Published 2005-01-05 · Federal Register document 05-85
Airworthiness Directives; Rolls-Royce plc RB211-524 Series Turbofan Engines
Publication summary
The FAA is superseding an existing airworthiness directive (AD) for certain Rolls-Royce plc (RR) RB211-524 series turbofan engines. That AD currently requires initial and repetitive borescope insepctions of the head section and meterpanel assembly of the combustion liner, and replacement, if necessary, with serviceable parts. In addition, that AD allows an optional installation of a front combustion liner with a strengthened head section as a terminating action to the inspection requirements. This AD requires initial and repetitive borescope inspections of the head section and meterpanel assembly of the combustion liner, and replacement if necessary with serviceable parts. This AD also requires reduction of the inspection intervals of certain RB211-524 engine models that have not been repaired to RR Field Repair Scheme FRS5367/B, and a mandatory terminating action to be completed by a certain date. This AD results from five events that are directly attributed to combustor head breakup and meterpanel failure which were found at overhaul inspection. At least one of these events resulted in a combustion case burn-through. We are issuing this AD to prevent engine combustion liner deterioration, which can result in combustion liner breakup, case burn-through, and engine fire.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:17.300228+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2005-5d43d153038ee1c1
- Source row
- results[11]
- Raw source SHA-256
- 5d43d153038ee1c1c214f5c3688e38e25e37b832227fe65d52f7420a65ee20f2
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2004-26-05
- Effective date printed in this edition
- 2005-02-09
Read 15 complete recorded clauses
Effective Date
Effective Date
(a) This AD becomes effective February 9, 2005.
Exact source excerpt. Text positions 8206–8275, end exclusive, in the original decoded publication. SHA-256: 78b6a7980e31c7229f5774b7dc7429ebd2383d6a8187cf73b05391e45e07dc24
Affected ADs
Affected ADs
(b) This AD supersedes AD 97-07-04, Amendment 39-9978.
Exact source excerpt. Text positions 8275–8349, end exclusive, in the original decoded publication. SHA-256: 453e90342f1ebb680c3777daf583824faf20d53b552a8de3c9a926a7df7d44e5
Applicability wording · Applicability
Applicability
(c) This AD applies to Rolls-Royce plc (RR) engine models RB211-
524B-02, -524B2, -524B3, -524B4, -524C2, and -524D4 series engines
incorporating RR Service Bulletin (SB) No. RB.211-72-7221 or RR SB
No. RB.211-72-7998 with front combustion liner
[[Page 682]]
assembly, part number (P/N) UL16885, UL29916, UL27107, UL28972, or
UL28974 installed but not incorporating RR SB No. RB.211-72-9670 or
RR SB No. RB.211-72-9764, and engine models RB211-524G and -524H
series engines with front combustion liner assembly P/N UL27659,
UL23992, or UL22988 but not incorporating RR SB No. RB.211-72-9764.
These engines are installed on, but not limited to, Boeing 747 and
Lockheed L1011 series airplanes.
Exact source excerpt. Text positions 8349–9071, end exclusive, in the original decoded publication. SHA-256: a31c7dbba3cbc127b0ef570771c0adc136865a89f6d5cee3c30dd4c52d837c3c
Unsafe Condition
Unsafe Condition
(d) This AD results from five events that are directly
attributed to combustor head breakup and meterpanel failure which
were found at overhaul inspection. At least one of these events
resulted in a combustion case burn-through. The actions specified in
this AD are intended to prevent engine combustion liner
deterioration, which can result in combustion liner breakup, case
burn-through, and engine fire.
Exact source excerpt. Text positions 9071–9507, end exclusive, in the original decoded publication. SHA-256: 859ebadeb5b08d7cd2d08507e6c8faccf088455ea31d8e8e4205d96c36f34993
Compliance
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified unless the
actions have already been done. Engine inspections previously made
to RR Service Bulletin No. RB.211-72-B482, Revision 8, can be
credited for counting cycles since last inspection.
Exact source excerpt. Text positions 9507–9835, end exclusive, in the original decoded publication. SHA-256: 3a963f0224c85413c9bba525b6c341353b88162ff6e14b6e034cc48e20259592
Inspections of Combustion Liner Head Sections--Not Previously Repaired
Inspections of Combustion Liner Head Sections--Not Previously Repaired
(f) Borescope-inspect combustion liner head sections that have
not been previously repaired. Use paragraphs 3.A.(1) through 3.A.(5)
of the Accomplishment Instructions of RR Alert Service Bulletin
(ASB) No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 1 of this AD.
Table 1.--Combustor Head Section--Not Previously Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series (cycles since-new (cycles-since-last- (cycles-in-service
(CSN)) inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524C2, -524D4, -524G, and - Within 1,400 to 1,600 Within 200 CSLI........ Within 100 CIS after
524H. CSN. the effective date of
this AD.
(2) RB211-524B-02, -524B, -524B3, and Within 3,000 to 3,200 Within 200 CSLI........ Within 200 CIS after
-524B4. CSN. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
Exact source excerpt. Text positions 9835–11732, end exclusive, in the original decoded publication. SHA-256: 6cee26ae02284a734d76d9ad8aa4e1b89acb7f139c29074217b381e665531c8d
Inspections of Combustion Head Sections--Previously Repaired Using RR Field Repair Scheme FRS5367/B
Inspections of Combustion Head Sections--Previously Repaired Using RR
Field Repair Scheme FRS5367/B
(g) Borescope-inspect combustion liner head sections previously
repaired using RR Field Repair Scheme FRS5367/B. Use paragraphs
3.A.(1) through 3.A.(5) of the Accomplishment Instructions of RR ASB
No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 2 of this AD.
Table 2.--Combustor Head Section--Previously Repaired Using RR Field Repair Scheme FRS5367/B
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series (cycles-since-last- (cycles-since-last- (cycles-in-service
repair (CSLR)) inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524C2, -524D4, -524G, and - Within 1,800 to 2,200 Within 400 CSLI........ Within 200 CIS after
524H. CSLR. the effective date of
this AD.
(2) RB211-524B-02, -524B2, -524B3, Within 3,000 to 3,200 Within 400 CSLI........ Within 200 CIS after
and -524B4. CSLR. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
Exact source excerpt. Text positions 11732–13671, end exclusive, in the original decoded publication. SHA-256: 35a4aea3144c61e345984c1bd431c2c8aa318777f5798e196f5bd245a0d02cc3
Inspections of Combustion Head Sections That Have Been Repaired But Did Not Use RR Field Repair Scheme FRS5367/B
Inspections of Combustion Head Sections That Have Been Repaired But Did
Not Use RR Field Repair Scheme FRS5367/B
(h) Borescope-inspect combustion liner sections that have been
repaired using a method other than RR Field Repair Scheme FRS5367/B.
Use paragraphs 3.A.(1) through 3.A.(5) of the Accomplishment
Instructions of RR ASB No. RB.211-72-AB482, Revision 9, dated July
28, 2003, and the compliance thresholds in Table 3 of this AD.
Table 3.--Combustor Head Section--Repaired, But Did Not Use RR Field Repair Scheme FRS5367/B
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series cycles (cycles-since- cycles (cycles-since- (cycles-in-service
last-repair (CSLR)) last-inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524C2, -524D4, -524G, and - Within 500 to 700 CSLR. Within 200 CSLI........ Within 100 CIS after
524H. the effective date of
this AD.
(2) RB211-524B-02, -524B2, -524B3, Within 2,000 to 2,200 Within 200 CSLI........ Within 200 CIS after
and -524B4. CSLR. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
Note 1: For an installed front combustion liner that is subject
to RR ASB No. RB.211-72-AB482, Revision 9, dated July 28, 2003: If
the operator can confirm with the relevant overhaul base or repair
vendor that the nicrobraze repair RR Field Repair Scheme FRS5367 has
been applied to all 18 struts, then this is equivalent to compliance
with RR Field Repair Scheme FRS5367/B.
Note 2: Head sections repaired by replacement of all 18 struts
using RR Field Repair Scheme FRS6548 are considered as equivalent to
fitting a new head section for inspection purposes.
Exact source excerpt. Text positions 13671–16220, end exclusive, in the original decoded publication. SHA-256: 46bd0e0289892eca0d0f0bf46ea18892ab60f2c896e2c7e614f0c02e1a593728
Inspections of Meterpanel Assemblies--Not Repaired
Inspections of Meterpanel Assemblies--Not Repaired
(i) Borescope-inspect meterpanel assemblies, incorporating
Service Bulletin (SB) No. RB.211-72-7998, that have not been
previously repaired. Using Paragraphs 3.B.(1) through 3.B.(7) of the
Accomplishment Instructions of RR ASB No. RB.211-72-AB482, Revisions
9, dated July 28, 2003, and the compliance thresholds in Table 4 of
this AD.
[[Page 683]]
Table 4.--Meterpanel Assembly--Not Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series cycles-since-new (CSN) cycles (cycles-since- (cycles-in-service
last-inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524D4, -524G, and -524H.... Within 1,000 to 1,200 Within 400 CSLI........ Within 50 CIS after the
CSN. effective date of this
AD.
(2) RB211-524D4, -524G, and -524H Within 1,800 to 2,000 Within 400 CSLI........ Within 50 CIS after the
that have not used RB211-524H CSN. effective date of this
ratings at any time. AD.
----------------------------------------------------------------------------------------------------------------
Inspections of Meterpanel Assemblies--Repaired
(J) Borescope-inspect meterpanel assemblies, incorporating
Service Bulletin (SB) No. RB.211-72-7998, that have been previously
repaired. Use paragraphs 3.B.(1) through 3.B.(7) of the
Accomplishment Instructions of RR ASB No. RB.211-72-AB482, Revision
9, dated July 28, 2003, and the compliance thresholds in Table 5 of
this AD.
Table 5.--Meterpanel Assembly--Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series cycles (cycles-since- cycles (cycles-since- (cycles-in-service
last-repair (CSLR)) last-inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524D4, -524G, and -524H.... Within 500 to 700 CSLR. Within 400 CSLI........ Within 50 CIS after the
effective date of this
AD.
----------------------------------------------------------------------------------------------------------------
Note 3: There is no requirement to inspect meter panels for
combustors to a pre-RR SB No. RB.211-72-7998 standard.
Exact source excerpt. Text positions 16220–19815, end exclusive, in the original decoded publication. SHA-256: 007dc056739260948b3fe7eefe3e8e21d166d0a49d42b80560888195447417bb
Reject Parts
Reject Parts
(k) Replace parts that exceed the acceptance criteria.
Information about the acceptance criteria can be found in the
Aircraft Maintenance Manual, 72-00-00, Inspection/Check.
Exact source excerpt. Text positions 19815–20010, end exclusive, in the original decoded publication. SHA-256: 2415ed95d25181fc63a2230c09bff958601e0a3727866ff33d8eee0d366bc190
Mandatory Terminating Action
Mandatory Terminating Action
(l) Replace any front combustion liner assembly that has a P/N
listed in paragraph (c) of this AD at the next shop visit or within
10,000 CSN but no later than December 31, 2012.
(m) Replacement of the front combustion liner assembly with a
front combustion liner assembly that incorporates the modifications
in RR SB No. RB.211-72-9670 or RR SB No. RB.211-72-9764 in the
RB211-524B02, -524B2, -524B3, -524B4, -524C2 and -524D4 engines
constitutes terminating action to the repetitive inspections in
paragraphs (f), (g), (h), (i), and (j), of this AD.
(n) Replacement of the front combustion liner assembly with a
front combustion liner assembly that incorporates the modifications
in RR SB No. RB.211-72-9764 in the RB211-524G and -524H engines
constitutes terminating action to the repetitive inspections in
paragraphs (f), (g), (h), (i), and (j) of this AD.
Exact source excerpt. Text positions 20010–20925, end exclusive, in the original decoded publication. SHA-256: 4be566d6179f3d1d8e76362978f19864105a6cd2218ab28a675fff5fdc09daf3
Definition of Shop Visit
Definition of Shop Visit
(o) For the purpose of this AD, a shop visit is defined as any
time that the 04 module is removed for refurbishment or overhaul.
Exact source excerpt. Text positions 20925–21086, end exclusive, in the original decoded publication. SHA-256: 861d9e6c2e47a2c4fb74b83402b10164743aa4ac579ee7c5db3aeb08134139a2
Alternative Methods of Compliance
Alternative Methods of Compliance
(p) The Manager, Engine Certification Office, has the authority
to approve alternative methods of compliance for this AD if
requested using the procedures found in 14 CFR 39.19.
Exact source excerpt. Text positions 21086–21306, end exclusive, in the original decoded publication. SHA-256: 1bfc449ba806740d2e230961b7af9e96876e178129d2750b8316016aa284237a
Material Incorporated by Reference
Material Incorporated by Reference
(q) You must use the Rolls-Royce plc (RR) Alert Service Bulletin
(ASB) and Service Bulletins (SB's) listed in Table 6 of this AD to
do the inspections and replacements required by this AD. The
Director of the Federal Register approved the incorporation by
reference of RR ASB No. RB.211-72-AB482, Revision 9, dated July 28,
2003; SB's No. RB.211-72-9764, Revision 3, dated January 16, 1998,
No. RB.211-72-9670, Original Issue, dated August 27, 1993; and SB
No. RB.211-72-9764 Supplement, Revision 1, dated January 16, 1998;
in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You can get
copies at the FAA, New England Region, Office of the Regional
Counsel, 12 New England Executive Park, Burlington, MA; or at the
National Archives and Records Administration (NARA). For information
on the availability of this material at NARA, call 202-741-6030; or
go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Table 6 follows:
Table 6.--Incorporation by Reference
----------------------------------------------------------------------------------------------------------------
Page number(s) shown Revision level shown
Service bulletin on the page on the page Date shown on the page
----------------------------------------------------------------------------------------------------------------
RB.211-72-AB482,................... All................... 9..................... July 28, 2003.
Total Pages: 12
RB.211-72-9670,.................... All................... Original.............. Aug. 27, 1993.
Total Pages: 49
RB.211-72-9764..................... 1..................... 3..................... Jan. 16, 1998.
2..................... Original.............. Aug. 20, 1993.
3, 4.................. 3..................... Jan. 16, 1998.
5..................... 1..................... Aug. 25, 1995.
6..................... 3..................... Jan. 16, 1998.
7-10.................. Original.............. Aug. 20, 1993.
11.................... 3..................... Jan. 16, 1998.
12-30................. Original.............. Aug. 20, 1993.
Total Pages: 30
RB.211-72-9764 Supplement.......... 1..................... 1..................... Jan. 16, 1998.
Total Pages: 1
----------------------------------------------------------------------------------------------------------------
[[Page 684]]
Exact source excerpt. Text positions 21306–24131, end exclusive, in the original decoded publication. SHA-256: f8ad2fed507ce1b620a4941ae669a4a117d44c0c108ea59141ff7bc4a04cccc7
Related Information
Related Information
(r) Civil Aviation Authority airworthiness directive AD G-2003-
0011, dated October 1, 2003, (previously 005-07-95, dated November
15, 2001), also addresses the subject of this AD. Aircraft
Maintenance Manual 72-00-00 also addresses the subject of this AD.
Exact source excerpt. Text positions 24131–24415, end exclusive, in the original decoded publication. SHA-256: 66840d2ed9a5b826c04910e7c4805e1d3fd76dd41305ee052c4c316d321a1b43
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2004-26-05 · 1 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 16fb49fec02bd975fd1654240ef244d2e187b7188c55e855395727cdd3184273. Source manifest: 04dd93e4c8a736e92327ae177ca185e391d871cdb064a89cc1d27c4324b26533.
Official source · 2005-01-05
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 70, Number 3 (Wednesday, January 5, 2005)]
[Rules and Regulations]
[Pages 680-684]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 05-85]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 2004-NE-19-AD; Amendment 39-13917; AD 2004-26-05]
RIN 2120-AA64
Airworthiness Directives; Rolls-Royce plc RB211-524 Series
Turbofan Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is superseding an existing airworthiness directive
(AD) for certain Rolls-Royce plc (RR) RB211-524 series turbofan
engines. That AD currently requires initial and repetitive borescope
insepctions of the head section and meterpanel assembly of the
combustion liner, and replacement, if necessary, with serviceable
parts. In addition, that AD allows an optional installation of a front
combustion liner with a strengthened head section as a terminating
action to the inspection requirements. This AD requires initial and
repetitive borescope inspections of the head section and meterpanel
assembly of the combustion liner, and replacement if necessary with
serviceable parts. This AD also requires reduction of the inspection
intervals of certain RB211-524 engine models that have not been
repaired to RR Field Repair Scheme FRS5367/B, and a mandatory
terminating action to be completed by a certain date. This AD results
from five events that are directly attributed to combustor head breakup
and meterpanel failure which were found at overhaul inspection. At
least one of these events resulted in a combustion case burn-through.
We are issuing this AD to prevent engine combustion liner
deterioration, which
[[Page 681]]
can result in combustion liner breakup, case burn-through, and engine
fire.
DATES: This AD becomes effective February 9, 2005. The incorporation by
reference of RR ASB RB.211-72-AB482, Revision 9, dated July 28, 2003;
Rolls-Royce Service Bulletins (SB's) RB.211-72-9764, Revision 3, dated
January 16, 1998, RB.211-72-9670, Original Issue, dated August 27,
1993; and RB.211-72-9764 Supplement 1, dated January 16, 1998; are
approved by the Director of the Federal Register as of February 9,
2005.
ADDRESSES: You can get the service information identified in this AD
from Rolls-Royce plc, P.O. Box 31, Derby, DE24-8BJ, United Kingdom;
telephone: 011-44-1332-242424; fax 011-44-1332-249936.
You may examine the AD docket at the FAA, New England Region,
Office of the Regional Counsel, 12 New England Executive Park,
Burlington, MA. You may examine the service information, at the FAA,
New England Region, Office of the Regional Counsel, 12 New England
Executive Park, Burlington, MA; or at the National Archives and Records
Administration (NARA). For information on the availability of this
material at NARA, call 202-741-6030, or to to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
FOR FURTHER INFORMATION CONTACT: Ian Dargin, Aerospace Engineer, Engine
Certification Office, FAA, Engine and Propeller Directorate, 12 New
England Executive Park, Burlington, MA 01803-5299; telephone (781) 238-
7178; fax (781) 238-7199.
SUPPLEMENTARY INFORMATION: The FAA proposed to amend 14 CFR part 39
with a proposed AD. The proposed AD applies to RR RB211-524 series
turbofan engines. We published the proposed AD in the Federal Register
on May 18, 2004 (69 FR 28094). That action proposed to require initial
and repetitive borescope inspections of the head section and meterpanel
assembly of the combustion liner and replacement if necessary, with
serviceable parts. That action also proposed a reduction of the
inspection intervals of certain RB211-524 engine models that have not
been repaired to RR Field Repair Scheme FRS53667/B, and a mandatory
terminating action to be completed by a certain date.
Examining the AD Docket
You may examine the AD Docket (including any comments and service
information), by appointment, between 8 a.m. and 4:30 p.m., Monday
through Friday, except Federal holidays. See ADDRESSES for the
location.
Comments
We provided the public the opportunity to participate in the
development of this AD. We received no comments on the proposal or on
the determination of the cost to the public. However, we corrected RR
Service Bulletin (SB) No. RB.211-71-9670 in Compliance paragraph (q) of
this AD to RR SB No. RB.211.-72-9670.
Conclusion
We have carefully reviewed the available data and determined that
air safety and the public interest require adopting the AD with the
change described previously. We have determined that the change will
neither increase the economic burden on any operator nor increase the
scope of the AD.
Costs of Compliance
There are about 537 RB211-524 series turbofan engines of the
affected design in the worldwide fleet. We estimate that 18 engines
installed on airplanes of U.S. registry will be affected by this AD. We
also estimate that it will take approximately 2.0 work hours per engine
to perform the actions, and that the average labor rate is $65 per work
hour. Required parts will cost about $228,389 per engine. Based on
these figures, we estimate that total cost of the AD to U.S. operators
to be $4,113,342.
Authority for this Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866;
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a summary of the costs to comply with this AD and
placed it in the AD Docket. You may get a copy of this summary by
sending a request to us at the address listed under ADDRESSES. Include
``AD Docket No. 2004-NE-19-AD'' in your request.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the Federal Aviation Administration amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing Amendment 39-9978 (62 FR
16475, April 7, 1997) and by adding a new airworthiness directive,
Amendment 39-13917, to read as follows:
2004-26-05 Rolls-Royce plc: Amendment 39-13917. Docket No. 2004-NE-
19-AD. Supersedes AD 97-07-04, Amendment 39-9978.
Effective Date
(a) This AD becomes effective February 9, 2005.
Affected ADs
(b) This AD supersedes AD 97-07-04, Amendment 39-9978.
Applicability
(c) This AD applies to Rolls-Royce plc (RR) engine models RB211-
524B-02, -524B2, -524B3, -524B4, -524C2, and -524D4 series engines
incorporating RR Service Bulletin (SB) No. RB.211-72-7221 or RR SB
No. RB.211-72-7998 with front combustion liner
[[Page 682]]
assembly, part number (P/N) UL16885, UL29916, UL27107, UL28972, or
UL28974 installed but not incorporating RR SB No. RB.211-72-9670 or
RR SB No. RB.211-72-9764, and engine models RB211-524G and -524H
series engines with front combustion liner assembly P/N UL27659,
UL23992, or UL22988 but not incorporating RR SB No. RB.211-72-9764.
These engines are installed on, but not limited to, Boeing 747 and
Lockheed L1011 series airplanes.
Unsafe Condition
(d) This AD results from five events that are directly
attributed to combustor head breakup and meterpanel failure which
were found at overhaul inspection. At least one of these events
resulted in a combustion case burn-through. The actions specified in
this AD are intended to prevent engine combustion liner
deterioration, which can result in combustion liner breakup, case
burn-through, and engine fire.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified unless the
actions have already been done. Engine inspections previously made
to RR Service Bulletin No. RB.211-72-B482, Revision 8, can be
credited for counting cycles since last inspection.
Inspections of Combustion Liner Head Sections--Not Previously Repaired
(f) Borescope-inspect combustion liner head sections that have
not been previously repaired. Use paragraphs 3.A.(1) through 3.A.(5)
of the Accomplishment Instructions of RR Alert Service Bulletin
(ASB) No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 1 of this AD.
Table 1.--Combustor Head Section--Not Previously Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series (cycles since-new (cycles-since-last- (cycles-in-service
(CSN)) inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524C2, -524D4, -524G, and - Within 1,400 to 1,600 Within 200 CSLI........ Within 100 CIS after
524H. CSN. the effective date of
this AD.
(2) RB211-524B-02, -524B, -524B3, and Within 3,000 to 3,200 Within 200 CSLI........ Within 200 CIS after
-524B4. CSN. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
Inspections of Combustion Head Sections--Previously Repaired Using RR
Field Repair Scheme FRS5367/B
(g) Borescope-inspect combustion liner head sections previously
repaired using RR Field Repair Scheme FRS5367/B. Use paragraphs
3.A.(1) through 3.A.(5) of the Accomplishment Instructions of RR ASB
No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 2 of this AD.
Table 2.--Combustor Head Section--Previously Repaired Using RR Field Repair Scheme FRS5367/B
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series (cycles-since-last- (cycles-since-last- (cycles-in-service
repair (CSLR)) inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524C2, -524D4, -524G, and - Within 1,800 to 2,200 Within 400 CSLI........ Within 200 CIS after
524H. CSLR. the effective date of
this AD.
(2) RB211-524B-02, -524B2, -524B3, Within 3,000 to 3,200 Within 400 CSLI........ Within 200 CIS after
and -524B4. CSLR. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
Inspections of Combustion Head Sections That Have Been Repaired But Did
Not Use RR Field Repair Scheme FRS5367/B
(h) Borescope-inspect combustion liner sections that have been
repaired using a method other than RR Field Repair Scheme FRS5367/B.
Use paragraphs 3.A.(1) through 3.A.(5) of the Accomplishment
Instructions of RR ASB No. RB.211-72-AB482, Revision 9, dated July
28, 2003, and the compliance thresholds in Table 3 of this AD.
Table 3.--Combustor Head Section--Repaired, But Did Not Use RR Field Repair Scheme FRS5367/B
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series cycles (cycles-since- cycles (cycles-since- (cycles-in-service
last-repair (CSLR)) last-inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524C2, -524D4, -524G, and - Within 500 to 700 CSLR. Within 200 CSLI........ Within 100 CIS after
524H. the effective date of
this AD.
(2) RB211-524B-02, -524B2, -524B3, Within 2,000 to 2,200 Within 200 CSLI........ Within 200 CIS after
and -524B4. CSLR. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
Note 1: For an installed front combustion liner that is subject
to RR ASB No. RB.211-72-AB482, Revision 9, dated July 28, 2003: If
the operator can confirm with the relevant overhaul base or repair
vendor that the nicrobraze repair RR Field Repair Scheme FRS5367 has
been applied to all 18 struts, then this is equivalent to compliance
with RR Field Repair Scheme FRS5367/B.
Note 2: Head sections repaired by replacement of all 18 struts
using RR Field Repair Scheme FRS6548 are considered as equivalent to
fitting a new head section for inspection purposes.
Inspections of Meterpanel Assemblies--Not Repaired
(i) Borescope-inspect meterpanel assemblies, incorporating
Service Bulletin (SB) No. RB.211-72-7998, that have not been
previously repaired. Using Paragraphs 3.B.(1) through 3.B.(7) of the
Accomplishment Instructions of RR ASB No. RB.211-72-AB482, Revisions
9, dated July 28, 2003, and the compliance thresholds in Table 4 of
this AD.
[[Page 683]]
Table 4.--Meterpanel Assembly--Not Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series cycles-since-new (CSN) cycles (cycles-since- (cycles-in-service
last-inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524D4, -524G, and -524H.... Within 1,000 to 1,200 Within 400 CSLI........ Within 50 CIS after the
CSN. effective date of this
AD.
(2) RB211-524D4, -524G, and -524H Within 1,800 to 2,000 Within 400 CSLI........ Within 50 CIS after the
that have not used RB211-524H CSN. effective date of this
ratings at any time. AD.
----------------------------------------------------------------------------------------------------------------
Inspections of Meterpanel Assemblies--Repaired
(J) Borescope-inspect meterpanel assemblies, incorporating
Service Bulletin (SB) No. RB.211-72-7998, that have been previously
repaired. Use paragraphs 3.B.(1) through 3.B.(7) of the
Accomplishment Instructions of RR ASB No. RB.211-72-AB482, Revision
9, dated July 28, 2003, and the compliance thresholds in Table 5 of
this AD.
Table 5.--Meterpanel Assembly--Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Initial inspection Repetitive inspection inspection cycles
Engine series cycles (cycles-since- cycles (cycles-since- (cycles-in-service
last-repair (CSLR)) last-inspection (CSLI)) (CIS))
----------------------------------------------------------------------------------------------------------------
(1) RB211-524D4, -524G, and -524H.... Within 500 to 700 CSLR. Within 400 CSLI........ Within 50 CIS after the
effective date of this
AD.
----------------------------------------------------------------------------------------------------------------
Note 3: There is no requirement to inspect meter panels for
combustors to a pre-RR SB No. RB.211-72-7998 standard.
Reject Parts
(k) Replace parts that exceed the acceptance criteria.
Information about the acceptance criteria can be found in the
Aircraft Maintenance Manual, 72-00-00, Inspection/Check.
Mandatory Terminating Action
(l) Replace any front combustion liner assembly that has a P/N
listed in paragraph (c) of this AD at the next shop visit or within
10,000 CSN but no later than December 31, 2012.
(m) Replacement of the front combustion liner assembly with a
front combustion liner assembly that incorporates the modifications
in RR SB No. RB.211-72-9670 or RR SB No. RB.211-72-9764 in the
RB211-524B02, -524B2, -524B3, -524B4, -524C2 and -524D4 engines
constitutes terminating action to the repetitive inspections in
paragraphs (f), (g), (h), (i), and (j), of this AD.
(n) Replacement of the front combustion liner assembly with a
front combustion liner assembly that incorporates the modifications
in RR SB No. RB.211-72-9764 in the RB211-524G and -524H engines
constitutes terminating action to the repetitive inspections in
paragraphs (f), (g), (h), (i), and (j) of this AD.
Definition of Shop Visit
(o) For the purpose of this AD, a shop visit is defined as any
time that the 04 module is removed for refurbishment or overhaul.
Alternative Methods of Compliance
(p) The Manager, Engine Certification Office, has the authority
to approve alternative methods of compliance for this AD if
requested using the procedures found in 14 CFR 39.19.
Material Incorporated by Reference
(q) You must use the Rolls-Royce plc (RR) Alert Service Bulletin
(ASB) and Service Bulletins (SB's) listed in Table 6 of this AD to
do the inspections and replacements required by this AD. The
Director of the Federal Register approved the incorporation by
reference of RR ASB No. RB.211-72-AB482, Revision 9, dated July 28,
2003; SB's No. RB.211-72-9764, Revision 3, dated January 16, 1998,
No. RB.211-72-9670, Original Issue, dated August 27, 1993; and SB
No. RB.211-72-9764 Supplement, Revision 1, dated January 16, 1998;
in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You can get
copies at the FAA, New England Region, Office of the Regional
Counsel, 12 New England Executive Park, Burlington, MA; or at the
National Archives and Records Administration (NARA). For information
on the availability of this material at NARA, call 202-741-6030; or
go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Table 6 follows:
Table 6.--Incorporation by Reference
----------------------------------------------------------------------------------------------------------------
Page number(s) shown Revision level shown
Service bulletin on the page on the page Date shown on the page
----------------------------------------------------------------------------------------------------------------
RB.211-72-AB482,................... All................... 9..................... July 28, 2003.
Total Pages: 12
RB.211-72-9670,.................... All................... Original.............. Aug. 27, 1993.
Total Pages: 49
RB.211-72-9764..................... 1..................... 3..................... Jan. 16, 1998.
2..................... Original.............. Aug. 20, 1993.
3, 4.................. 3..................... Jan. 16, 1998.
5..................... 1..................... Aug. 25, 1995.
6..................... 3..................... Jan. 16, 1998.
7-10.................. Original.............. Aug. 20, 1993.
11.................... 3..................... Jan. 16, 1998.
12-30................. Original.............. Aug. 20, 1993.
Total Pages: 30
RB.211-72-9764 Supplement.......... 1..................... 1..................... Jan. 16, 1998.
Total Pages: 1
----------------------------------------------------------------------------------------------------------------
[[Page 684]]
Related Information
(r) Civil Aviation Authority airworthiness directive AD G-2003-
0011, dated October 1, 2003, (previously 005-07-95, dated November
15, 2001), also addresses the subject of this AD. Aircraft
Maintenance Manual 72-00-00 also addresses the subject of this AD.
Issued in Burlington, Massachusetts, on December 20, 2004.
Francis A. Favara,
Acting Manager, Engine and Propeller Directorate, Aircraft
Certification Service.
[FR Doc. 05-85 Filed 1-4-05; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:59:43.645703+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 9c5a1172b201ea133f5df7ba34d198eda918aec338ca27446c2de1450d77e25b
- Text SHA-256
- 16fb49fec02bd975fd1654240ef244d2e187b7188c55e855395727cdd3184273
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.