Back to publication catalog

Published 2010-06-01 · Federal Register document 2010-12678

Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model ERJ 190-100 STD, -100 LR, -100 IGW, -200 STD, -200 LR, and -200 IGW Airplanes

Publication summary

We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:

Why this record is shown

Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:33.146842+00:00. The title, summary and date are source facts.

Source revision
federal_register_ad_metadata_2010-a7267cd3a71dbd26
Source row
results[169]
Raw source SHA-256
a7267cd3a71dbd2645583c8a673df65e4a7fa9360a96e3be0de5b81f9d68c9a0

Final-rule publication

Recorded publication clauses

AD identifier printed in this edition
2010-11-14
Effective date printed in this edition
2010-07-06
Read 9 complete recorded clauses
Effective Date
Effective Date

    (a) This airworthiness directive (AD) becomes effective July 6, 
2010.

Exact source excerpt. Text positions 8091–8183, end exclusive, in the original decoded publication. SHA-256: 463daca017fec7ba11097cb1cbf661fcafa0e5cefac64638310ee85dadbf11e2

Affected ADs
Affected ADs

    (b) None.

Exact source excerpt. Text positions 8183–8212, end exclusive, in the original decoded publication. SHA-256: 027fbc44617399472b6ac4741da3aee18448654374228bcf4fe3f01df6b1539b

Applicability wording · Applicability
Applicability

    (c) This AD applies to all Empresa Brasileira de Aeronautica 
S.A. (EMBRAER) Model ERJ 190-100 STD, -100 LR, -100 IGW, -200 STD, -
200 LR, and -200 IGW airplanes, certificated in any category.

    Note 1:  This AD requires revisions to certain operator 
maintenance documents to include new inspections. Compliance with 
these inspections is required by 14 CFR 91.403(c). For airplanes 
that have been previously modified, altered, or repaired in the 
areas addressed by these inspections, the operator may not be able 
to accomplish the inspections described in the revisions. In this 
situation, to comply with 14 CFR 91.403(c), the operator must 
request approval for an alternative method of compliance according 
to paragraph (g)(1) of this AD. The request should include a 
description of changes to the required inspections that will ensure 
the continued operational safety of the airplane.

Exact source excerpt. Text positions 8212–9132, end exclusive, in the original decoded publication. SHA-256: 64ba9c99283bb089036b1a3caf8d27c9e597c69074b7d90e1469836bc55dcc83

Subject
Subject

    (d) Air Transport Association (ATA) of America Code 53: 
Fuselage; 57: Wings.

Exact source excerpt. Text positions 9132–9224, end exclusive, in the original decoded publication. SHA-256: e6734f466665eeeeff7033e159e356a4f630174ac594caa7fd2b38a6b102b8c1

Reason
Reason

    (e) The mandatory continuing airworthiness information (MCAI) 
states:
    During ERJ 190 airplane full scale fatigue test, cracks were 
found in some structural components of the airplane. Analysis of 
these cracks resulted in modifications on the airplane Airworthiness 
Limitation Items (ALI), to include new inspections tasks or 
modification of existing ones and its respective thresholds and 
intervals.
    Failure to inspect these components according to the new tasks, 
thresholds and intervals could prevent a timely detection of fatigue 
cracks. Undetected fatigue cracks in these areas could adversely 
affect the structural integrity of these airplanes.
* * * * *
The corrective action is revising the Airworthiness Limitations 
Section (ALS) of the Instructions for Continued Airworthiness (ICA) 
to incorporate new and modified structural inspections.

Exact source excerpt. Text positions 9224–10104, end exclusive, in the original decoded publication. SHA-256: 44f3c0f1ee829692c2190b7491c5ae4a473a774261c0289fff690ac96c5ac94e

Actions and Compliance
Actions and Compliance

    (f) Unless already done, do the following actions.
    (1) Within 90 days after the effective date of this AD: Revise 
the ALS of the ICA to include the tasks specified in Table 1 of this 
AD. These tasks are identified in EMBRAER Temporary Revision (TR) 2-
5, dated December 6, 2007; and EMBRAER TR 2-6, dated February 12, 
2008; to Appendix A, Part 2, Airworthiness Limitation Inspections 
(ALI)--Structures, of the EMBRAER 190 Maintenance Review Board 
Report (MRBR) MRB-1928.

    Note 2:  The actions required by paragraph (f)(1) of this AD may 
be done by inserting a copy of EMBRAER TR 2-5 and TR 2-6 into

[[Page 30279]]

the ALS of the EMBRAER 190 MRBR MRB-1928. When these TRs have been 
included in general revisions of the EMBRAER 190 MRBR MRB-1928, the 
general revisions may be inserted in the EMBRAER 190 MRBR MRB-1928, 
provided the relevant information in the general revision is 
identical to that in EMBRAER TR 2-5 and TR 2-6, and these TRs may be 
removed.

    (2) The initial compliance times for the tasks specified in 
EMBRAER TR 2-5, dated December 6, 2007; and EMBRAER TR 2-6, dated 
February 12, 2008; to Appendix A, Part 2, Airworthiness Limitation 
Inspections (ALI)--Structures, of the EMBRAER 190 MRBR MRB-1928; 
start at the later of the times specified in paragraphs (f)(2)(i) 
and (f)(2)(ii) of this AD. For certain tasks, the compliance times 
depend on the pre-modification and post-modification condition of 
the associated service bulletin, as specified in the 
``Applicability'' column of these TRs.
    (i) Within the applicable threshold times specified in these 
TRs.
    (ii) At the applicable compliance time specified in Table 1 of 
this AD.

                               Table 1--MRBR TRs and Tasks, With Compliance Times
----------------------------------------------------------------------------------------------------------------
          EMBRAER MRBR TR                      Subject               MRBR task No.          Compliance time
----------------------------------------------------------------------------------------------------------------
TR 2-5, dated December 6, 2007.....  Wing stub main box lower         57-01-002-0002  250 flight cycles after
                                      skin and splices--internal.                      effective date of this
                                                                                       AD.
TR 2-5, dated December 6, 2007.....  Wing stub spar 3--internal/      57-01-008-0003  500 flight cycles after
                                      external.                                        effective date of this
                                                                                       AD.
TR 2-5, dated December 6, 2007.....  Wing stub spar 3--external.      57-01-008-0004  500 flight cycles after
                                                                                       effective date of this
                                                                                       AD.
TR 2-5, dated December 6, 2007.....  Wing lower skin panel            57-10-007-0004  500 flight cycles after
                                      stringers--internal.                             effective date of this
                                                                                       AD.
TR 2-5, dated December 6, 2007.....  Wing main box rib 11--           57-10-012-0003  500 flight cycles after
                                      internal.                                        effective date of this
                                                                                       AD.
TR 2-6, dated December 12, 2008....  Nose landing gear wheel          53-10-021-0004  500 flight cycles after
                                      well metallic structure.                         effective date of this
                                                                                       AD.
----------------------------------------------------------------------------------------------------------------

     (iii) Thereafter, except as provided in paragraph (g) of this 
AD, no alternative replacement times or structural inspection 
intervals may be approved for these tasks.

FAA AD Differences

    Note 3: This AD differs from the MCAI and/or service information 
as follows:
    Although the MCAI specifies both revising the airworthiness 
limitations and doing repetitive inspections, this AD only specifies 
the revision. Requiring revision of the airworthiness limitations, 
rather than requiring individual repetitive inspections, is 
advantageous for operators because it allows them to record AD 
compliance status only at the time that they make the revision, 
rather than after every inspection. It also has the advantage of 
keeping all airworthiness limitations, whether imposed by original 
certification or by AD, in one place within the operator's 
maintenance program, thereby reducing the risk of non-compliance 
because of oversight or confusion.

Exact source excerpt. Text positions 10104–15182, end exclusive, in the original decoded publication. SHA-256: 15f4c2e135fcdd82ff163858db551a87a7b6ff26c8a3b3493e05977b02590e6d

Other FAA AD Provisions
Other FAA AD Provisions

    (g) The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
International Branch, ANM-116, Transport Airplane Directorate, FAA, 
has the authority to approve AMOCs for this AD, if requested using 
the procedures found in 14 CFR 39.19. Send information to ATTN: 
Kenny Kaulia, Aerospace Engineer, International Branch, ANM-116, 
Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, 
Washington 98057-3356; telephone (425) 227-2848; fax (425) 227-1149. 
Before using any approved AMOC on any airplane to which the AMOC 
applies, notify your principal maintenance inspector (PMI) or 
principal avionics inspector (PAI), as appropriate, or lacking a 
principal inspector, your local Flight Standards District Office. 
The AMOC approval letter must specifically reference this AD.
    (2) Airworthy Product: For any requirement in this AD to obtain 
corrective actions from a manufacturer or other source, use these 
actions if they are FAA-approved. Corrective actions are considered 
FAA-approved if they are approved by the State of Design Authority 
(or their delegated agent). You are required to assure the product 
is airworthy before it is returned to service.
    (3) Reporting Requirements: For any reporting requirement in 
this AD, under the provisions of the Paperwork Reduction Act (44 
U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has 
approved the information collection requirements and has assigned 
OMB Control Number 2120-0056.

Exact source excerpt. Text positions 15182–16746, end exclusive, in the original decoded publication. SHA-256: 7372a32e63c5e647acfd888b24e186e8ca9e12b173ac0da54e43603dfe49197e

Related Information
Related Information

    (h) Refer to MCAI Brazilian Airworthiness Directive 2009-04-02, 
effective April 29, 2009; and EMBRAER TR 2-5, dated December 6, 
2007, and EMBRAER TR 2-6, dated February 12, 2008, to Appendix A, 
Part 2, Airworthiness Limitation Inspections (ALI)--Structures, of 
the EMBRAER 190 MRBR MRB-1928; for related information.

Exact source excerpt. Text positions 16746–17093, end exclusive, in the original decoded publication. SHA-256: bab59b4b09e63e888056aa79ee5ab2362013a1593451a39a2f0de8dab798e1a9

Material Incorporated by Reference
Material Incorporated by Reference

    (i) You must use EMBRAER Temporary Revision 2-5, dated December 
6, 2007; and EMBRAER Temporary Revision 2-6, dated February 12, 
2008; to Appendix A, Part 2, Airworthiness Limitation Inspections 
(ALI)--Structures, of the EMBRAER 190 Maintenance Review Board 
Report MRB-1928; to do the actions required by this AD, unless the 
AD specifies otherwise.
    (1) The Director of the Federal Register approved the 
incorporation by reference of this service information under 5 
U.S.C. 552(a) and 1 CFR part 51.
    (2) For service information identified in this AD, contact 
Empresa Brasileira de Aeronautica S.A. (EMBRAER), Technical 
Publications Section (PC 060), Av. Brigadeiro Faria Lima, 2170--
Putim--12227-901 S[atilde]o Jose dos Campos--SP--BRASIL; telephone: 
+55 12 3927-5852 or +55 12 3309-0732; fax: +55 12 3927-7546; e-mail: 
[email protected]; Internet: http://www.flyembraer.com.
    (3) You may review copies of the service information at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, 
Washington. For information on the availability of this material at 
the FAA, call 425-227-1221.
    (4) You may also review copies of the service information that 
is incorporated by reference at the National Archives and Records 
Administration (NARA). For information on the availability of this 
material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

Exact source excerpt. Text positions 17093–18597, end exclusive, in the original decoded publication. SHA-256: 4a7924be6bc746aa8667e52e49a7afa20f0f780eb34d0e210d36f8e4b59c8ecc

No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.

Find all recorded historical references to AD 2010-11-14 · 1 printed reference observations in this pinned collection.

These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.

Why these observations are shown

They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.

Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: a4af43aa79b365d78e6ad0583b84d38aa67906f55d2cdb9a0739cb0fde7ad27d. Source manifest: 9e543ca1061a28578ee91d00d66b2b4542baeccd2913278d4eaa93bd3d937fa5.

Official source · 2010-06-01

Publication text

This is the complete recorded text of this dated publication.

Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.

Read the complete official publication text
[Federal Register Volume 75, Number 104 (Tuesday, June 1, 2010)]
[Rules and Regulations]
[Pages 30277-30279]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-12678]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2010-0175; Directorate Identifier 2009-NM-187-AD; 
Amendment 39-16319; AD 2010-11-14]
RIN 2120-AA64


Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. 
(EMBRAER) Model ERJ 190-100 STD, -100 LR, -100 IGW, -200 STD, -200 LR, 
and -200 IGW Airplanes

AGENCY: Federal Aviation Administration (FAA), Department of 
Transportation (DOT).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: We are adopting a new airworthiness directive (AD) for the 
products listed above. This AD results from mandatory continuing 
airworthiness information (MCAI) originated by an aviation authority of 
another country to identify and correct an unsafe condition on an 
aviation product. The MCAI describes the unsafe condition as:

    During ERJ 190 airplane full scale fatigue test, cracks were 
found in some structural components of the airplane. Analysis of 
these cracks resulted in modifications on the airplane Airworthiness 
Limitation Items (ALI), to include new inspections tasks or 
modification of existing ones and its respective thresholds and 
intervals.
    Failure to inspect these components according to the new tasks, 
thresholds and intervals could prevent a timely detection of fatigue 
cracks. Undetected fatigue cracks in these areas could adversely 
affect the structural integrity of these airplanes.
* * * * *

We are issuing this AD to require actions to correct the unsafe 
condition on these products.

DATES: This AD becomes effective July 6, 2010.
    The Director of the Federal Register approved the incorporation by 
reference of certain publications listed in this AD as of July 6, 2010.

ADDRESSES: You may examine the AD docket on the Internet at http://www.regulations.gov or in person at the U.S. Department of 
Transportation, Docket Operations, M-30, West Building Ground Floor, 
Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC.

FOR FURTHER INFORMATION CONTACT: Kenny Kaulia, Aerospace Engineer, 
International Branch, ANM-116, Transport Airplane Directorate, FAA, 
1601 Lind Avenue SW., Renton, Washington 98057-3356; telephone (425) 
227-2848; fax (425) 227-1149.

SUPPLEMENTARY INFORMATION:

Discussion

    We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR 
part 39 to include an AD that would apply to the specified products. 
That NPRM was published in the Federal Register on March 4, 2010 (75 FR 
9814). That NPRM proposed to correct an unsafe condition for the 
specified products. The MCAI states:

    During ERJ 190 airplane full scale fatigue test, cracks were 
found in some structural components of the airplane. Analysis of 
these cracks resulted in modifications on the airplane Airworthiness 
Limitation Items (ALI), to include new inspections tasks or 
modification of existing ones and its respective thresholds and 
intervals.
    Failure to inspect these components according to the new tasks, 
thresholds and intervals could prevent a timely detection of fatigue 
cracks. Undetected fatigue cracks in these areas could adversely 
affect the structural integrity of these airplanes.
* * * * *

The corrective action is revising the Airworthiness Limitations Section 
of the Instructions for Continued Airworthiness to incorporate new and 
modified structural inspections. You

[[Page 30278]]

may obtain further information by examining the MCAI in the AD docket.

Comments

    We gave the public the opportunity to participate in developing 
this AD. We received no comments on the NPRM or on the determination of 
the cost to the public.

Conclusion

    We reviewed the available data and determined that air safety and 
the public interest require adopting the AD as proposed.

Differences Between This AD and the MCAI or Service Information

    We have reviewed the MCAI and related service information and, in 
general, agree with their substance. But we might have found it 
necessary to use different words from those in the MCAI to ensure the 
AD is clear for U.S. operators and is enforceable. In making these 
changes, we do not intend to differ substantively from the information 
provided in the MCAI and related service information.
    We might also have required different actions in this AD from those 
in the MCAI in order to follow our FAA policies. Any such differences 
are highlighted in a Note within the AD.

Costs of Compliance

    We estimate that this AD will affect 65 products of U.S. registry. 
We also estimate that it will take about 1 work-hour per product to 
comply with the basic requirements of this AD. The average labor rate 
is $85 per work-hour. Based on these figures, we estimate the cost of 
this AD to the U.S. operators to be $5,525, or $85 per product.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. ``Subtitle VII: Aviation 
Programs,'' describes in more detail the scope of the Agency's 
authority.
    We are issuing this rulemaking under the authority described in 
``Subtitle VII, Part A, Subpart III, Section 44701: General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    We determined that this AD will not have federalism implications 
under Executive Order 13132. This AD will not have a substantial direct 
effect on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government.
    For the reasons discussed above, I certify this AD:
    1. Is not a ``significant regulatory action'' under Executive Order 
12866;
    2. Is not a ``significant rule'' under the DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979); and
    3. Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.
    We prepared a regulatory evaluation of the estimated costs to 
comply with this AD and placed it in the AD docket.

Examining the AD Docket

    You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Operations office 
between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays. The AD docket contains the NPRM, the regulatory evaluation, 
any comments received, and other information. The street address for 
the Docket Operations office (telephone (800) 647-5527) is in the 
ADDRESSES section. Comments will be available in the AD docket shortly 
after receipt.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

0
Accordingly, under the authority delegated to me by the Administrator, 
the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority:  49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new AD:

2010-11-14 Empresa Brasileira de Aeronautica S.A. (EMBRAER): 
Amendment 39-16319. Docket No. FAA-2010-0175; Directorate Identifier 
2009-NM-187-AD.

Effective Date

    (a) This airworthiness directive (AD) becomes effective July 6, 
2010.

Affected ADs

    (b) None.

Applicability

    (c) This AD applies to all Empresa Brasileira de Aeronautica 
S.A. (EMBRAER) Model ERJ 190-100 STD, -100 LR, -100 IGW, -200 STD, -
200 LR, and -200 IGW airplanes, certificated in any category.

    Note 1:  This AD requires revisions to certain operator 
maintenance documents to include new inspections. Compliance with 
these inspections is required by 14 CFR 91.403(c). For airplanes 
that have been previously modified, altered, or repaired in the 
areas addressed by these inspections, the operator may not be able 
to accomplish the inspections described in the revisions. In this 
situation, to comply with 14 CFR 91.403(c), the operator must 
request approval for an alternative method of compliance according 
to paragraph (g)(1) of this AD. The request should include a 
description of changes to the required inspections that will ensure 
the continued operational safety of the airplane.

Subject

    (d) Air Transport Association (ATA) of America Code 53: 
Fuselage; 57: Wings.

Reason

    (e) The mandatory continuing airworthiness information (MCAI) 
states:
    During ERJ 190 airplane full scale fatigue test, cracks were 
found in some structural components of the airplane. Analysis of 
these cracks resulted in modifications on the airplane Airworthiness 
Limitation Items (ALI), to include new inspections tasks or 
modification of existing ones and its respective thresholds and 
intervals.
    Failure to inspect these components according to the new tasks, 
thresholds and intervals could prevent a timely detection of fatigue 
cracks. Undetected fatigue cracks in these areas could adversely 
affect the structural integrity of these airplanes.
* * * * *
The corrective action is revising the Airworthiness Limitations 
Section (ALS) of the Instructions for Continued Airworthiness (ICA) 
to incorporate new and modified structural inspections.

Actions and Compliance

    (f) Unless already done, do the following actions.
    (1) Within 90 days after the effective date of this AD: Revise 
the ALS of the ICA to include the tasks specified in Table 1 of this 
AD. These tasks are identified in EMBRAER Temporary Revision (TR) 2-
5, dated December 6, 2007; and EMBRAER TR 2-6, dated February 12, 
2008; to Appendix A, Part 2, Airworthiness Limitation Inspections 
(ALI)--Structures, of the EMBRAER 190 Maintenance Review Board 
Report (MRBR) MRB-1928.

    Note 2:  The actions required by paragraph (f)(1) of this AD may 
be done by inserting a copy of EMBRAER TR 2-5 and TR 2-6 into

[[Page 30279]]

the ALS of the EMBRAER 190 MRBR MRB-1928. When these TRs have been 
included in general revisions of the EMBRAER 190 MRBR MRB-1928, the 
general revisions may be inserted in the EMBRAER 190 MRBR MRB-1928, 
provided the relevant information in the general revision is 
identical to that in EMBRAER TR 2-5 and TR 2-6, and these TRs may be 
removed.

    (2) The initial compliance times for the tasks specified in 
EMBRAER TR 2-5, dated December 6, 2007; and EMBRAER TR 2-6, dated 
February 12, 2008; to Appendix A, Part 2, Airworthiness Limitation 
Inspections (ALI)--Structures, of the EMBRAER 190 MRBR MRB-1928; 
start at the later of the times specified in paragraphs (f)(2)(i) 
and (f)(2)(ii) of this AD. For certain tasks, the compliance times 
depend on the pre-modification and post-modification condition of 
the associated service bulletin, as specified in the 
``Applicability'' column of these TRs.
    (i) Within the applicable threshold times specified in these 
TRs.
    (ii) At the applicable compliance time specified in Table 1 of 
this AD.

                               Table 1--MRBR TRs and Tasks, With Compliance Times
----------------------------------------------------------------------------------------------------------------
          EMBRAER MRBR TR                      Subject               MRBR task No.          Compliance time
----------------------------------------------------------------------------------------------------------------
TR 2-5, dated December 6, 2007.....  Wing stub main box lower         57-01-002-0002  250 flight cycles after
                                      skin and splices--internal.                      effective date of this
                                                                                       AD.
TR 2-5, dated December 6, 2007.....  Wing stub spar 3--internal/      57-01-008-0003  500 flight cycles after
                                      external.                                        effective date of this
                                                                                       AD.
TR 2-5, dated December 6, 2007.....  Wing stub spar 3--external.      57-01-008-0004  500 flight cycles after
                                                                                       effective date of this
                                                                                       AD.
TR 2-5, dated December 6, 2007.....  Wing lower skin panel            57-10-007-0004  500 flight cycles after
                                      stringers--internal.                             effective date of this
                                                                                       AD.
TR 2-5, dated December 6, 2007.....  Wing main box rib 11--           57-10-012-0003  500 flight cycles after
                                      internal.                                        effective date of this
                                                                                       AD.
TR 2-6, dated December 12, 2008....  Nose landing gear wheel          53-10-021-0004  500 flight cycles after
                                      well metallic structure.                         effective date of this
                                                                                       AD.
----------------------------------------------------------------------------------------------------------------

     (iii) Thereafter, except as provided in paragraph (g) of this 
AD, no alternative replacement times or structural inspection 
intervals may be approved for these tasks.

FAA AD Differences

    Note 3: This AD differs from the MCAI and/or service information 
as follows:
    Although the MCAI specifies both revising the airworthiness 
limitations and doing repetitive inspections, this AD only specifies 
the revision. Requiring revision of the airworthiness limitations, 
rather than requiring individual repetitive inspections, is 
advantageous for operators because it allows them to record AD 
compliance status only at the time that they make the revision, 
rather than after every inspection. It also has the advantage of 
keeping all airworthiness limitations, whether imposed by original 
certification or by AD, in one place within the operator's 
maintenance program, thereby reducing the risk of non-compliance 
because of oversight or confusion.

Other FAA AD Provisions

    (g) The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
International Branch, ANM-116, Transport Airplane Directorate, FAA, 
has the authority to approve AMOCs for this AD, if requested using 
the procedures found in 14 CFR 39.19. Send information to ATTN: 
Kenny Kaulia, Aerospace Engineer, International Branch, ANM-116, 
Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, 
Washington 98057-3356; telephone (425) 227-2848; fax (425) 227-1149. 
Before using any approved AMOC on any airplane to which the AMOC 
applies, notify your principal maintenance inspector (PMI) or 
principal avionics inspector (PAI), as appropriate, or lacking a 
principal inspector, your local Flight Standards District Office. 
The AMOC approval letter must specifically reference this AD.
    (2) Airworthy Product: For any requirement in this AD to obtain 
corrective actions from a manufacturer or other source, use these 
actions if they are FAA-approved. Corrective actions are considered 
FAA-approved if they are approved by the State of Design Authority 
(or their delegated agent). You are required to assure the product 
is airworthy before it is returned to service.
    (3) Reporting Requirements: For any reporting requirement in 
this AD, under the provisions of the Paperwork Reduction Act (44 
U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has 
approved the information collection requirements and has assigned 
OMB Control Number 2120-0056.

Related Information

    (h) Refer to MCAI Brazilian Airworthiness Directive 2009-04-02, 
effective April 29, 2009; and EMBRAER TR 2-5, dated December 6, 
2007, and EMBRAER TR 2-6, dated February 12, 2008, to Appendix A, 
Part 2, Airworthiness Limitation Inspections (ALI)--Structures, of 
the EMBRAER 190 MRBR MRB-1928; for related information.

Material Incorporated by Reference

    (i) You must use EMBRAER Temporary Revision 2-5, dated December 
6, 2007; and EMBRAER Temporary Revision 2-6, dated February 12, 
2008; to Appendix A, Part 2, Airworthiness Limitation Inspections 
(ALI)--Structures, of the EMBRAER 190 Maintenance Review Board 
Report MRB-1928; to do the actions required by this AD, unless the 
AD specifies otherwise.
    (1) The Director of the Federal Register approved the 
incorporation by reference of this service information under 5 
U.S.C. 552(a) and 1 CFR part 51.
    (2) For service information identified in this AD, contact 
Empresa Brasileira de Aeronautica S.A. (EMBRAER), Technical 
Publications Section (PC 060), Av. Brigadeiro Faria Lima, 2170--
Putim--12227-901 S[atilde]o Jose dos Campos--SP--BRASIL; telephone: 
+55 12 3927-5852 or +55 12 3309-0732; fax: +55 12 3927-7546; e-mail: 
[email protected]; Internet: http://www.flyembraer.com.
    (3) You may review copies of the service information at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, 
Washington. For information on the availability of this material at 
the FAA, call 425-227-1221.
    (4) You may also review copies of the service information that 
is incorporated by reference at the National Archives and Records 
Administration (NARA). For information on the availability of this 
material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.


    Issued in Renton, Washington, on May 13, 2010.
John Piccola,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 2010-12678 Filed 5-28-10; 8:45 am]
BILLING CODE 4910-13-P


Why this text is shown

The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:15:38.283276+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.

Open the captured official edition

Source SHA-256
207baaab3d839e14017c1180a166b804a548bb7254aff8339a5c6beac3f9c7f7
Text SHA-256
a4af43aa79b365d78e6ad0583b84d38aa67906f55d2cdb9a0739cb0fde7ad27d

Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence

Coverage and limits

These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.

The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.