Published 2012-01-09 · Federal Register document 2012-134
Airworthiness Directives; Rolls-Royce plc (RR) RB211-524 Series Turbofan Engines
Publication summary
We are superseding an existing airworthiness directive (AD) for the products listed above. That AD currently requires initial and repetitive borescope inspections of the head section and meterpanel assembly of the combustion liner, and replacement if necessary. This new AD requires those same inspections, and replacement. This AD also expands the applicability to include part numbers (P/N) of additional combustion liners. This AD was prompted by an inquiry submitted by an operator, which resulted in RR performing a complete review of the affected front combustion liner part numbers. We are issuing this AD to prevent deterioration of the engine combustion liner, which can result in combustion liner breakup, case burn-through, engine fire, and damage to the airplane.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:39.502075+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2012-08bffa249ae9a205
- Source row
- results[4]
- Raw source SHA-256
- 08bffa249ae9a2053bbfc0d74663d089914e83fb91f9bc4c8409ea28239f6875
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2011-18-21
- Effective date printed in this edition
- 2012-02-13
Read 16 complete recorded clauses
Effective Date
(a) Effective Date
This airworthiness directive (AD) is effective February 13,
2012.
Exact source excerpt. Text positions 7294–7386, end exclusive, in the original decoded publication. SHA-256: 15f2f7d7455529263351cef11af2af4cf66ff7eb3558a3cade7843591372b0f2
Affected ADs
(b) Affected ADs
This AD supersedes AD 2004-26-05, Amendment 39-13917 (70 FR 680,
January 5, 2005).
Exact source excerpt. Text positions 7386–7493, end exclusive, in the original decoded publication. SHA-256: e5a1098d9635e2bf198e24de481ed06cd382c5cb6975bb9f73bdabdb9962fddc
Applicability wording · Applicability
(c) Applicability
This AD applies to Rolls-Royce plc (RR) engine models RB211-
524B-02, -524B3-02 engines and RB211-524B2, -524B4, -524C2, and -
524D4 series engines with a front combustion liner assembly that
incorporates RR Service Bulletin (SB) No. RB.211-72-7221 or RR SB
No. RB.211-72-7998, but doesn't incorporate RR SB No. RB.211-72-9670
or RR SB No. RB.211-72-9764, and engine models RB211-524G and -524H
series engines with a front combustion liner assembly that doesn't
incorporate RR SB No. RB.211-72-9764.
Exact source excerpt. Text positions 7493–8022, end exclusive, in the original decoded publication. SHA-256: ef04a8485c57fa3333d42343c0c433ca69930f5a9e9447b99bb528a65046165c
Unsafe Condition
(d) Unsafe Condition
This AD results from an inquiry submitted by an operator which
resulted in RR performing a complete review of the affected front
combustion liner part numbers. We are issuing this AD to prevent
deterioration of the engine combustion liner, which can result in
combustion liner breakup, case burn-through, engine fire, and damage
to the airplane.
Exact source excerpt. Text positions 8022–8400, end exclusive, in the original decoded publication. SHA-256: 6cb777efc0512da0c1e1d0018c95d0ee310f1559d0e84ad9e078fabb887834e4
Compliance
(e) Compliance
You are responsible for having the actions required by this AD
performed within the compliance times specified unless the actions
have already been done.
Exact source excerpt. Text positions 8400–8577, end exclusive, in the original decoded publication. SHA-256: fe28ac00371355932bc45d4e5decd4ce441abcc68ea7a0f4d959e273ddff1a31
Credit for Previous Inspections
(f) Credit for Previous Inspections
Engine inspections previously done using RR SB No. RB.211-72-
B482, Revision 8, meet the requirements of this AD for the initial
and repetitive inspections specified in paragraph (g) and Table 1 of
this AD; and paragraph (h) and Table 2 of this AD.
[[Page 1011]]
Exact source excerpt. Text positions 8577–8885, end exclusive, in the original decoded publication. SHA-256: 498049ea35943ae647d640fec1b8a50be8f1e2e5aa5bc081eb5910e19457f683
Inspections of Combustion Liner Head Sections--Not Previously Repaired
(g) Inspections of Combustion Liner Head Sections--Not Previously
Repaired
Borescope-inspect combustion liner head sections that have not
been previously repaired. Use paragraphs 3.A.(1) through 3.A.(5) of
the Accomplishment Instructions of RR Alert Service Bulletin (ASB)
No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 1 of this AD to do the inspections.
Table 1--Combustion Liner Head Section--Not Previously Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524C2, -524D4, -524G, and -524H Within 1,400 to 1,600 Within 200 cycles-since- Within 100 cycles-in-
cycles-since-new (CSN). last inspection (CSLI). service (CIS) after
the effective date of
this AD.
RB211-524B-02, -524B2, -524B3-02, and Within 3,000 to 3,200 Within 200 CSLI........ Within 200 CIS after
-524B4. CSN. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
Exact source excerpt. Text positions 8885–10703, end exclusive, in the original decoded publication. SHA-256: ff0e4bd9404683fed2b1a877a8e776f03269781c64bfb3a1b8e0d4e580371589
Inspections of Combustion Liner Head Sections--Previously Repaired Using RR Field Repair Scheme FRS5367/B
(h) Inspections of Combustion Liner Head Sections--Previously Repaired
Using RR Field Repair Scheme FRS5367/B
Borescope-inspect combustion liner head sections previously
repaired using RR Field Repair Scheme FRS5367/B. Use paragraphs
3.A.(1) through 3.A.(5) of the Accomplishment Instructions of RR ASB
No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 2 of this AD to do the inspections.
Table 2--Combustion Liner Head Section--Previously Repaired Using RR Field Repair Scheme FRS5367/B
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524C2, -524D4, -524G, and -524H Within 1,800 to 2,200 Within 400 CSLI........ Within 200 CIS after
cycles-since-last the effective date of
repair (CSLR). this AD.
RB211-524B-02, -524B2, -524B3-02, and Within 3,000 to 3,200 Within 400 CSLI........ Within 200 CIS after
-524B4. CSLR. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
Exact source excerpt. Text positions 10703–12457, end exclusive, in the original decoded publication. SHA-256: 67806948cf4b4dd33a9f701d0cbeef8fdaad21f4fbfff8a9a7d177b26c45de25
Inspections of Combustion Liner Head Sections That Have Been Repaired But Did Not Use RR Field Repair Scheme FRS5367/B
(i) Inspections of Combustion Liner Head Sections That Have Been
Repaired But Did Not Use RR Field Repair Scheme FRS5367/B
Borescope-inspect combustion liner head sections that have been
repaired using a method other than RR Field Repair Scheme FRS5367/B.
Use paragraphs 3.A.(1) through 3.A.(5) of the Accomplishment
Instructions of RR ASB No. RB.211-72-AB482, Revision 9, dated July
28, 2003, and the compliance thresholds in Table 3 of this AD to do
the inspections.
Table 3--Combustion Liner Head Section--Repaired, But Did Not Use RR Field Repair Scheme FRS5367/B
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524C2, -524D4, -524G, and -524H Within 500 to 700 CSLR. Within 200 CSLI........ Within 100 CIS after
the effective date of
this AD.
RB211-524B-02, -524B2, -524B3-02, and Within 2,000 to 2,200 Within 200 CSLI........ Within 200 CIS after
[dash]524B4. CSLR. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
(1) For an installed front combustion liner that is subject to
RR ASB No. RB.211-72-AB482, Revision 9, dated July 28, 2003, if the
nicrobraze repair RR Field Repair Scheme FRS5367 has been applied to
all 18 struts, then that repair is equivalent to compliance with RR
Field Repair Scheme FRS5367/B.
(2) Head sections repaired by replacement of all 18 struts using
RR Field Repair Scheme FRS6548 are considered as equivalent to
fitting a new head section for inspection purposes.
Exact source excerpt. Text positions 12457–14744, end exclusive, in the original decoded publication. SHA-256: 1cfd8a0b3fe6e15308ebc5658a016a27bd5786c65b23c4c9836e4e1b76c46ef8
Inspections of Meterpanel Assemblies--Not Repaired
(j) Inspections of Meterpanel Assemblies--Not Repaired
Borescope-inspect meterpanel assemblies that incorporate SB No.
RB.211-72-7998, that have not been previously repaired. Use
paragraphs 3.B.(1) through 3.B.(7) of the Accomplishment
Instructions of RR ASB No. RB.211-72-AB482, Revision 9, dated July
28, 2003, and the compliance thresholds in Table 4 of this AD to do
the inspections.
Table 4--Meterpanel Assembly--Not Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524D4, -524G, and -524H........ Within 1,000 to 1,200 Within 400 CSLI........ Within 50 CIS after the
CSN. effective date of this
AD.
RB211-524D4, -524G, and -524H that Within 1,800 to 2,000 Within 400 CSLI........ Within 50 CIS after the
have not used RB211-524H ratings at CSN. effective date of this
any time. AD.
----------------------------------------------------------------------------------------------------------------
[[Page 1012]]
Exact source excerpt. Text positions 14744–16440, end exclusive, in the original decoded publication. SHA-256: ed1b1da924b36aa09a6827f04fe487ac5473b896a6a477792c0d058cb4e0a886
Inspections of Meterpanel Assemblies--Repaired
(k) Inspections of Meterpanel Assemblies--Repaired
Borescope-inspect meterpanel assemblies that incorporate SB No.
RB.211-72-7998, that have been previously repaired. Use paragraphs
3.B.(1) through 3.B.(7) of the Accomplishment Instructions of RR ASB
No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 5 of this AD to do the inspections.
Table 5--Meterpanel Assembly--Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524D4, -524G, and -524H........ Within 500 to 700 CSLR. Within 400 CSLI........ Within 50 CIS after the
effective date of this
AD.
----------------------------------------------------------------------------------------------------------------
Exact source excerpt. Text positions 16440–17789, end exclusive, in the original decoded publication. SHA-256: 5322c917dcc32ac1f6670d1862cadf24c8547e4754619cb089f71f729d8d91c9
Reject Parts
(l) Reject Parts
Remove from service, parts that exceed the acceptance criteria.
Exact source excerpt. Text positions 17789–17876, end exclusive, in the original decoded publication. SHA-256: ecdba48f6fc78146ee15a580d19cb4045396ad0b3a771b0bbc68d0cb57bce83c
Mandatory Terminating Action
(m) Mandatory Terminating Action
Replace any front combustion liner assembly that has a P/N
listed in paragraph (c) of this AD at the next shop visit.
(1) For RB211-524B-02, -524B3-02, -524B4, -524C2 and -524B2, -
524B4, -524C2, and -524D4 series engines, replacing the front
combustion liner assembly with a front combustion liner assembly
that incorporates the modifications in RR SB No. RB.211-72-9670,
Original Issue, dated August 27, 1993; or RR SB No. RB.211-72-9764,
Revision 3, dated January 16, 1998, constitutes terminating action
to the repetitive inspections in paragraphs (g), (h), (i), (j), and
(k) of this AD.
(2) For RB211-524G and -524H engines, replacing the front
combustion liner assembly with a front combustion liner assembly
that incorporates the modifications in RR SB No. RB.211-72-9764,
Revision 3, dated January 16, 1998, constitutes terminating action
to the repetitive inspections in paragraphs (f), (g), (h), (i), and
(j) of this AD.
Exact source excerpt. Text positions 17876–18866, end exclusive, in the original decoded publication. SHA-256: 25b8f51532172c2a319dc537f342123e12294f63a9386ca7d0202d17c2559354
Definition of Shop Visit
(n) Definition of Shop Visit
For the purpose of this AD, a shop visit is any time that the 04
module is removed for refurbishment or overhaul.
Exact source excerpt. Text positions 18866–19016, end exclusive, in the original decoded publication. SHA-256: 0e9dcdbf70a7a2494168e631b4109a989b06ea782933037f189c918a31267291
Related Information
(o) Related Information
Contact Alan Strom, Aerospace Engineer, Engine Certification
Office, FAA, 12 New England Executive Park, Burlington, MA 01803;
phone: (781) 238-7143; fax: (781) 238-7199; email:
[email protected], for more information about this AD.
Exact source excerpt. Text positions 19016–19282, end exclusive, in the original decoded publication. SHA-256: 773ed77c6b5bf62b773b34ea1d4bbf8e57256f5437a7ad9614932d0c2594679a
Material Incorporated by Reference
(p) Material Incorporated by Reference
You must use the following service information to do the actions
required by this AD, unless the AD specifies otherwise. The Director
of the Federal Register approved the incorporation by reference
(IBR) of the following service information under 5 U.S.C. 552(a) and
1 CFR part 51 on the date specified:
(1) Rolls-Royce plc Alert Service Bulletin No. RB.211-72-AB482,
Revision 9, July 28, 2003, approved for IBR February 9, 2005 (70 FR
680, January 5, 2005).
(2) Rolls-Royce plc Service Bulletin No. RB.211-72-9670,
Original Issue, August 27, 1993, approved for IBR February 9, 2005
(70 FR 680, January 5, 2005).
(3) Rolls-Royce plc Service Bulletin No. RB.211-72-9764,
Revision 3, January 16, 1998, approved for IBR February 9, 2005 (70
FR 680, January 5, 2005).
(4) For service information identified in this AD, contact
Rolls-Royce plc, P.O. Box 31, Derby, DE24 8BJ, United Kingdom;
phone: 011-44-1332-242424; fax: 011-44-1332-249936.
(5) You may review copies of the service information at the FAA,
Engine & Propeller Directorate, 12 New England Executive Park,
Burlington, MA. For information on the availability of this material
at the FAA, call (781) 238-7125.
(6) You may also review copies of the service information that
is incorporated by reference at the National Archives and Records
Administration (NARA). For information on the availability of this
material at an NARA facility, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Exact source excerpt. Text positions 19282–20882, end exclusive, in the original decoded publication. SHA-256: b48430a30ef58b53823d1d6828c1a97792ad0bd5d8f2c11605abd59ce79140e3
Explicit historical replacement wording
Find all recorded historical references to AD 2011-18-21 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 6f1cbd16ad1c65eaea48c7a7dac29dc0ec66156d3fcc863c99109990e95990a0. Source manifest: 9cd28c0247db58bdfba93c6c9d9666a20ab2f6b1d42c9e4e76fe046214ee208c.
Official source · 2012-01-09
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 77, Number 5 (Monday, January 9, 2012)]
[Rules and Regulations]
[Pages 1009-1012]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-134]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2009-0162; Directorate Identifier 2004-NE-19-AD;
Amendment 39-16803; AD 2011-18-21]
RIN 2120-AA64
Airworthiness Directives; Rolls-Royce plc (RR) RB211-524 Series
Turbofan Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are superseding an existing airworthiness directive (AD)
for the products listed above. That AD currently requires initial and
repetitive borescope inspections of the head section and meterpanel
assembly of the combustion liner, and replacement if necessary. This
new AD requires those same inspections, and replacement. This AD also
expands the applicability to include part numbers (P/N) of additional
combustion liners. This AD was prompted by an inquiry submitted by an
operator, which resulted in RR performing a complete review of the
affected front combustion liner part numbers. We are issuing this AD to
prevent deterioration of the engine combustion liner, which can result
in combustion liner breakup, case burn-through, engine fire, and damage
to the airplane.
DATES: This AD is effective February 13, 2012.
The Director of the Federal Register approved the incorporation by
reference of certain publications listed in this AD as of February 9,
2005 (70 FR 680, January 5, 2005).
ADDRESSES: For service information identified in this AD, contact
Rolls-Royce plc, P.O. Box 31, Derby, DE24 8BJ, United Kingdom; phone:
011-44-1332-242424; fax: 011-44-1332-249936, for the service
information identified in this proposed AD. You may review copies of
the referenced service information at the FAA, Engine & Propeller
Directorate, 12 New England Executive Park, Burlington, MA. For
information on the availability of this material at the FAA, call (781)
238-7125.
[[Page 1010]]
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Management Facility
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The address for the
Docket Office (phone: (800) 647-5527) is Document Management Facility,
U.S. Department of Transportation, Docket Operations, M-30, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE.,
Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Alan Strom, Aerospace Engineer, Engine
Certification Office, FAA, 12 New England Executive Park, Burlington,
MA 01803; phone: (781) 238-7143; fax: (781) 238-7199; email:
[email protected].
SUPPLEMENTARY INFORMATION:
Discussion
We issued a supplemental notice of proposed rulemaking (SNPRM) to
amend 14 CFR part 39 to supersede airworthiness directive (AD) 2004-26-
05, amendment 39-13917 (70 FR 680, January 5, 2005). That AD applies to
the specified products. The SNPRM published in the Federal Register on
October 18, 2010 (75 FR 63727). The SNPRM proposed to require:
<bullet> Initial and repetitive borescope inspections of the
combustion liner head section and meterpanel assembly of the combustion
liner and, if necessary, replacement.
<bullet> Reduction of the inspection intervals of certain RB211-524
engine models that have not been repaired to RR Field Repair Scheme
FRS5367/B, and
<bullet> A mandatory terminating action to the repetitive
inspections to be completed no later than December 31, 2012.
Comments
We gave the public the opportunity to participate in developing
this AD. We have considered the comment received. The Boeing Company
supports the SNPRM published in the Federal Register on October 18,
2010 (75 FR 63727).
We simplified wording for clarity in the regulatory section. We did
not change the requirements of this AD.
Conclusion
We reviewed the relevant data, considered the comments received,
and determined that air safety and the public interest require adopting
the AD as proposed.
Costs of Compliance
We estimate that this AD will affect 18 engines installed on
airplanes of U.S. registry. We also estimate that it will take about 32
work-hours per engine to perform the required actions, and that the
average labor rate is $85 per work-hour. Required parts will cost about
$231,000. Based on these figures, we estimate the total cost of the AD
to U.S. operators to be $4,206,960.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, Section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
subtitle VII, part A, subpart III, section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing airworthiness directive (AD)
2004-26-05, Amendment 39-13917 (70 FR 680, January 5, 2005), and adding
the following new AD:
2011-18-21 Rolls-Royce plc: Amendment 39-16803; Docket No. FAA-2009-
0162; Directorate Identifier 2004-NE-19-AD.
(a) Effective Date
This airworthiness directive (AD) is effective February 13,
2012.
(b) Affected ADs
This AD supersedes AD 2004-26-05, Amendment 39-13917 (70 FR 680,
January 5, 2005).
(c) Applicability
This AD applies to Rolls-Royce plc (RR) engine models RB211-
524B-02, -524B3-02 engines and RB211-524B2, -524B4, -524C2, and -
524D4 series engines with a front combustion liner assembly that
incorporates RR Service Bulletin (SB) No. RB.211-72-7221 or RR SB
No. RB.211-72-7998, but doesn't incorporate RR SB No. RB.211-72-9670
or RR SB No. RB.211-72-9764, and engine models RB211-524G and -524H
series engines with a front combustion liner assembly that doesn't
incorporate RR SB No. RB.211-72-9764.
(d) Unsafe Condition
This AD results from an inquiry submitted by an operator which
resulted in RR performing a complete review of the affected front
combustion liner part numbers. We are issuing this AD to prevent
deterioration of the engine combustion liner, which can result in
combustion liner breakup, case burn-through, engine fire, and damage
to the airplane.
(e) Compliance
You are responsible for having the actions required by this AD
performed within the compliance times specified unless the actions
have already been done.
(f) Credit for Previous Inspections
Engine inspections previously done using RR SB No. RB.211-72-
B482, Revision 8, meet the requirements of this AD for the initial
and repetitive inspections specified in paragraph (g) and Table 1 of
this AD; and paragraph (h) and Table 2 of this AD.
[[Page 1011]]
(g) Inspections of Combustion Liner Head Sections--Not Previously
Repaired
Borescope-inspect combustion liner head sections that have not
been previously repaired. Use paragraphs 3.A.(1) through 3.A.(5) of
the Accomplishment Instructions of RR Alert Service Bulletin (ASB)
No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 1 of this AD to do the inspections.
Table 1--Combustion Liner Head Section--Not Previously Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524C2, -524D4, -524G, and -524H Within 1,400 to 1,600 Within 200 cycles-since- Within 100 cycles-in-
cycles-since-new (CSN). last inspection (CSLI). service (CIS) after
the effective date of
this AD.
RB211-524B-02, -524B2, -524B3-02, and Within 3,000 to 3,200 Within 200 CSLI........ Within 200 CIS after
-524B4. CSN. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
(h) Inspections of Combustion Liner Head Sections--Previously Repaired
Using RR Field Repair Scheme FRS5367/B
Borescope-inspect combustion liner head sections previously
repaired using RR Field Repair Scheme FRS5367/B. Use paragraphs
3.A.(1) through 3.A.(5) of the Accomplishment Instructions of RR ASB
No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 2 of this AD to do the inspections.
Table 2--Combustion Liner Head Section--Previously Repaired Using RR Field Repair Scheme FRS5367/B
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524C2, -524D4, -524G, and -524H Within 1,800 to 2,200 Within 400 CSLI........ Within 200 CIS after
cycles-since-last the effective date of
repair (CSLR). this AD.
RB211-524B-02, -524B2, -524B3-02, and Within 3,000 to 3,200 Within 400 CSLI........ Within 200 CIS after
-524B4. CSLR. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
(i) Inspections of Combustion Liner Head Sections That Have Been
Repaired But Did Not Use RR Field Repair Scheme FRS5367/B
Borescope-inspect combustion liner head sections that have been
repaired using a method other than RR Field Repair Scheme FRS5367/B.
Use paragraphs 3.A.(1) through 3.A.(5) of the Accomplishment
Instructions of RR ASB No. RB.211-72-AB482, Revision 9, dated July
28, 2003, and the compliance thresholds in Table 3 of this AD to do
the inspections.
Table 3--Combustion Liner Head Section--Repaired, But Did Not Use RR Field Repair Scheme FRS5367/B
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524C2, -524D4, -524G, and -524H Within 500 to 700 CSLR. Within 200 CSLI........ Within 100 CIS after
the effective date of
this AD.
RB211-524B-02, -524B2, -524B3-02, and Within 2,000 to 2,200 Within 200 CSLI........ Within 200 CIS after
[dash]524B4. CSLR. the effective date of
this AD.
----------------------------------------------------------------------------------------------------------------
(1) For an installed front combustion liner that is subject to
RR ASB No. RB.211-72-AB482, Revision 9, dated July 28, 2003, if the
nicrobraze repair RR Field Repair Scheme FRS5367 has been applied to
all 18 struts, then that repair is equivalent to compliance with RR
Field Repair Scheme FRS5367/B.
(2) Head sections repaired by replacement of all 18 struts using
RR Field Repair Scheme FRS6548 are considered as equivalent to
fitting a new head section for inspection purposes.
(j) Inspections of Meterpanel Assemblies--Not Repaired
Borescope-inspect meterpanel assemblies that incorporate SB No.
RB.211-72-7998, that have not been previously repaired. Use
paragraphs 3.B.(1) through 3.B.(7) of the Accomplishment
Instructions of RR ASB No. RB.211-72-AB482, Revision 9, dated July
28, 2003, and the compliance thresholds in Table 4 of this AD to do
the inspections.
Table 4--Meterpanel Assembly--Not Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524D4, -524G, and -524H........ Within 1,000 to 1,200 Within 400 CSLI........ Within 50 CIS after the
CSN. effective date of this
AD.
RB211-524D4, -524G, and -524H that Within 1,800 to 2,000 Within 400 CSLI........ Within 50 CIS after the
have not used RB211-524H ratings at CSN. effective date of this
any time. AD.
----------------------------------------------------------------------------------------------------------------
[[Page 1012]]
(k) Inspections of Meterpanel Assemblies--Repaired
Borescope-inspect meterpanel assemblies that incorporate SB No.
RB.211-72-7998, that have been previously repaired. Use paragraphs
3.B.(1) through 3.B.(7) of the Accomplishment Instructions of RR ASB
No. RB.211-72-AB482, Revision 9, dated July 28, 2003, and the
compliance thresholds in Table 5 of this AD to do the inspections.
Table 5--Meterpanel Assembly--Repaired
----------------------------------------------------------------------------------------------------------------
Parts exceeding initial
Engine series Initial inspection Repetitive inspection inspection cycles
----------------------------------------------------------------------------------------------------------------
RB211-524D4, -524G, and -524H........ Within 500 to 700 CSLR. Within 400 CSLI........ Within 50 CIS after the
effective date of this
AD.
----------------------------------------------------------------------------------------------------------------
(l) Reject Parts
Remove from service, parts that exceed the acceptance criteria.
(m) Mandatory Terminating Action
Replace any front combustion liner assembly that has a P/N
listed in paragraph (c) of this AD at the next shop visit.
(1) For RB211-524B-02, -524B3-02, -524B4, -524C2 and -524B2, -
524B4, -524C2, and -524D4 series engines, replacing the front
combustion liner assembly with a front combustion liner assembly
that incorporates the modifications in RR SB No. RB.211-72-9670,
Original Issue, dated August 27, 1993; or RR SB No. RB.211-72-9764,
Revision 3, dated January 16, 1998, constitutes terminating action
to the repetitive inspections in paragraphs (g), (h), (i), (j), and
(k) of this AD.
(2) For RB211-524G and -524H engines, replacing the front
combustion liner assembly with a front combustion liner assembly
that incorporates the modifications in RR SB No. RB.211-72-9764,
Revision 3, dated January 16, 1998, constitutes terminating action
to the repetitive inspections in paragraphs (f), (g), (h), (i), and
(j) of this AD.
(n) Definition of Shop Visit
For the purpose of this AD, a shop visit is any time that the 04
module is removed for refurbishment or overhaul.
(o) Related Information
Contact Alan Strom, Aerospace Engineer, Engine Certification
Office, FAA, 12 New England Executive Park, Burlington, MA 01803;
phone: (781) 238-7143; fax: (781) 238-7199; email:
[email protected], for more information about this AD.
(p) Material Incorporated by Reference
You must use the following service information to do the actions
required by this AD, unless the AD specifies otherwise. The Director
of the Federal Register approved the incorporation by reference
(IBR) of the following service information under 5 U.S.C. 552(a) and
1 CFR part 51 on the date specified:
(1) Rolls-Royce plc Alert Service Bulletin No. RB.211-72-AB482,
Revision 9, July 28, 2003, approved for IBR February 9, 2005 (70 FR
680, January 5, 2005).
(2) Rolls-Royce plc Service Bulletin No. RB.211-72-9670,
Original Issue, August 27, 1993, approved for IBR February 9, 2005
(70 FR 680, January 5, 2005).
(3) Rolls-Royce plc Service Bulletin No. RB.211-72-9764,
Revision 3, January 16, 1998, approved for IBR February 9, 2005 (70
FR 680, January 5, 2005).
(4) For service information identified in this AD, contact
Rolls-Royce plc, P.O. Box 31, Derby, DE24 8BJ, United Kingdom;
phone: 011-44-1332-242424; fax: 011-44-1332-249936.
(5) You may review copies of the service information at the FAA,
Engine & Propeller Directorate, 12 New England Executive Park,
Burlington, MA. For information on the availability of this material
at the FAA, call (781) 238-7125.
(6) You may also review copies of the service information that
is incorporated by reference at the National Archives and Records
Administration (NARA). For information on the availability of this
material at an NARA facility, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Issued in Burlington, Massachusetts, on December 28, 2011.
Peter A. White,
Manager, Engine & Propeller Directorate, Aircraft Certification
Service.
[FR Doc. 2012-134 Filed 1-6-12; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:05:16.978882+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 6ad45b1389af37f6a8187d6b43a716a983a4b938dbeed3f6b4f5ba68bedc515e
- Text SHA-256
- 6f1cbd16ad1c65eaea48c7a7dac29dc0ec66156d3fcc863c99109990e95990a0
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.