exact source excerpt. Text positions 11650–12291, end exclusive, in the original decoded publication. SHA-256: 5b421729e86e1df7cd685aa028763af4321af8b1a3d061fc36b84a2f73c848f2

Inspection
Inspection

    (h) Inspect the MLG shock strut cylinders for cracks using the 
Option 1 or Option 2 non-destructive testing inspection described in 
the service bulletin. Inspect in accordance with the Accomplishment 
Instructions of the service bulletin. Do the detailed inspection 
before the accumulation of 60,000 total landings on the MLG, or at 
the applicable grace period specified in Table 1 of this AD, 
whichever occurs later, except as provided by paragraph (k) of this 
AD. If the review of maintenance records is not sufficient to 
conclusively determine the service history and number of landings on 
the MLG shock strut cylinder, perform the initial inspection at the 
applicable grace period specified in Table 1 of this AD.

             Table 1.--Grace Period and Repetitive Interval
------------------------------------------------------------------------
   Airplanes identified in the                            Repetitive
    service bulletin as group        Grace period          interval
------------------------------------------------------------------------
1...............................  Within 18 months    Intervals not to
                                   or 650 landings     exceed 650
                                   after the           landings.
                                   effective date of
                                   this AD,
                                   whichever occurs
                                   first.
2...............................  Within 18 months    Intervals not to
                                   or 500 landings     exceed 500
                                   after the           landings.
                                   effective date of
                                   this AD,
                                   whichever occurs
                                   first.
3, except as provided by          Within 18 months    Intervals not to
 paragraph (k) of this AD.         or 2,500 landings   exceed 2,500
                                   after the           landings.
                                   effective date of
                                   this AD,
                                   whichever occurs
                                   first.
4...............................  Within 18 months    Intervals not
                                   or 2,100 landings   exceed 2,100
                                   after the           landings.
                                   effective date of
                                   this AD,
                                   whichever occurs
                                   first.
------------------------------------------------------------------------

Exact source excerpt. Text positions 12291–15025, end exclusive, in the original decoded publication. SHA-256: 4f5ef12d3c6d20da2b20dc622fcea9458cb5c159ba05fe4d94f13ab146158c97

No Crack Indication Found
No Crack Indication Found

    (i) If no crack indication is found during the inspection 
required by paragraph (h) of this AD, repeat the inspection at the 
applicable interval specified in Table 1 of this AD.

Exact source excerpt. Text positions 15025–15237, end exclusive, in the original decoded publication. SHA-256: f07cbd5e0644b2ebbc774e88d8aa474211b3a57258125ac061039a1991126a5e

Related Investigative and Corrective Actions
Related Investigative and Corrective Actions

    (j) If any crack indication is found during any inspection 
required by paragraph (h) or (i) of this AD, before further flight: 
Confirm the crack indication by doing all applicable related 
investigative actions and doing the applicable corrective actions in 
accordance with the service bulletin. Repeat the inspection at the 
applicable threshold and interval specified in paragraph (h) of this 
AD.

Exact source excerpt. Text positions 15237–15691, end exclusive, in the original decoded publication. SHA-256: 43aea151ddbb8b83892291f7676253ab5ac704601c1d9e14950374c8d3e2710c

MLG Cylinder Previously Installed on Group 4 Airplanes
MLG Cylinder Previously Installed on Group 4 Airplanes

    (k) For MLG cylinders on Group 3 airplanes as identified in the 
service bulletin: If the MLG cylinder was previously installed on a 
Group 4 airplane, as identified in the service bulletin, or if the 
service history and number of landings cannot be determined, the MLG 
cylinder must be inspected at the grace period and repetitive 
interval that applies to Group 4 airplanes, as specified in Table 1 
of this AD.

Exact source excerpt. Text positions 15691–16168, end exclusive, in the original decoded publication. SHA-256: 0cbba48b496b6796636f31791dcf5b080637fcd3a6c492666e2021b77a4ea94c

Actions Accomplished in Accordance With Original Issue of Service Bulletin
Actions Accomplished in Accordance With Original Issue of Service 
Bulletin

    (l) Actions done before the effective date of this AD in 
accordance with Boeing Alert Service Bulletin DC9-32A350, dated 
December 3, 2004, are acceptable for compliance with the 
corresponding actions required by this AD.

Exact source excerpt. Text positions 16168–16474, end exclusive, in the original decoded publication. SHA-256: 499a65e4d5d6fad9a0b499ba22678ebc16dccc8eb9d80660f84ca016bc26bd9a

Alternative Methods of Compliance (AMOCs)
Alternative Methods of Compliance (AMOCs)

    (m) The Manager, Los Angeles Aircraft Certification Office, FAA, 
has the authority to approve AMOCs for this AD, if requested in 
accordance with the procedures found in 14 CFR 39.19.

Exact source excerpt. Text positions 16474–16707, end exclusive, in the original decoded publication. SHA-256: deddf2ff98e41da5bd8d0b81edb6b0933466521a0caaf0d8829d9b326bdeefe9

Material Incorporated by Reference
Material Incorporated by Reference

    (n) You must use Boeing Alert Service Bulletin DC9-32A350, 
Revision 1, dated August 3, 2005, to perform the actions that are 
required by this AD, unless the AD specifies otherwise. The Director 
of the Federal Register approved the incorporation by reference of 
this document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. 
Contact Boeing Commercial Airplanes, Long Beach Division, 3855 
Lakewood Boulevard, Long Beach, California 90846, Attention: Data 
and Service Management, Dept. C1-L5A (D800-0024), for a copy of this 
service information. You may review copies at the Docket Management 
Facility, U.S. Department of Transportation, 400 Seventh Street SW., 
room PL-401, Nassif Building, Washington, DC; on the Internet at 
http://dms.dot.gov; or at the National Archives and Records 
Administration (NARA). For information on the availability of this 
material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal-register/cfr/ibr-locations.html.

Exact source excerpt. Text positions 16707–17733, end exclusive, in the original decoded publication. SHA-256: 061e7bf78e5b3b9facc3006aac1f499e349e2f3dd3f00541496ddeae6ea5867f

No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.

Find all recorded historical references to AD 2005-19-08 · 0 printed reference observations in this pinned collection.

These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.

Why these observations are shown

They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.

Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: a341dda83a86e145a0e28e52c7542656c257633880911b620235606eb1df4066. Source manifest: 4c42e362787e4b6e2d82f6f30c1da17e245f0ec15db89d74622930d436a0d961.

Official source · 2005-09-16

Publication text

This is the complete recorded text of this dated publication.

Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.

Read the complete official publication text
[Federal Register Volume 70, Number 179 (Friday, September 16, 2005)]
[Rules and Regulations]
[Pages 54616-54618]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 05-18314]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2005-21140; Directorate Identifier 2004-NM-274-AD; 
Amendment 39-14273; AD 2005-19-08]
RIN 2120-AA64


Airworthiness Directives; McDonnell Douglas Model DC-9-14, DC-9-
15, and DC-9-15F Airplanes; and McDonnell Douglas Model DC-9-20, DC-9-
30, DC-9-40, and DC-9-50 Series Airplanes

AGENCY: Federal Aviation Administration (FAA), Department of 
Transportation (DOT).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The FAA is adopting a new airworthiness directive (AD) for all 
transport category airplanes listed above. This AD requires repetitive 
inspections for cracks of the main landing gear (MLG) shock strut 
cylinder, and related investigative and corrective actions if 
necessary. This AD results from two reports of a collapsed MLG and a 
report of cracks in two MLG cylinders. We are issuing this AD to detect 
and correct fatigue cracks in the shock strut cylinder of the MLG, 
which could result in a collapsed MLG during takeoff or landing, and 
possible reduced structural integrity of the airplane.

DATES: This AD becomes effective October 21, 2005.
    The Director of the Federal Register approved the incorporation by 
reference of a certain publication listed in the AD as of October 21, 
2005.

ADDRESSES: You may examine the AD docket on the Internet at http://dms.dot.gov or in person at the Docket Management Facility, U.S. 
Department of Transportation, 400 Seventh Street SW., Nassif Building, 
room PL-401, Washington, DC.
    Contact Boeing Commercial Airplanes, Long Beach Division, 3855 
Lakewood Boulevard, Long Beach, California 90846, Attention: Data and 
Service Management, Dept. C1-L5A (D800-0024), for service information 
identified in this AD.

FOR FURTHER INFORMATION CONTACT: Wahib Mina, Aerospace Engineer, 
Airframe Branch, ANM-120L, FAA, Los Angeles Aircraft Certification 
Office, 3960 Paramount Boulevard, Lakewood, California 90712-4137; 
telephone (562) 627-5324; fax (562) 627-5210.

SUPPLEMENTARY INFORMATION:

Examining the Docket

    You may examine the airworthiness directive (AD) docket on the 
Internet at http://dms.dot.gov or in person at the Docket Management 
Facility office between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays. The Docket Management Facility office 
(telephone (800) 647-5227) is located on the plaza level of the Nassif 
Building at the street address stated in the ADDRESSES section.

Discussion

    The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 
CFR part 39 to include an AD that would apply to all McDonnell Douglas 
Model DC-9-14, DC-9-15, and DC-9-15F airplanes; Model DC-9-21 
airplanes; Model DC-9-31, DC-9-32, DC-9-32 (VC-9C), DC-9-32F, DC-9-33F, 
DC-9-34, DC-9-34F, and DC-9-32F (C-9A, C-9B) airplanes; Model DC-9-41 
airplanes; and Model DC-9-51 airplanes. That NPRM was published in the 
Federal Register on May 9, 2005 (70 FR 24338). That NPRM proposed to 
require repetitive inspections for cracks of the main landing gear 
(MLG) shock strut cylinder, and related investigative and corrective 
actions if necessary.

Comments

    We provided the public the opportunity to participate in the 
development of this AD. We have considered the comments received.

Request to Refer to Latest Service Bulletin Revision

    The commenter, an airplane operator, states that the manufacturer 
is planning to revise Boeing Alert Service Bulletin DC9-32A350, dated 
December 3, 2004, which was cited as the appropriate source of service 
information for the action in the NPRM. The commenter asks that we 
revise paragraph (f) to refer to the new revision of the service 
bulletin, and that we also give credit for the actions done in 
accordance with the original issue of the service bulletin. In 
addition, the commenter requests that we address certain references in 
the service bulletin that are incorrect.
    We agree with the commenter. We have revised paragraph (f) of the 
final rule to refer to Boeing Alert Service Bulletin DC9-32A350, 
Revision 1, dated August 3, 2005, as the appropriate source of service 
information. We have also added a new paragraph (l) to give credit for 
the actions done in accordance with the original issue of the service 
bulletin, and re-identified the subsequent paragraph accordingly. 
Revision 1 of the service bulletin does not increase the scope of the 
AD;

[[Page 54617]]

however it corrects certain references, including incorrect references 
to certain procedures for paint removal from the inspection area.

Request to Add Optional Terminating Action

    The same commenter states that the manufacturer has designed a new-
material shock strut cylinder that is not air-melted. The commenter 
states that installing this new part should be considered as an 
optional terminating action for the inspections in the NPRM. The 
commenter points out that cylinders that are not air-melted are not 
subject to the unsafe condition addressed in the NPRM.
    We disagree with the commenter. The manufacturer has advised us it 
has designed a new-material shock strut cylinder that is not air-
melted, although this part is not yet available. However, operators may 
request alternative methods of compliance with the requirements of this 
rule; paragraph (n) of the final rule includes a provision for the 
approval of such methods. We have not changed the final rule in this 
regard.

Conclusion

    We have carefully reviewed the available data, including the 
comments received, and determined that air safety and the public 
interest require adopting the AD with the changes described previously. 
We have determined that these changes will neither increase the 
economic burden on any operator nor increase the scope of the AD.

Costs of Compliance

    There are about 644 airplanes of the affected design in the 
worldwide fleet. The following table provides the estimated costs for 
U.S. operators to comply with this AD.

                                                                     Estimated Costs
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                        Number of
                                                          Average                                                         U.S.-
             Action                    Work  hours       labor rate            Parts            Cost per  airplane     registered         Fleet cost
                                                          per hour                                                      airplanes
--------------------------------------------------------------------------------------------------------------------------------------------------------
Inspection, per inspection cycle  4 to 6..............          $65  None....................  $260 to $390........             426  $110,760 to
                                                                                                                                      $166,140, per
                                                                                                                                      inspection cycle.
--------------------------------------------------------------------------------------------------------------------------------------------------------

Authority for this Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. Subtitle VII, Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    We are issuing this rulemaking under the authority described in 
subtitle VII, part A, subpart III, section 44701, ``General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    We have determined that this AD will not have federalism 
implications under Executive Order 13132. This AD will not have a 
substantial direct effect on the States, on the relationship between 
the national government and the States, or on the distribution of power 
and responsibilities among the various levels of government.
    For the reasons discussed above, I certify that this AD:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866;
    (2) Is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and
    (3) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.
    We prepared a regulatory evaluation of the estimated costs to 
comply with this AD and placed it in the AD docket. See the ADDRESSES 
section for a location to examine the regulatory evaluation.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

0
Accordingly, under the authority delegated to me by the Administrator, 
the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The Federal Aviation Administration (FAA) amends Sec.  39.13 by 
adding the following new airworthiness directive (AD):

2005-19-08 McDonnell Douglas: Amendment 39-14273. Docket No. FAA-
2005-21140; Directorate Identifier 2004-NM-274-AD.

Effective Date

    (a) This AD becomes effective October 21, 2005.

Affected ADs

    (b) None.

Applicability

    (c) This AD applies to all McDonnell Douglas Model DC-9-14, DC-
9-15, and DC-9-15F airplanes; Model DC-9-21 airplanes; Model DC-9-
31, DC-9-32, DC-9-32 (VC-9C), DC-9-32F, DC-9-33F, DC-9-34, DC-9-34F, 
and DC-9-32F (C-9A, C-9B) airplanes; Model DC-9-41 airplanes; and 
Model DC-9-51 airplanes; certificated in any category.

Unsafe Condition

    (d) This AD results from two reports of a collapsed main landing 
gear (MLG) and a report of cracks in two MLG cylinders. We are 
issuing this AD to detect and correct fatigue cracks in the shock 
strut cylinder of the MLG, which could result in a collapsed MLG 
during takeoff or landing, and possible reduced structural integrity 
of the airplane.

Compliance

    (e) You are responsible for having the actions required by this 
AD performed within the compliance times specified, unless the 
actions have already been done.

Service Bulletin Reference Paragraph

    (f) The term ``service bulletin,'' as used in this AD, means the 
Accomplishment Instructions of Boeing Alert Service Bulletin DC9-
32A350, Revision 1, dated August 3, 2005.

Records Review

    (g) Before the applicable compliance time specified in paragraph 
(h) or Table 1 of this AD, as applicable, do the applicable actions 
in paragraphs (g)(1) and (g)(2) of this AD.
    (1) For all airplane groups: Review the airplane maintenance 
records of the MLG to

[[Page 54618]]

determine its service history and the number of landings on the MLG 
shock strut cylinder.
    (2) For Group 3 airplanes identified in the service bulletin: 
Review the maintenance records to determine if the MLG cylinder on 
each Group 3 airplane has always been on a Group 3 airplane, and do 
the actions in paragraph (k) of this AD.

Inspection

    (h) Inspect the MLG shock strut cylinders for cracks using the 
Option 1 or Option 2 non-destructive testing inspection described in 
the service bulletin. Inspect in accordance with the Accomplishment 
Instructions of the service bulletin. Do the detailed inspection 
before the accumulation of 60,000 total landings on the MLG, or at 
the applicable grace period specified in Table 1 of this AD, 
whichever occurs later, except as provided by paragraph (k) of this 
AD. If the review of maintenance records is not sufficient to 
conclusively determine the service history and number of landings on 
the MLG shock strut cylinder, perform the initial inspection at the 
applicable grace period specified in Table 1 of this AD.

             Table 1.--Grace Period and Repetitive Interval
------------------------------------------------------------------------
   Airplanes identified in the                            Repetitive
    service bulletin as group        Grace period          interval
------------------------------------------------------------------------
1...............................  Within 18 months    Intervals not to
                                   or 650 landings     exceed 650
                                   after the           landings.
                                   effective date of
                                   this AD,
                                   whichever occurs
                                   first.
2...............................  Within 18 months    Intervals not to
                                   or 500 landings     exceed 500
                                   after the           landings.
                                   effective date of
                                   this AD,
                                   whichever occurs
                                   first.
3, except as provided by          Within 18 months    Intervals not to
 paragraph (k) of this AD.         or 2,500 landings   exceed 2,500
                                   after the           landings.
                                   effective date of
                                   this AD,
                                   whichever occurs
                                   first.
4...............................  Within 18 months    Intervals not
                                   or 2,100 landings   exceed 2,100
                                   after the           landings.
                                   effective date of
                                   this AD,
                                   whichever occurs
                                   first.
------------------------------------------------------------------------

No Crack Indication Found

    (i) If no crack indication is found during the inspection 
required by paragraph (h) of this AD, repeat the inspection at the 
applicable interval specified in Table 1 of this AD.

Related Investigative and Corrective Actions

    (j) If any crack indication is found during any inspection 
required by paragraph (h) or (i) of this AD, before further flight: 
Confirm the crack indication by doing all applicable related 
investigative actions and doing the applicable corrective actions in 
accordance with the service bulletin. Repeat the inspection at the 
applicable threshold and interval specified in paragraph (h) of this 
AD.

MLG Cylinder Previously Installed on Group 4 Airplanes

    (k) For MLG cylinders on Group 3 airplanes as identified in the 
service bulletin: If the MLG cylinder was previously installed on a 
Group 4 airplane, as identified in the service bulletin, or if the 
service history and number of landings cannot be determined, the MLG 
cylinder must be inspected at the grace period and repetitive 
interval that applies to Group 4 airplanes, as specified in Table 1 
of this AD.

Actions Accomplished in Accordance With Original Issue of Service 
Bulletin

    (l) Actions done before the effective date of this AD in 
accordance with Boeing Alert Service Bulletin DC9-32A350, dated 
December 3, 2004, are acceptable for compliance with the 
corresponding actions required by this AD.

Alternative Methods of Compliance (AMOCs)

    (m) The Manager, Los Angeles Aircraft Certification Office, FAA, 
has the authority to approve AMOCs for this AD, if requested in 
accordance with the procedures found in 14 CFR 39.19.

Material Incorporated by Reference

    (n) You must use Boeing Alert Service Bulletin DC9-32A350, 
Revision 1, dated August 3, 2005, to perform the actions that are 
required by this AD, unless the AD specifies otherwise. The Director 
of the Federal Register approved the incorporation by reference of 
this document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. 
Contact Boeing Commercial Airplanes, Long Beach Division, 3855 
Lakewood Boulevard, Long Beach, California 90846, Attention: Data 
and Service Management, Dept. C1-L5A (D800-0024), for a copy of this 
service information. You may review copies at the Docket Management 
Facility, U.S. Department of Transportation, 400 Seventh Street SW., 
room PL-401, Nassif Building, Washington, DC; on the Internet at 
http://dms.dot.gov; or at the National Archives and Records 
Administration (NARA). For information on the availability of this 
material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal-register/cfr/ibr-locations.html.

    Issued in Renton, Washington, on September 7, 2005.
Kalene C. Yanamura,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 05-18314 Filed 9-15-05; 8:45 am]
BILLING CODE 4910-13-P


Why this text is shown

The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:52:12.075327+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.

Open the captured official edition

Source SHA-256
52cf704c6b44470318c9df3bde67bcffd278e3d6041c0a003dec440129e0b988
Text SHA-256
a341dda83a86e145a0e28e52c7542656c257633880911b620235606eb1df4066

Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence

Coverage and limits

These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.

The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.