Back to publication catalog

Published 2010-02-04 · Federal Register document 2010-2001

Airworthiness Directives; PIAGGIO AERO INDUSTRIES S.p.A Model PIAGGIO P-180 Airplanes

Publication summary

We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:

Why this record is shown

Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:33.146842+00:00. The title, summary and date are source facts.

Source revision
federal_register_ad_metadata_2010-a7267cd3a71dbd26
Source row
results[41]
Raw source SHA-256
a7267cd3a71dbd2645583c8a673df65e4a7fa9360a96e3be0de5b81f9d68c9a0

Final-rule publication

Recorded publication clauses

AD identifier printed in this edition
2010-03-09
Effective date printed in this edition
2010-03-11
Read 9 complete recorded clauses
Effective Date
Effective Date

    (a) This airworthiness directive (AD) becomes effective March 
11, 2010.

Exact source excerpt. Text positions 8974–9068, end exclusive, in the original decoded publication. SHA-256: f8985060a50e04bd9c42744472daf47f0e7b84915ed61a1d16d8223c49e8f544

Affected ADs
Affected ADs

    (b) None.

Exact source excerpt. Text positions 9068–9097, end exclusive, in the original decoded publication. SHA-256: 027fbc44617399472b6ac4741da3aee18448654374228bcf4fe3f01df6b1539b

Applicability wording · Applicability
Applicability

    (c) This AD applies to Model PIAGGIO P-180 airplanes, 
manufacturer's serial numbers 1106 through 1189, certificated in any 
category.

Exact source excerpt. Text positions 9097–9252, end exclusive, in the original decoded publication. SHA-256: bf5572b2e80515a67001de0e512dc49a0640264d7d65f975da517ff3637fa4b1

Subject
Subject

    (d) Air Transport Association of America (ATA) Code 53: 
Fuselage.

Exact source excerpt. Text positions 9252–9333, end exclusive, in the original decoded publication. SHA-256: b7ac1f14ed52fcd02d98f6ce539863490dcad61014f102d796e748da5c4576fc

Reason
Reason

    (e) The mandatory continuing airworthiness information (MCAI) 
states:

    Cracks have been detected on the upper flange (cap) of several 
``0'' pressure bulkheads on the production line; none of the cracks 
had spread across the thickness of material.
    Investigation revealed that all ``0'' pressure bulkheads 
installed on aircraft from MSN 1106 up to 1189 could have the same 
cracks.
    Although calculations confirm the low stress level in that area, 
a reinforcement of the ``0'' pressure bulkhead is suggested to avoid 
crack growth and the eventual failure of the bulkhead.
    For the reasons stated above, this new Airworthiness Directive 
(AD) mandates a non-destructive inspection and a reinforcement--by 
installation of doublers--of the ``0'' pressure bulkhead. This AD 
also includes a reporting requirement of the inspection results.

Exact source excerpt. Text positions 9333–10201, end exclusive, in the original decoded publication. SHA-256: 6944fd05a89d7bc164c8cbecc4987c3b1eef6f10e3a4b0abb00dba30f369dc2f

Actions and Compliance
Actions and Compliance

    (f) Unless already done, do the following actions:
    (1) As of March 11, 2010 (the effective date of this AD), before 
or when the airplane reaches a total of 3,600 hours time-in-service 
or within the next days 30 after the effective date of the AD, 
whichever occurs later, inspect the ``0'' pressure bulkhead for 
cracks using a dye-penetrant inspection method. Do the inspection in 
accordance with Part A of the Accomplishment Instructions in PIAGGIO 
AERO INDUSTRIES S.p.A Service Bulletin (Mandatory) N.: SB-80-
0267Rev.0, dated May 19, 2009; or PIAGGIO AERO INDUSTRIES S.p.A. 
Service Bulletin (Mandatory) N.: SB-80-0267Rev.1, dated June 16, 
2009.
    (2) Before further flight after the inspection required in 
paragraph (f)(1) of this AD (whether or not cracks were found), 
install doublers on the ``0'' pressure bulkhead. Do the modification 
in accordance with Part B and Part C of the Accomplishment 
Instructions in PIAGGIO AERO INDUSTRIES S.p.A Service Bulletin 
(Mandatory) N.: SB-80-0267Rev.0, dated May 19, 2009; or PIAGGIO AERO 
INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: SB-80-0267Rev.1, 
dated June 16, 2009.
    (3) Within 30 days after doing the inspection required in 
paragraph (f)(1) of this AD, report all inspection results, negative 
or positive, to Piaggio Aero Industries S.p.a., Via Cibrario, 4--
16154 Genoa, Italy; fax: +39 010 6481 881; e-mail: 
[email protected].

FAA AD Differences

    Note: This AD differs from the MCAI and/or service information 
as follows: No differences.

Exact source excerpt. Text positions 10201–11759, end exclusive, in the original decoded publication. SHA-256: a4dacc82d5fb2a5c90f44b02cad9031cfab46198a5fd4fad4803aff7ed30bcda

Other FAA AD Provisions
Other FAA AD Provisions

    (g) The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
Standards Office, FAA, has the authority to approve AMOCs for this 
AD, if requested using the procedures found in 14 CFR 39.19. Send 
information to ATTN: Sarjapur Nagarajan, Aerospace Engineer, FAA, 
Small Airplane Directorate, 901 Locust, Room 301, Kansas City, 
Missouri 64106; telephone: (816) 329-4145; fax: (816) 329-4090. 
Before using any approved AMOC on any airplane to which the AMOC 
applies, notify your appropriate principal inspector (PI) in the FAA 
Flight Standards District Office (FSDO), or lacking a PI, your local 
FSDO.
    (2) Airworthy Product: For any requirement in this AD to obtain 
corrective actions from a manufacturer or other source, use these 
actions if they are FAA-approved. Corrective actions are considered 
FAA-approved if they are approved by the State of Design Authority 
(or their delegated agent). You are required to assure the product 
is airworthy before it is returned to service.
    (3) Reporting Requirements: For any reporting requirement in 
this AD, under the provisions of the Paperwork Reduction Act (44 
U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has 
approved the information collection

[[Page 5697]]

requirements and has assigned OMB Control Number 2120-0056.

Exact source excerpt. Text positions 11759–13150, end exclusive, in the original decoded publication. SHA-256: db50686bf7429e1cd49c6925720591b9ee15b73aae754e7f986677c836f22534

Related Information
Related Information

    (h) Refer to MCAI European Aviation Safety Agency (EASA) AD No. 
2009-0211, dated October 6, 2009; PIAGGIO AERO INDUSTRIES S.p.A. 
Service Bulletin (Mandatory) N.: SB-80-0267Rev.0, dated May 19, 
2009; and PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin 
(Mandatory) N.: SB-80-0267Rev.1, dated June 16, 2009, for related 
information.

Exact source excerpt. Text positions 13150–13511, end exclusive, in the original decoded publication. SHA-256: c96eed8c4525da8c5d396e7e8a23de5ede3edbf72cb065c96b4647fbd726af8f

Material Incorporated by Reference
Material Incorporated by Reference

    (i) You must use PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin 
(Mandatory) N.: SB-80-0267Rev.0, dated May 19, 2009; and PIAGGIO 
AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: SB-80-
0267Rev.1, dated June 16, 2009, to do the actions required by this 
AD, unless the AD specifies otherwise.
    (1) The Director of the Federal Register approved the 
incorporation by reference of this service information under 5 
U.S.C. 552(a) and 1 CFR part 51.
    (2) For service information identified in this AD, contact 
Piaggio Aero Industries S.p.a., Via Cibrario, 4--16154 Genoa, Italy; 
fax: +39 010 6481 881; e-mail: [email protected].
    (3) You may review copies of the service information 
incorporated by reference for this AD at the FAA, Central Region, 
Office of the Regional Counsel, 901 Locust, Kansas City, Missouri 
64106. For information on the availability of this material at the 
Central Region, call (816) 329-3768.
    (4) You may also review copies of the service information 
incorporated by reference for this AD at the National Archives and 
Records Administration (NARA). For information on the availability 
of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

Exact source excerpt. Text positions 13511–14835, end exclusive, in the original decoded publication. SHA-256: d0ab6003240a91f4f5e5b744bc930dd58dc341e0baaffcd628a515dc86f4d4b7

No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.

Find all recorded historical references to AD 2010-03-09 · 0 printed reference observations in this pinned collection.

These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.

Why these observations are shown

They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.

Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 4e71d831abf7edd72be79838f84a91ea9cbd5ae9796fd7fd9f2e11c578e08d1e. Source manifest: 135b4fc6ea9d94fd02e11588d482e5e22f3ef80be1bd1fee27632518226fb00e.

Official source · 2010-02-04

Publication text

This is the complete recorded text of this dated publication.

Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.

Read the complete official publication text
[Federal Register Volume 75, Number 23 (Thursday, February 4, 2010)]
[Rules and Regulations]
[Pages 5695-5697]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-2001]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2009-1116; Directorate Identifier 2009-CE-061-AD; 
Amendment 39-16193; AD 2010-03-09]
RIN 2120-AA64


Airworthiness Directives; PIAGGIO AERO INDUSTRIES S.p.A Model 
PIAGGIO P-180 Airplanes

AGENCY: Federal Aviation Administration (FAA), Department of 
Transportation (DOT).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: We are adopting a new airworthiness directive (AD) for the 
products listed above. This AD results from mandatory continuing 
airworthiness information (MCAI) issued by an aviation authority of 
another country to identify and correct an unsafe condition on an 
aviation product. The MCAI describes the unsafe condition as:

    Cracks have been detected on the upper flange (cap) of several 
``0'' pressure bulkheads on the production line; none of the cracks 
had spread across the thickness of material.
    Investigation revealed that all ``0'' pressure bulkheads 
installed on aircraft from MSN 1106 up to 1189 could have the same 
cracks.

    We are issuing this AD to require actions to correct the unsafe 
condition on these products.

DATES: This AD becomes effective March 11, 2010.
    On March 11, 2010, the Director of the Federal Register approved 
the incorporation by reference of certain publications listed in this 
AD.

ADDRESSES: You may examine the AD docket on the Internet at http://www.regulations.gov or in person at Document Management Facility, U.S. 
Department of Transportation, Docket Operations, M-30, West Building 
Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 
20590.

FOR FURTHER INFORMATION CONTACT: Sarjapur Nagarajan, Aerospace 
Engineer, FAA, Small Airplane Directorate, 901 Locust, Room 301, Kansas 
City, Missouri 64106; telephone: (816) 329-4145; fax: (816) 329-4090.

SUPPLEMENTARY INFORMATION:

Discussion

    We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR 
part 39 to include an AD that would apply to the specified products. 
That NPRM was published in the Federal Register on November 30, 2009 
(74 FR 62516). That NPRM proposed to correct an unsafe condition for 
the specified products. The MCAI states:

    Cracks have been detected on the upper flange (cap) of several 
``0'' pressure bulkheads on the production line; none of the cracks 
had spread across the thickness of material.
    Investigation revealed that all ``0'' pressure bulkheads 
installed on aircraft from MSN 1106 up to 1189 could have the same 
cracks.
    Although calculations confirm the low stress level in that area, 
a reinforcement of the ``0'' pressure bulkhead is suggested to avoid 
crack growth and the eventual failure of the bulkhead.
    For the reasons stated above, this new Airworthiness Directive 
(AD) mandates a non-destructive inspection and a reinforcement--by 
installation of doublers--of the ``0'' pressure bulkhead. This AD 
also includes a reporting requirement of the inspection results.

    You may obtain further information by examining the MCAI in the AD 
docket.

Comments

    We gave the public the opportunity to participate in developing 
this AD. We considered the comment received.
    Mr. Carlo Cardu of Piaggio Aero Industries states that he 
understands owners/operators may comply with an AD before the specified 
compliance time; however, he also states it would be best for the 
owners/operators of the airplanes affected by this AD to do the 
inspection and modification of the pressure bulkhead during a D 
inspection, which is at 3,000 hours time-in-service (TIS).
    Mr. Cardu requests changing the compliance time for the inspection 
and modification from ``when the airplane reaches a total of 3,600 
hours TIS * * *'' to ``before the airplane reaches a total of 3,600 
hours TIS * * *.''
    We agree with the intent of the commenter. To make it clear that 
the owners/operators of the airplanes affected by this AD may comply 
with the AD before their airplane reaches 3,600 hours TIS, we will 
change the compliance time in the final rule AD action to allow the 
inspection and modification to be done before or when the airplane 
reaches a total of 3,600 hours TIS or within the next 30 days after the 
effective date of the AD, whichever occurs later.

Conclusion

    We reviewed the available data, including the comment received, and 
determined that air safety and the public interest require adopting the 
AD with the changes described previously. We determined that these 
changes will not increase the economic burden on any operator or 
increase the scope of the AD.

Differences Between This AD and the MCAI or Service Information

    We have reviewed the MCAI and related service information and, in 
general, agree with their substance. But we might have found it 
necessary to use different words from those in the MCAI to ensure the 
AD is clear for U.S. operators and is enforceable. In making these 
changes, we do not intend to differ substantively from the information 
provided in the MCAI and related service information.
    We might also have required different actions in this AD from those 
in the MCAI in order to follow FAA policies. Any such differences are 
highlighted in a NOTE within the AD.

Costs of Compliance

    We estimate that this AD will affect 63 products of U.S. registry. 
We also estimate that it would take about 120

[[Page 5696]]

work-hours per product to comply with the basic requirements of this 
AD. The design approval holder is providing warranty credit for parts 
and up to 120 work-hours of labor.
    Based on these figures, we estimate the cost of the proposed AD on 
U.S. operators to be $0.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. ``Subtitle VII: Aviation 
Programs,'' describes in more detail the scope of the Agency's 
authority.
    We are issuing this rulemaking under the authority described in 
``Subtitle VII, Part A, Subpart III, Section 44701: General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    We determined that this AD will not have federalism implications 
under Executive Order 13132. This AD will not have a substantial direct 
effect on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government.
    For the reasons discussed above, I certify this AD:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866;
    (2) Is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and
    (3) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.
    We prepared a regulatory evaluation of the estimated costs to 
comply with this AD and placed it in the AD Docket.

Examining the AD Docket

    You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Management Facility 
between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays. The AD docket contains the NPRM, the regulatory evaluation, 
any comments received, and other information. The street address for 
the Docket Office (telephone (800) 647-5527) is in the ADDRESSES 
section. Comments will be available in the AD docket shortly after 
receipt.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

0
Accordingly, under the authority delegated to me by the Administrator, 
the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new AD:

2010-03-09 Piaggio Aero Industries S.p.A.: Amendment 39-16193; 
Docket No. FAA-2009-1116; Directorate Identifier 2009-CE-061-AD.

Effective Date

    (a) This airworthiness directive (AD) becomes effective March 
11, 2010.

Affected ADs

    (b) None.

Applicability

    (c) This AD applies to Model PIAGGIO P-180 airplanes, 
manufacturer's serial numbers 1106 through 1189, certificated in any 
category.

Subject

    (d) Air Transport Association of America (ATA) Code 53: 
Fuselage.

Reason

    (e) The mandatory continuing airworthiness information (MCAI) 
states:

    Cracks have been detected on the upper flange (cap) of several 
``0'' pressure bulkheads on the production line; none of the cracks 
had spread across the thickness of material.
    Investigation revealed that all ``0'' pressure bulkheads 
installed on aircraft from MSN 1106 up to 1189 could have the same 
cracks.
    Although calculations confirm the low stress level in that area, 
a reinforcement of the ``0'' pressure bulkhead is suggested to avoid 
crack growth and the eventual failure of the bulkhead.
    For the reasons stated above, this new Airworthiness Directive 
(AD) mandates a non-destructive inspection and a reinforcement--by 
installation of doublers--of the ``0'' pressure bulkhead. This AD 
also includes a reporting requirement of the inspection results.

Actions and Compliance

    (f) Unless already done, do the following actions:
    (1) As of March 11, 2010 (the effective date of this AD), before 
or when the airplane reaches a total of 3,600 hours time-in-service 
or within the next days 30 after the effective date of the AD, 
whichever occurs later, inspect the ``0'' pressure bulkhead for 
cracks using a dye-penetrant inspection method. Do the inspection in 
accordance with Part A of the Accomplishment Instructions in PIAGGIO 
AERO INDUSTRIES S.p.A Service Bulletin (Mandatory) N.: SB-80-
0267Rev.0, dated May 19, 2009; or PIAGGIO AERO INDUSTRIES S.p.A. 
Service Bulletin (Mandatory) N.: SB-80-0267Rev.1, dated June 16, 
2009.
    (2) Before further flight after the inspection required in 
paragraph (f)(1) of this AD (whether or not cracks were found), 
install doublers on the ``0'' pressure bulkhead. Do the modification 
in accordance with Part B and Part C of the Accomplishment 
Instructions in PIAGGIO AERO INDUSTRIES S.p.A Service Bulletin 
(Mandatory) N.: SB-80-0267Rev.0, dated May 19, 2009; or PIAGGIO AERO 
INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: SB-80-0267Rev.1, 
dated June 16, 2009.
    (3) Within 30 days after doing the inspection required in 
paragraph (f)(1) of this AD, report all inspection results, negative 
or positive, to Piaggio Aero Industries S.p.a., Via Cibrario, 4--
16154 Genoa, Italy; fax: +39 010 6481 881; e-mail: 
[email protected].

FAA AD Differences

    Note: This AD differs from the MCAI and/or service information 
as follows: No differences.

Other FAA AD Provisions

    (g) The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
Standards Office, FAA, has the authority to approve AMOCs for this 
AD, if requested using the procedures found in 14 CFR 39.19. Send 
information to ATTN: Sarjapur Nagarajan, Aerospace Engineer, FAA, 
Small Airplane Directorate, 901 Locust, Room 301, Kansas City, 
Missouri 64106; telephone: (816) 329-4145; fax: (816) 329-4090. 
Before using any approved AMOC on any airplane to which the AMOC 
applies, notify your appropriate principal inspector (PI) in the FAA 
Flight Standards District Office (FSDO), or lacking a PI, your local 
FSDO.
    (2) Airworthy Product: For any requirement in this AD to obtain 
corrective actions from a manufacturer or other source, use these 
actions if they are FAA-approved. Corrective actions are considered 
FAA-approved if they are approved by the State of Design Authority 
(or their delegated agent). You are required to assure the product 
is airworthy before it is returned to service.
    (3) Reporting Requirements: For any reporting requirement in 
this AD, under the provisions of the Paperwork Reduction Act (44 
U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has 
approved the information collection

[[Page 5697]]

requirements and has assigned OMB Control Number 2120-0056.

Related Information

    (h) Refer to MCAI European Aviation Safety Agency (EASA) AD No. 
2009-0211, dated October 6, 2009; PIAGGIO AERO INDUSTRIES S.p.A. 
Service Bulletin (Mandatory) N.: SB-80-0267Rev.0, dated May 19, 
2009; and PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin 
(Mandatory) N.: SB-80-0267Rev.1, dated June 16, 2009, for related 
information.

Material Incorporated by Reference

    (i) You must use PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin 
(Mandatory) N.: SB-80-0267Rev.0, dated May 19, 2009; and PIAGGIO 
AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: SB-80-
0267Rev.1, dated June 16, 2009, to do the actions required by this 
AD, unless the AD specifies otherwise.
    (1) The Director of the Federal Register approved the 
incorporation by reference of this service information under 5 
U.S.C. 552(a) and 1 CFR part 51.
    (2) For service information identified in this AD, contact 
Piaggio Aero Industries S.p.a., Via Cibrario, 4--16154 Genoa, Italy; 
fax: +39 010 6481 881; e-mail: [email protected].
    (3) You may review copies of the service information 
incorporated by reference for this AD at the FAA, Central Region, 
Office of the Regional Counsel, 901 Locust, Kansas City, Missouri 
64106. For information on the availability of this material at the 
Central Region, call (816) 329-3768.
    (4) You may also review copies of the service information 
incorporated by reference for this AD at the National Archives and 
Records Administration (NARA). For information on the availability 
of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

    Issued in Kansas City, Missouri, on January 26, 2010.
John Colomy,
Acting Manager, Small Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 2010-2001 Filed 2-3-10; 8:45 am]
BILLING CODE 4910-13-P


Why this text is shown

The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:17:46.867910+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.

Open the captured official edition

Source SHA-256
b861bbf9a68cc2a70305cce0e7948964c1b6cbcff20bd1e72046807ea881a677
Text SHA-256
4e71d831abf7edd72be79838f84a91ea9cbd5ae9796fd7fd9f2e11c578e08d1e

Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence

Coverage and limits

These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.

The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.