Published 2005-04-19 · Federal Register document 05-7683
Airworthiness Directives; Boeing Model 747-200B, -200C, -200F, and -400F Series Airplanes
Publication summary
The FAA is adopting a new airworthiness directive (AD) for certain Boeing Model 747 series airplanes. This AD requires repetitive detailed inspections for cracks in the crease beam and adjacent structure of the fuselage, and related investigative and corrective actions if necessary. This AD is prompted by fatigue cracks found in the crease beam during a follow-on inspection of a previously installed modification. We are issuing this AD to find and fix fatigue cracking of the fuselage frame, which could result in reduced structural integrity of the frame and consequent rapid decompression of the airplane.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:17.300228+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2005-5d43d153038ee1c1
- Source row
- results[159]
- Raw source SHA-256
- 5d43d153038ee1c1c214f5c3688e38e25e37b832227fe65d52f7420a65ee20f2
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2005-08-09
- Effective date printed in this edition
- 2005-05-24
Read 9 complete recorded clauses
Effective Date
Effective Date
(a) This AD becomes effective May 24, 2005.
Exact source excerpt. Text positions 6326–6391, end exclusive, in the original decoded publication. SHA-256: 12be1d0fb63f6e11b944ce0bbf5ab5df607937a839f15f7c6606f50da539da75
Affected ADs
Affected ADs
(b) None.
Exact source excerpt. Text positions 6391–6420, end exclusive, in the original decoded publication. SHA-256: 027fbc44617399472b6ac4741da3aee18448654374228bcf4fe3f01df6b1539b
Applicability wording · Applicability
Applicability
(c) This AD applies to Boeing Model 747-200B, -200C, -200F, and
-400F series airplanes, line numbers 604 and subsequent,
certificated in any category; as listed in Boeing Alert Service
Bulletin 747-53A2504, dated August 19, 2004.
Exact source excerpt. Text positions 6420–6673, end exclusive, in the original decoded publication. SHA-256: dd8a9a42fa03529b626a945e5d4bc97c7d4b33b7cf342be7f073660ab63377f4
Unsafe Condition
Unsafe Condition
(d) This AD was prompted by fatigue cracks found in the crease
beam during a follow-on inspection of a previously installed
modification. We are issuing this AD to find and fix fatigue
cracking of the fuselage frame, which could result in reduced
structural integrity of the frame and consequent rapid decompression
of the airplane.
Exact source excerpt. Text positions 6673–7034, end exclusive, in the original decoded publication. SHA-256: 4273512693f14b031d860c398c36cb40989789c1623869d25c2f859191777439
Compliance
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Exact source excerpt. Text positions 7034–7212, end exclusive, in the original decoded publication. SHA-256: 64a7a1579f37f56eafecd0aeb3c528e7c89f6292ed0cb53091423917642d5847
Repetitive Inspections
Repetitive Inspections
(f) Accomplish a detailed inspection for cracks in the crease
beam and adjacent structure of the fuselage by doing all the
applicable actions in accordance with the Accomplishment
Instructions of Boeing Alert Service Bulletin 747-53A2504, dated
August 19, 2004; at the applicable time specified in paragraph
(f)(1) or (f)(2) of this AD. Repeat the inspection thereafter at
intervals not to exceed 6,000 flight cycles.
(1) For Groups 1 and 2 airplanes as identified in the service
bulletin: Before the accumulation of 10,000 total flight cycles, or
within 1,500 flight cycles after the effective date of this AD,
whichever is later.
(2) For Groups 3 and 4 airplanes as identified in the service
bulletin: Before the accumulation of 14,000 total flight cycles, or
within 1,500 flight cycles after the effective date of this AD,
whichever is later.
Exact source excerpt. Text positions 7212–8107, end exclusive, in the original decoded publication. SHA-256: 1d9dce8f5c8f3a4aaf49369ef919a428a3840f3c8181a222cbe727c00acaa782
Related Investigative and Corrective Actions
Related Investigative and Corrective Actions
(g) If any crack is found during any inspection required by
paragraph (f) of this AD: Before further flight, repair the cracking
in accordance with the Accomplishment Instructions of Boeing Alert
Service Bulletin 747-53A2504, dated August 19, 2004. If cracking of
the crease beam or outer tee chord attachment is found: Before
further flight, do a high frequency eddy current inspection for
additional cracking, and repair any cracking found, in accordance
with the service bulletin. Where the service bulletin specifies
contacting the manufacturer for disposition of certain repair
conditions, repair before further flight in accordance with a method
approved by the Manager, Seattle Aircraft Certification Office
(ACO), FAA; or by an Authorized Representative for the Boeing
Delegation Option Authorization (DOA) Organization, who has been
authorized by the Manager, Seattle ACO, to make those findings. For
a repair method to be approved, the repair must meet the
certification basis of the airplane, and the approval must
specifically refer to this AD.
Exact source excerpt. Text positions 8107–9231, end exclusive, in the original decoded publication. SHA-256: b5cfdb0672b94f1ab1b9527e35daced959484a5aa11bfe610776cf73edefc983
No Reporting Required
No Reporting Required
(h) For certain airplanes, the service bulletin referenced in
this AD recommends reporting any discrepancies to the manufacturer,
but this AD does not include that requirement.
Alternative Methods of Compliance (AMOCs)
(i)(1) The Manager, Seattle ACO, has the authority to approve
AMOCs for this AD, if requested in accordance with the procedures
found in 14 CFR 39.19.
(2) An AMOC that provides an acceptable level of safety may be
used for a repair required by this AD, if it is approved by an
Authorized Representative for the Boeing DOA Organization who has
been authorized by the Manager, Seattle ACO, to make such findings.
[[Page 20275]]
Exact source excerpt. Text positions 9231–9922, end exclusive, in the original decoded publication. SHA-256: 5f7ec70ee9c52b8710ed2587d96b04bdeb00955e669839c7f14e6c30f8932ac9
Material Incorporated by Reference
Material Incorporated by Reference
(j) You must use Boeing Alert Service Bulletin 747-53A2504,
dated August 19, 2004, to perform the actions that are required by
this AD, unless the AD specifies otherwise. The Director of the
Federal Register approves the incorporation by reference of this
document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. To
get copies of the service information, go to Boeing Commercial
Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207. To view
the AD docket, go to the Docket Management Facility, U.S. Department
of Transportation, 400 Seventh Street SW., room PL-401, Nassif
Building, Washington, DC. To review copies of the service
information, go to the National Archives and Records Administration
(NARA). For information on the availability of this material at the
NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Exact source excerpt. Text positions 9922–10876, end exclusive, in the original decoded publication. SHA-256: 9335579d468cf51152c42dad6735e4b2315414aa63869507e2d8c8cdf4312927
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2005-08-09 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 783e5aea6d4d27e29169a6e5081aaf926adfc979b155e9256d204aa48d351512. Source manifest: b04a84b8510a2a0fc49938a3681c8941821919351b11fb1d1a98c99d40733212.
Official source · 2005-04-19
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 70, Number 74 (Tuesday, April 19, 2005)]
[Rules and Regulations]
[Pages 20273-20275]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 05-7683]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2005-20136; Directorate Identifier 2004-NM-185-AD;
Amendment 39-14061; AD 2005-08-09]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 747-200B, -200C, -200F,
and -400F Series Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for
certain Boeing Model 747 series airplanes. This AD requires repetitive
detailed inspections for cracks in the crease beam and adjacent
structure of the fuselage, and related investigative and corrective
actions if necessary. This AD is prompted by fatigue cracks found in
the crease beam during a follow-on inspection of a previously installed
modification. We are issuing this AD to find and fix fatigue cracking
of the fuselage frame, which could result in reduced structural
integrity of the frame and consequent rapid decompression of the
airplane.
DATES: This AD becomes effective May 24, 2005.
The incorporation by reference of a certain publication listed in
the AD is approved by the Director of the Federal Register as of May
24, 2005.
ADDRESSES: The service information referenced in this AD may be
obtained from Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207.
Docket: The AD docket contains the proposed AD, comments, and any
final disposition. You can examine the AD docket on the Internet at
http://dms.dot.gov, or in person at the Docket Management Facility
office between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The Docket Management Facility office (telephone (800) 647-
5227) is located on the plaza level of the Nassif Building at the U.S.
Department of Transportation, 400 Seventh Street SW., room PL-401,
Washington, DC. This docket number is FAA-2005-20136; the directorate
identifier for this docket is 2005-NM-185-AD.
FOR FURTHER INFORMATION CONTACT: Nick Kusz, Aerospace Engineer,
Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office,
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425)
917-6432; fax (425) 917-6590.
SUPPLEMENTARY INFORMATION: The FAA proposed to amend 14 CFR Part 39
with an AD for certain Boeing Model 747 series airplanes. That action,
published in the Federal Register on January 28,
[[Page 20274]]
2005 (70 FR 4048), proposed to require repetitive detailed inspections
for cracks in the crease beam and adjacent structure of the fuselage,
and related investigative and corrective actions if necessary.
Comments
We provided the public the opportunity to participate in the
development of this AD. We have considered the single comment that has
been submitted on the proposed AD. The commenter supports the proposed
AD.
Conclusion
We have carefully reviewed the available data, including the
comment that has been submitted, and determined that air safety and the
public interest require adopting the AD as proposed.
Costs of Compliance
There are about 163 airplanes of the affected design in the
worldwide fleet. This AD will affect about 30 airplanes of U.S.
registry. The inspection will take about 8 work hours per airplane, at
an average labor rate of $65 per work hour. Based on these figures, the
estimated cost of the inspection for U.S. operators is $15,600, or $520
per airplane, per inspection cycle.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, Section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866;
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to
comply with this AD. See the ADDRESSES section for a location to
examine the regulatory evaluation.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2005-08-09 Boeing: Amendment 39-14061. Docket No. FAA-2005-20136;
Directorate Identifier 2004-NM-185-AD.
Effective Date
(a) This AD becomes effective May 24, 2005.
Affected ADs
(b) None.
Applicability
(c) This AD applies to Boeing Model 747-200B, -200C, -200F, and
-400F series airplanes, line numbers 604 and subsequent,
certificated in any category; as listed in Boeing Alert Service
Bulletin 747-53A2504, dated August 19, 2004.
Unsafe Condition
(d) This AD was prompted by fatigue cracks found in the crease
beam during a follow-on inspection of a previously installed
modification. We are issuing this AD to find and fix fatigue
cracking of the fuselage frame, which could result in reduced
structural integrity of the frame and consequent rapid decompression
of the airplane.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Repetitive Inspections
(f) Accomplish a detailed inspection for cracks in the crease
beam and adjacent structure of the fuselage by doing all the
applicable actions in accordance with the Accomplishment
Instructions of Boeing Alert Service Bulletin 747-53A2504, dated
August 19, 2004; at the applicable time specified in paragraph
(f)(1) or (f)(2) of this AD. Repeat the inspection thereafter at
intervals not to exceed 6,000 flight cycles.
(1) For Groups 1 and 2 airplanes as identified in the service
bulletin: Before the accumulation of 10,000 total flight cycles, or
within 1,500 flight cycles after the effective date of this AD,
whichever is later.
(2) For Groups 3 and 4 airplanes as identified in the service
bulletin: Before the accumulation of 14,000 total flight cycles, or
within 1,500 flight cycles after the effective date of this AD,
whichever is later.
Related Investigative and Corrective Actions
(g) If any crack is found during any inspection required by
paragraph (f) of this AD: Before further flight, repair the cracking
in accordance with the Accomplishment Instructions of Boeing Alert
Service Bulletin 747-53A2504, dated August 19, 2004. If cracking of
the crease beam or outer tee chord attachment is found: Before
further flight, do a high frequency eddy current inspection for
additional cracking, and repair any cracking found, in accordance
with the service bulletin. Where the service bulletin specifies
contacting the manufacturer for disposition of certain repair
conditions, repair before further flight in accordance with a method
approved by the Manager, Seattle Aircraft Certification Office
(ACO), FAA; or by an Authorized Representative for the Boeing
Delegation Option Authorization (DOA) Organization, who has been
authorized by the Manager, Seattle ACO, to make those findings. For
a repair method to be approved, the repair must meet the
certification basis of the airplane, and the approval must
specifically refer to this AD.
No Reporting Required
(h) For certain airplanes, the service bulletin referenced in
this AD recommends reporting any discrepancies to the manufacturer,
but this AD does not include that requirement.
Alternative Methods of Compliance (AMOCs)
(i)(1) The Manager, Seattle ACO, has the authority to approve
AMOCs for this AD, if requested in accordance with the procedures
found in 14 CFR 39.19.
(2) An AMOC that provides an acceptable level of safety may be
used for a repair required by this AD, if it is approved by an
Authorized Representative for the Boeing DOA Organization who has
been authorized by the Manager, Seattle ACO, to make such findings.
[[Page 20275]]
Material Incorporated by Reference
(j) You must use Boeing Alert Service Bulletin 747-53A2504,
dated August 19, 2004, to perform the actions that are required by
this AD, unless the AD specifies otherwise. The Director of the
Federal Register approves the incorporation by reference of this
document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. To
get copies of the service information, go to Boeing Commercial
Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207. To view
the AD docket, go to the Docket Management Facility, U.S. Department
of Transportation, 400 Seventh Street SW., room PL-401, Nassif
Building, Washington, DC. To review copies of the service
information, go to the National Archives and Records Administration
(NARA). For information on the availability of this material at the
NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Issued in Renton, Washington, on April 11, 2005.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 05-7683 Filed 4-18-05; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:55:57.626168+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 8ac74b5569245bf848ad6580c4534c8d7f40c1cfd52182c01d156b4ee7e12698
- Text SHA-256
- 783e5aea6d4d27e29169a6e5081aaf926adfc979b155e9256d204aa48d351512
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.