Airworthiness Directives; Rolls-Royce plc Turbofan Engines
Publication summary
We are superseding an existing airworthiness directive (AD) for all Rolls-Royce plc (RR) RB211-Trent 875-17, RB211-Trent 877-17, RB211-Trent 884-17, RB211-Trent 884B-17, RB211-Trent 892-17, RB211- Trent 892B-17, and RB211-Trent 895-17 turbofan engines. That AD currently requires initial and repetitive ultrasonic inspections (UIs) of certain low-pressure (LP) compressor blades identified by serial number (S/N). This new AD requires the same actions but expands the population of blades. This AD was prompted by the need to add the inspections of the LP compressor blades listed by S/N in Appendices 3H through 3L of RR plc Alert Service Bulletin (ASB) No. RB.211-72-AG244, Revision 4, dated December 22, 2011. We are issuing this AD to prevent multiple LP compressor blades from failing due to blade root cracks, which could lead to uncontained engine failure and damage to the airplane.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:39.502075+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2012-08bffa249ae9a205
- Source row
- results[311]
- Raw source SHA-256
- 08bffa249ae9a2053bbfc0d74663d089914e83fb91f9bc4c8409ea28239f6875
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2012-18-07
- Effective date printed in this edition
- 2012-10-29
Read 10 complete recorded clauses
Effective Date
(a) Effective Date
This airworthiness directive (AD) is effective October 29, 2012.
Exact source excerpt. Text positions 13336–13426, end exclusive, in the original decoded publication. SHA-256: 50a9adb1217298b0364b4cf1f04999f33d89ba767f01ec557d4ea9caf38da2c3
Affected ADs
(b) Affected ADs
This AD supersedes AD 2012-06-23 (77 FR 20508, April 5, 2012).
Exact source excerpt. Text positions 13426–13512, end exclusive, in the original decoded publication. SHA-256: 5e469a88907a696200bed4f74bbdb686f3ef4ae27adf9c8deaa80100a1ed11e7
Applicability wording · Applicability
(c) Applicability
This AD applies to Rolls-Royce plc (RR) RB211-Trent 875-17,
RB211-Trent 877-17, RB211-Trent 884-17, RB211-Trent 884B-17, RB211-
Trent 892-17, RB211-Trent 892B-17, and RB211-Trent 895-17 turbofan
engines.
Exact source excerpt. Text positions 13512–13742, end exclusive, in the original decoded publication. SHA-256: 0cc2a150b5658c884f01e2584bedabf84d2e890d8766c0549ba7b21f3f8d12ca
Unsafe Condition
(d) Unsafe Condition
This AD was prompted by the need to add the inspections of the
low-pressure (LP) compressor blades listed by serial number (S/N) in
Appendices 3H through 3L of Rolls-Royce plc Alert Service Bulletin
(ASB) No. RB.211-72-AG244, Revision 4, dated December 22, 2011. We
are issuing this AD to prevent multiple LP compressor blades from
failing due to blade root cracks, which could lead to uncontained
engine failure and damage to the airplane.
Exact source excerpt. Text positions 13742–14216, end exclusive, in the original decoded publication. SHA-256: eea07666a5c51bd211cb0b2750117e173c4dfbdf1c6e885d8064b9e03b83de3c
Compliance
(e) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(1) Perform an initial ultrasonic inspection (UI) of the
affected LP compressor blades identified by S/N in Appendices 3A
through 3L of RR ASB No. RB.211-72-AG244, Revision 4, dated December
22, 2011. Use Table 1 to paragraph (e) of this AD to determine your
initial inspection threshold.
Table 1 to Paragraph (e)--Initial Inspection Thresholds
------------------------------------------------------------------------
Appendix number of RR ASB Number RB.211-
72-AG244, Revision 4, that identifies
affected LP compressor blades by S/N Initial inspection threshold
------------------------------------------------------------------------
3A and 3B.............................. Within 70 flight cycles after
the effective date of this AD.
3C..................................... Within 10 months after the
effective date of this AD.
3D..................................... Within 22 months after the
effective date of this AD.
3E..................................... Within 34 months after the
effective date of this AD.
3F..................................... Within 46 months after the
effective date of this AD.
[[Page 58765]]
3G..................................... Within 58 months after the
effective date of this AD.
3H..................................... Within 70 months after the
effective date of this AD.
3I..................................... Within 82 months after the
effective date of this AD.
3J..................................... Within 94 months after the
effective date of this AD.
3K..................................... Within 106 months after the
effective date of this AD.
3L..................................... Within 118 months after the
effective date of this AD.
------------------------------------------------------------------------
(2) Thereafter, perform repetitive UIs of the affected LP
compressor blades within every 100 flight cycles.
(3) Use paragraph 3.A.(2) of Accomplishment Instructions of RR
ASB No. RB.211-72-AG244, Revision 4, dated December 22, 2011, and
paragraphs 1. through 3.B. of Appendix 1 of that ASB, or paragraphs
3.B.(3) of Accomplishment Instructions of RR ASB No. RB.211-72-
AG244, Revision 4, dated December 22, 2011, and paragraphs 1.
through 3.C. of Appendix 2 of that ASB, to perform the UIs. Prior to
inspecting the blades per paragraph 3.B.(3) of the Accomplishment
Instructions remove the air intake fairing/spinner and spinner
extension and annulus fillers.
(4) Do not return to service any engine with blades that failed
the inspection required by this AD.
(5) For blades that are removed from the engine and pass
inspection, re-apply dry film lubricant before re-installing the
blades.
Exact source excerpt. Text positions 14216–17507, end exclusive, in the original decoded publication. SHA-256: 937bddf048e77e1a9ff35dbce22099f5d255406037d9ff25f87e528e65a9cbed
Installation Prohibition
(f) Installation Prohibition
After the effective date of this AD, do not install any affected
LP compressor blade that has reached the initial inspection
threshold in Table 1 to paragraph (e) of this AD, unless it has
passed the UI required by this AD.
Exact source excerpt. Text positions 17507–17769, end exclusive, in the original decoded publication. SHA-256: f566c41fb78eda2fd151502822927af8ab2e26a852fcd5229c5df2d5708ceec9
Credit for Previous Actions
(g) Credit for Previous Actions
You may take credit for the initial inspection that is required
by paragraph (e)(1) of this AD if you performed the initial
inspection before the effective date of this AD using RR ASB No.
RB.211-72-AG244, dated August 7, 2009; RR ASB No. RB.211-72-AG244,
Revision 1, dated January 26, 2010; RR ASB No. RB.211-72-AG244,
Revision 2, dated August 18, 2011; RR ASB No. RB.211-72-AG244,
Revision 3, dated December 13, 2011; or RR RB.211-72-E175, Revision
7, dated April 11, 2011.
Exact source excerpt. Text positions 17769–18290, end exclusive, in the original decoded publication. SHA-256: 668412015318db439858632f98c5fa5aef7a581f10080b2956d579c63ccf6411
Alternative Methods of Compliance (AMOCs)
(h) Alternative Methods of Compliance (AMOCs)
The Manager, Engine Certification Office, FAA, may approve AMOCs
for this AD. Use the procedures found in 14 CFR 39.19 to make your
request.
Exact source excerpt. Text positions 18290–18485, end exclusive, in the original decoded publication. SHA-256: 864ac541db5fd020b0e6eadf3c1b862c35ebc89258807656b8147c5ce102947d
Related Information
(i) Related Information
(1) For more information about this AD, contact Alan Strom,
Aerospace Engineer, Engine Certification Office, FAA, Engine &
Propeller Directorate, 12 New England Executive Park, Burlington, MA
01803; phone: 781-238-7143; fax: 781-238-7199; email:
[email protected].
(2) Refer to European Aviation Safety Agency AD 2012-0025, dated
February 8, 2012, for related information.
Exact source excerpt. Text positions 18485–18897, end exclusive, in the original decoded publication. SHA-256: b4a88fa9c35094921b4754ddb61238e8caea5a9378133a4eca8e49f8bed410ac
Material Incorporated by Reference
(j) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Rolls-Royce plc Alert Service Bulletin No. RB.211-72-AG244,
Revision 4, including appendices 1, 2, and 3A through 3L, dated
December 22, 2011.
(ii) Reserved.
(3) For service information identified in this AD, contact
Rolls-Royce plc, Corporate Communications, P.O. Box 31, Derby,
England, DE248BJ, phone: 011-44-1332-242424; fax: 011-44-1332-
245418; email: http://www.rolls-royce.com/contact/civil_team.jsp.
(4) You may view this service information at the FAA, Engine &
Propeller Directorate, 12 New England Executive Park, Burlington,
MA. For information on the availability of this material at the FAA,
call 781-238-7125.
(5) You may view this service information at the National
Archives and Records Administration (NARA). For information on the
availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal-register/cfr/ibr_locations.html.
Exact source excerpt. Text positions 18897–20177, end exclusive, in the original decoded publication. SHA-256: 81f097603415a02e654899ef16fee551670fda970567c5b6401e1cc45a87b217
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2012-18-07 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: a9c7ab766e2ecfbe5fd2250d966226503b7e1f1eb8bbf40956bab6463921f3bc. Source manifest: e6df5d9d5a7f614819e1186a0236811732a192d34141d31e5a7d5ea103f4889f.
Official source · 2012-09-24
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 77, Number 185 (Monday, September 24, 2012)]
[Rules and Regulations]
[Pages 58762-58765]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-23442]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2010-0821; Directorate Identifier 2010-NE-30-AD;
Amendment 39-17183; AD 2012-18-07]
RIN 2120-AA64
Airworthiness Directives; Rolls-Royce plc Turbofan Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are superseding an existing airworthiness directive (AD)
for all Rolls-Royce plc (RR) RB211-Trent 875-17, RB211-Trent 877-17,
RB211-Trent 884-17, RB211-Trent 884B-17, RB211-Trent 892-17, RB211-
Trent 892B-17, and RB211-Trent 895-17 turbofan engines. That AD
currently requires initial and repetitive ultrasonic inspections (UIs)
of certain low-pressure (LP) compressor blades identified by serial
number (S/N). This new AD requires the same actions but expands the
population of blades. This AD was prompted by the need to add the
inspections of the LP compressor blades listed by S/N in Appendices 3H
through 3L of RR plc Alert Service Bulletin (ASB) No. RB.211-72-AG244,
Revision 4, dated December 22, 2011. We are issuing this AD to prevent
multiple LP compressor blades from failing due to blade root cracks,
which could lead to uncontained engine failure and damage to the
airplane.
DATES: This AD is effective October 29, 2012.
The Director of the Federal Register approved the incorporation by
reference
[[Page 58763]]
of a certain publication listed in the AD as of October 29, 2012.
ADDRESSES: For service information identified in this AD, contact
Rolls-Royce plc, Corporate Communications, P.O. Box 31, Derby, England,
DE248BJ, phone: 011-44-1332-242424; fax: 011-44-1332-245418, or email:
http://www.rolls-royce.com/contact/civil_team.jsp. You may view this
service information at the FAA, Engine & Propeller Directorate, 12 New
England Executive Park, Burlington, MA. For information on the
availability of this material at the FAA, call 781-238-7125.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Management Facility
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The address for the
Docket Office (phone: 800-647-5527) is Document Management Facility,
U.S. Department of Transportation, Docket Operations, M-30, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE.,
Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Alan Strom, Aerospace Engineer, Engine
Certification Office, FAA, Engine & Propeller Directorate, 12 New
England Executive Park, Burlington, MA 01803; phone: 781-238-7143; fax:
781-238-7199; email: [email protected].
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to supersede AD 2012-06-23 (77 FR 20508, April 5, 2012). That
AD applies to the specified products. The NPRM published in the Federal
Register on May 3, 2012 (77 FR 26216). That NPRM proposed to continue
to require initial and repetitive UIs of certain LP compressor blades
identified by S/N. This AD requires the same actions but expands the
population of blades.
Comments
We gave the public the opportunity to participate in developing
this AD. The following presents the comments received on the proposal
and the FAA's response to each comment.
Request To Modify Initial Inspection Thresholds
Commenters RR and The Boeing Company (Boeing) requested that the
initial inspection thresholds listed in Table 1 of the proposed AD be
the same as those in RR ASB RB.211-72-AG244. Alternatively, RR and
Boeing asked that we adjust the calendar months after the effective
date of the AD to make them equivalent to the calendar dates in the
ASB. RR claims that allowing parts to remain on wing longer than the
times specified in the ASB will increase the risk of a fan blade
failure before a crack is detected.
We do not agree. The number of months for compliance after the
effective date of this AD is the same as in the EASA AD 2012-0025,
dated February 8, 2012. Also, shortening the initial inspection
thresholds now would require renotice and therefore delay
implementation of the AD. We did not change the AD.
Request To Revise Unsafe Condition Statement
RR asked that we change the unsafe condition statement in the AD to
indicate that the AD is being issued to prevent multiple blades from
the same engine from failing. RR indicated that this change is needed
because a single blade failure from the root is, by design, a contained
event.
We agree because multiple blades in an engine may develop cracks
and fail if not inspected. We changed the AD by revising the unsafe
condition statement in paragraph (d) of the AD from: ``We are issuing
this AD to prevent LP compressor blades from failing due to blade root
cracks, which could lead to uncontained engine failure and damage to
the airplane'' to ``We are issuing this AD to prevent multiple LP
compressor blades from failing due to blade root cracks, which could
lead to uncontained engine failure and damage to the airplane.''
Request To Revise Compliance Paragraph (e)(3)
Commenter American Airlines (American) requested that we change
paragraph (e)(3) from ``* * * and paragraphs 1. through 3.B. of
Appendix 1 of that ASB, or paragraphs 3.B.(1) through 3.B.(3) of
Accomplishment Instructions of RR ASB No. RB.211-72-AG244 * * *,'' to
``* * * and paragraphs 1. through 3.B. of Appendix 1 of that ASB, or
paragraph 3.B.(3) of Accomplishment Instructions of RR ASB No. RB.211-
72-AG244 * * *.''. American argued that paragraphs 3.B.(1) and 3.B.(2),
which require removal of the air intake fairing/spinner and spinner
extension and annulus fillers, are not needed to resolve the unsafe
condition noted in the AD.
We agree in part. We agree to remove the references to paragraphs
3.B.(1) and 3.B.(2) from the AD because it is not necessary to mandate
the procedures used to remove the air intake fairing/spinner and
spinner extension and annulus fillers. We disagree that removal of
these parts does not need to be mentioned in the AD because these parts
need to be removed before performing the UI. We therefore revised
paragraph (e)(3) in the AD from: ``Use paragraph 3.A.(2) of
Accomplishment Instructions of RR ASB No. RB.211-72-AG244, Revision 4,
dated December 22, 2011, and paragraphs 1. through 3.B. of Appendix 1
of that ASB, or paragraphs 3.B.(1) through 3.B.(3) of Accomplishment
Instructions of RR ASB No. RB.211-72-AG244, Revision 4, dated December
22, 2011, and paragraphs 1. through 3.C. of Appendix 2 of that ASB, to
perform the UIs.'' to ``Use paragraph 3.A.(2) of Accomplishment
Instructions of RR ASB No. RB.211-72-AG244, Revision 4, dated December
22, 2011, and paragraphs 1. through 3.B. of Appendix 1 of that ASB, or
paragraphs 3.B.(3) of Accomplishment Instructions of RR ASB No. RB.211-
72-AG244, Revision 4, dated December 22, 2011, and paragraphs 1.
through 3.C. of Appendix 2 of that ASB, to perform the UIs. Prior to
inspecting the blades per paragraph 3.B.(3) of the Accomplishment
Instructions remove the air intake fairing/spinner and spinner
extension and annulus fillers.''
Request To Revise Compliance Paragraph (e)(6)
American requested that paragraph (e)(6) of the AD be revised to
read: ``After the effective date of this AD, do not install any
affected LP compressor blade that has reached the initial inspection
threshold in Table 1, unless it has passed the UI required by this
AD.'' American indicated that the wording of the proposed AD implied
that if a blade fails a visual inspection, it may not be reinstalled
even if it passes a subsequent UI.
We agree. We revised the paragraph to read: ``After the effective
date of this AD, do not install any affected LP compressor blade that
has reached the initial inspection threshold in Table 1 to paragraph
(e), unless it has passed the UI required by this AD.'' We also moved
this paragraph to a separate Installation Prohibition paragraph (f).
Request To Revise Previous Credit Paragraph
American asked that the AD allow compressor blades inspected
ultrasonically before the effective date
[[Page 58764]]
of this AD using RR SB RB.211-72-E175, Revision 7, dated April 11,
2011, to be installed without further inspection. American indicated
that the UI instructions in SB RB.211-E175, Revision 7, are identical
to the UI instructions in ASB RB.211-72-AG244.
We agree. We changed the Credit for Previous Actions paragraph in
the AD from, ``You may take credit for the initial inspection that is
required by paragraph (e)(1) of this AD if you performed the initial
inspection before the effective date of this AD using RR ASB No.
RB.211-72-AG244, dated August 7, 2009; ASB No. RB.211-72-AG244,
Revision 1, dated January 26, 2010; ASB No. RB.211-72-AG244, Revision
2, dated August 18, 2011; or ASB No. RB.211-72-AG244, Revision 3, dated
December 13, 2011,'' to ``You may take credit for the initial
inspection that is required by paragraph (e)(1) of this AD if you
performed the initial inspection before the effective date of this AD
using RR ASB No. RB.211-72-AG244, dated August 7, 2009; ASB No. RB.211-
72-AG244, Revision 1, dated January 26, 2010; ASB No. RB.211-72-AG244,
Revision 2, dated August 18, 2011, ASB No. RB.211-72-AG244, Revision 3,
dated December 13, 2011 or RB.211-72-E175, Revision 7, dated April 11,
2011.''
Conclusion
We reviewed the relevant data, considered the comments received,
and determined that air safety and the public interest require adopting
the AD with the changes described previously. We also determined that
these changes will not increase the economic burden on any operator nor
increase the scope of the AD.
Costs of Compliance
Based on the service information, we estimate that this AD affects
about 158 engines installed on airplanes of U.S. registry. We also
estimate that it will take about 3 hours per engine inspection and six
inspections will be needed per year. The average labor rate is $85 per
work-hour. We estimate that one LP compressor blade per year will need
replacement at a cost of about $82,000. Based on these figures, we
estimate the annual cost of the AD on U.S. operators to be $323,740.
Our cost estimate is exclusive of possible warranty coverage.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, Section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing airworthiness directive (AD)
2012-06-23, Amendment 39-17004 (77 FR 20508, April 5, 2012), and adding
the following new AD:
2012-18-07 Rolls-Royce plc: Amendment 39-17183; Docket No. FAA-2010-
0821; Directorate Identifier 2010-NE-30-AD.
(a) Effective Date
This airworthiness directive (AD) is effective October 29, 2012.
(b) Affected ADs
This AD supersedes AD 2012-06-23 (77 FR 20508, April 5, 2012).
(c) Applicability
This AD applies to Rolls-Royce plc (RR) RB211-Trent 875-17,
RB211-Trent 877-17, RB211-Trent 884-17, RB211-Trent 884B-17, RB211-
Trent 892-17, RB211-Trent 892B-17, and RB211-Trent 895-17 turbofan
engines.
(d) Unsafe Condition
This AD was prompted by the need to add the inspections of the
low-pressure (LP) compressor blades listed by serial number (S/N) in
Appendices 3H through 3L of Rolls-Royce plc Alert Service Bulletin
(ASB) No. RB.211-72-AG244, Revision 4, dated December 22, 2011. We
are issuing this AD to prevent multiple LP compressor blades from
failing due to blade root cracks, which could lead to uncontained
engine failure and damage to the airplane.
(e) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(1) Perform an initial ultrasonic inspection (UI) of the
affected LP compressor blades identified by S/N in Appendices 3A
through 3L of RR ASB No. RB.211-72-AG244, Revision 4, dated December
22, 2011. Use Table 1 to paragraph (e) of this AD to determine your
initial inspection threshold.
Table 1 to Paragraph (e)--Initial Inspection Thresholds
------------------------------------------------------------------------
Appendix number of RR ASB Number RB.211-
72-AG244, Revision 4, that identifies
affected LP compressor blades by S/N Initial inspection threshold
------------------------------------------------------------------------
3A and 3B.............................. Within 70 flight cycles after
the effective date of this AD.
3C..................................... Within 10 months after the
effective date of this AD.
3D..................................... Within 22 months after the
effective date of this AD.
3E..................................... Within 34 months after the
effective date of this AD.
3F..................................... Within 46 months after the
effective date of this AD.
[[Page 58765]]
3G..................................... Within 58 months after the
effective date of this AD.
3H..................................... Within 70 months after the
effective date of this AD.
3I..................................... Within 82 months after the
effective date of this AD.
3J..................................... Within 94 months after the
effective date of this AD.
3K..................................... Within 106 months after the
effective date of this AD.
3L..................................... Within 118 months after the
effective date of this AD.
------------------------------------------------------------------------
(2) Thereafter, perform repetitive UIs of the affected LP
compressor blades within every 100 flight cycles.
(3) Use paragraph 3.A.(2) of Accomplishment Instructions of RR
ASB No. RB.211-72-AG244, Revision 4, dated December 22, 2011, and
paragraphs 1. through 3.B. of Appendix 1 of that ASB, or paragraphs
3.B.(3) of Accomplishment Instructions of RR ASB No. RB.211-72-
AG244, Revision 4, dated December 22, 2011, and paragraphs 1.
through 3.C. of Appendix 2 of that ASB, to perform the UIs. Prior to
inspecting the blades per paragraph 3.B.(3) of the Accomplishment
Instructions remove the air intake fairing/spinner and spinner
extension and annulus fillers.
(4) Do not return to service any engine with blades that failed
the inspection required by this AD.
(5) For blades that are removed from the engine and pass
inspection, re-apply dry film lubricant before re-installing the
blades.
(f) Installation Prohibition
After the effective date of this AD, do not install any affected
LP compressor blade that has reached the initial inspection
threshold in Table 1 to paragraph (e) of this AD, unless it has
passed the UI required by this AD.
(g) Credit for Previous Actions
You may take credit for the initial inspection that is required
by paragraph (e)(1) of this AD if you performed the initial
inspection before the effective date of this AD using RR ASB No.
RB.211-72-AG244, dated August 7, 2009; RR ASB No. RB.211-72-AG244,
Revision 1, dated January 26, 2010; RR ASB No. RB.211-72-AG244,
Revision 2, dated August 18, 2011; RR ASB No. RB.211-72-AG244,
Revision 3, dated December 13, 2011; or RR RB.211-72-E175, Revision
7, dated April 11, 2011.
(h) Alternative Methods of Compliance (AMOCs)
The Manager, Engine Certification Office, FAA, may approve AMOCs
for this AD. Use the procedures found in 14 CFR 39.19 to make your
request.
(i) Related Information
(1) For more information about this AD, contact Alan Strom,
Aerospace Engineer, Engine Certification Office, FAA, Engine &
Propeller Directorate, 12 New England Executive Park, Burlington, MA
01803; phone: 781-238-7143; fax: 781-238-7199; email:
[email protected].
(2) Refer to European Aviation Safety Agency AD 2012-0025, dated
February 8, 2012, for related information.
(j) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Rolls-Royce plc Alert Service Bulletin No. RB.211-72-AG244,
Revision 4, including appendices 1, 2, and 3A through 3L, dated
December 22, 2011.
(ii) Reserved.
(3) For service information identified in this AD, contact
Rolls-Royce plc, Corporate Communications, P.O. Box 31, Derby,
England, DE248BJ, phone: 011-44-1332-242424; fax: 011-44-1332-
245418; email: http://www.rolls-royce.com/contact/civil_team.jsp.
(4) You may view this service information at the FAA, Engine &
Propeller Directorate, 12 New England Executive Park, Burlington,
MA. For information on the availability of this material at the FAA,
call 781-238-7125.
(5) You may view this service information at the National
Archives and Records Administration (NARA). For information on the
availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal-register/cfr/ibr_locations.html.
Issued in Burlington, Massachusetts, on August 29, 2012.
Colleen M. D'Alessandro,
Assistant Manager, Engine & Propeller Directorate, Aircraft
Certification Service.
[FR Doc. 2012-23442 Filed 9-21-12; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T02:59:43.612846+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 9a68e54c457e81da81d95ce4eb575cc3020a406dd7332c2bc07f95984de22931
- Text SHA-256
- a9c7ab766e2ecfbe5fd2250d966226503b7e1f1eb8bbf40956bab6463921f3bc
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.