We are superseding an existing airworthiness directive (AD) for The Boeing Company Model 787-8 airplanes. That AD currently requires modification of the battery system, or other actions. This AD requires installing main and auxiliary power unit (APU) battery enclosures and environmental control system (ECS) ducts; and replacing the main battery, APU battery, and their respective battery chargers. This AD also requires revising the maintenance program to include an airworthiness limitation. This AD also revises the applicability by removing airplanes on which these changes have been incorporated in production prior to delivery. This AD was prompted by recent incidents involving lithium ion battery failures that resulted in release of flammable electrolytes, heat damage, and smoke on two Model 787-8 airplanes. We are issuing this AD to minimize the occurrence of battery cell failures and propagation of such failures to other cells and to contain any flammable electrolytes, heat, and smoke released during a battery thermal event in order to prevent damage to critical systems and structures and the potential for fire in the electronics equipment bays.

Why this record is shown

Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:42.577882+00:00. The title, summary and date are source facts.

Source revision
federal_register_ad_metadata_2013-a7b684f4a1b4614e
Source row
results[138]
Raw source SHA-256
a7b684f4a1b4614eef5ec9064d04a70a4701b45b0acd50058e29f235c625e705

Final-rule publication

Recorded publication clauses

AD identifier printed in this edition
2013-08-12
Effective date printed in this edition
2013-04-26
Read 12 complete recorded clauses
Effective Date
(a) Effective Date

    This AD is effective April 26, 2013.

Exact source excerpt. Text positions 17034–17096, end exclusive, in the original decoded publication. SHA-256: abe6af35a167cdbeb68a19d88cb5b4bd0e3d1cf252fa164cd72eff3d43a8bd71

Affected ADs
(b) Affected ADs

    This AD supersedes AD 2013-02-51, Amendment 39-17366 (78 FR 
12231, February 22, 2013).

Exact source excerpt. Text positions 17096–17207, end exclusive, in the original decoded publication. SHA-256: d91a218d218af817ff8a9fb26e197e92a2672aa61d82f38080ccd6c0a36ab285

Applicability wording · Applicability
(c) Applicability

    This AD applies to The Boeing Company Model 787-8 airplanes, 
certificated in any category; as identified in Boeing Alert Service 
Bulletin B787-81205-SB500003-00, Issue 001, dated April 19, 2013.

Exact source excerpt. Text positions 17207–17428, end exclusive, in the original decoded publication. SHA-256: 09f96edfec53737ea3cdaefd8db7e72467a580536264d66440cf71619f85e3d8

Subject
(d) Subject

    Joint Aircraft System Component (JASC)/Air Transport Association 
(ATA) of America Code 24, Electrical Power.

Exact source excerpt. Text positions 17428–17556, end exclusive, in the original decoded publication. SHA-256: fb76813e9d827737ce2cacff0eedb27a720db620316dc48385eb914507990ec5

Unsafe Condition
(e) Unsafe Condition

    This AD was prompted by recent incidents involving lithium ion 
battery failures that resulted in release of flammable electrolytes, 
heat damage, and smoke on two Model 787-8 airplanes. We are issuing 
this AD to minimize the occurrence of battery cell failures and 
propagation of such failures to other cells and to contain any 
flammable electrolytes, heat, and smoke released during a battery 
thermal event in order to prevent damage to critical systems and 
structures and the potential for fire in the electronics equipment 
bays.

Exact source excerpt. Text positions 17556–18122, end exclusive, in the original decoded publication. SHA-256: 650230828d2a2ac28319c598716d8ae46764bca178609c1dd96721a928ec5bef

Compliance
(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

Exact source excerpt. Text positions 18122–18224, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3

Installation/Replacement
(g) Installation/Replacement

    Before further flight: Install main battery and auxiliary power 
unit (APU) battery enclosures and environmental control system (ECS) 
ducts; and replace the main battery, APU battery, and their 
respective battery chargers; in accordance with the Accomplishment 
Instructions of Boeing Alert Service Bulletin B787-81205-SB500003-
00, Issue 001, dated April 19, 2013.

Exact source excerpt. Text positions 18224–18627, end exclusive, in the original decoded publication. SHA-256: 358ffcbf9d5e0d7b75d42aa82d9c431e47b7cc538f9e79ceb8d5bb5f2742d437

Maintenance Program Revision
(h) Maintenance Program Revision

    Before further flight: Revise the maintenance program to 
incorporate Item No. 1b. in Section D, ``Airworthiness Limitations--
Life Limits,'' of the Boeing 787 Airworthiness Limitations (AWLs) 
Document D011Z009-03-01, dated April 2013. This new item is the 
Systems Life-Limited Parts requirement for replacement of the main 
and APU battery enclosure vent burst discs.

Exact source excerpt. Text positions 18627–19037, end exclusive, in the original decoded publication. SHA-256: f6a3cbcab21ac5357f20fb47c3c2c36c07c1713a906f01d91f231239122150fc

No Alternative Actions and Intervals
(i) No Alternative Actions and Intervals

    After accomplishing the revision required by paragraph (h) of 
this AD, no changes may be made to Item No. 1b. in Section D, 
``Airworthiness Limitations--Life Limits,'' of the Boeing Model 787 
Airworthiness Limitations (AWLs) Document D011Z009-03-01, dated 
April 2013, unless approved as an alternative method of compliance 
(AMOC) in accordance with the procedures specified in paragraph (j) 
of this AD.

Exact source excerpt. Text positions 19037–19493, end exclusive, in the original decoded publication. SHA-256: 66e5bb2702090bd4ed72d309836deb461f2dbc34c4b2c86d860b7948fb804e79

Alternative Methods of Compliance (AMOCs)
(j) Alternative Methods of Compliance (AMOCs)

    (1) The Manager, Seattle Aircraft Certification Office (ACO), 
FAA, has the authority to approve AMOCs for this AD, if requested 
using the procedures found in 14 CFR 39.19. In accordance with 14 
CFR 39.19, send your request to your principal inspector or local 
Flight Standards District Office, as appropriate. If sending 
information directly to the manager of the ACO, send it to the 
attention of the person identified in the Related Information 
section of this AD. Information may be emailed to: [email protected].
    (2) Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office.
    (3) An AMOC that provides an acceptable level of safety may be 
used for any repair required by this AD if it is approved by the 
Boeing Commercial Airplanes Organization Designation Authorization 
(ODA) that has been authorized by the Manager, Seattle ACO, to make 
those findings. For a repair method to be approved, the repair must 
meet the certification basis of the airplane, and the approval must 
specifically refer to this AD.

Exact source excerpt. Text positions 19493–20725, end exclusive, in the original decoded publication. SHA-256: 79a135bdde1204d69fc171e6c1fc2adedfcaa3f94d93af09b32217e2265f152d

Related Information
(k) Related Information

    For more information about this AD, contact Robert Duffer, 
Manager, Systems and Equipment Branch, ANM-130S, Seattle Aircraft 
Certification Office, FAA, 1601 Lind Avenue SW., Renton, Washington 
98057-3356; phone: (425) 917-6493; fax: (425) 917-6590; email: 
[email protected].

Exact source excerpt. Text positions 20725–21034, end exclusive, in the original decoded publication. SHA-256: b23a74c6b37a065884ed483b6e74a739ccd23852169e899dd1414e668e7ea317

Material Incorporated by Reference
(l) Material Incorporated by Reference

    (1) The Director of the Federal Register approved the 
incorporation by reference (IBR) of the service information listed 
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
    (2) You must use this service information as applicable to do 
the actions required by this AD, unless the AD specifies otherwise.
    (i) Boeing Alert Service Bulletin B787-81205-SB500003-00, Issue 
001, dated April 19, 2013.
    (ii) Boeing 787 Airworthiness Limitations (AWLs) Document 
D011Z009-03-01, dated April 2013.
    (3) For Boeing service information identified in this AD, 
contact Boeing Commercial Airplanes, Attention: Data & Services 
Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; phone: 
206-544-5000, extension 1; fax: 206-766-5680; Internet: https://www.myboeingfleet.com.
    (4) You may review copies of the referenced service information 
at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., 
Renton, WA. For information on the availability of this material at 
the FAA, call 425-227-1221.
    (5) You may view this service information that is incorporated 
by reference at the National Archives and Records Administration 
(NARA). For information on the availability of this material at 
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

Exact source excerpt. Text positions 21034–22405, end exclusive, in the original decoded publication. SHA-256: 5b347f3dc0e6d74ba0bdee39f824f5f62f476be11505e4390c3f8c8460748493

Explicit historical replacement wording

Find all recorded historical references to AD 2013-08-12 · 0 printed reference observations in this pinned collection.

These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.

Why these observations are shown

They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.

Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 25fb29d51d8c807ce1e2f255874a631d50fe41d69281b6962a5ee7ab8673005d. Source manifest: 342dc5d9262a1f5113774ae63c0dc4f1e5b22161073cbc24fecb3d7475486baf.

Official source · 2013-04-26

Publication text

This is the complete recorded text of this dated publication.

Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.

Read the complete official publication text
[Federal Register Volume 78, Number 81 (Friday, April 26, 2013)]
[Rules and Regulations]
[Pages 24673-24676]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-09990]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2013-0333; Directorate Identifier 2013-NM-080-AD; 
Amendment 39-17436; AD 2013-08-12]
RIN 2120-AA64


Airworthiness Directives; The Boeing Company Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule; request for comments.

-----------------------------------------------------------------------

SUMMARY: We are superseding an existing airworthiness directive (AD) 
for The Boeing Company Model 787-8 airplanes. That AD currently 
requires modification of the battery system, or other actions. This AD 
requires installing main and auxiliary power unit (APU) battery 
enclosures and environmental control system (ECS) ducts; and replacing 
the main battery, APU battery, and their respective battery chargers. 
This AD also requires revising the maintenance program to include an 
airworthiness limitation. This AD also revises the applicability by 
removing airplanes on which these changes have been incorporated in 
production prior to delivery. This AD was prompted by recent incidents 
involving lithium ion battery failures that resulted in release of 
flammable electrolytes, heat damage, and smoke on two Model 787-8 
airplanes. We are issuing this AD to minimize the occurrence of battery 
cell failures and propagation of such failures to other cells and to 
contain any flammable electrolytes, heat, and smoke released

[[Page 24674]]

during a battery thermal event in order to prevent damage to critical 
systems and structures and the potential for fire in the electronics 
equipment bays.

DATES: This AD is effective April 26, 2013.
    The Director of the Federal Register approved the incorporation by 
reference of certain publications listed in the AD as of April 26, 
2013.
    We must receive any comments on this AD by June 10, 2013.

ADDRESSES: You may send comments by any of the following methods:
    <bullet> Federal eRulemaking Portal: Go to http://www.regulations.gov. Follow the instructions for submitting comments.
    <bullet> Fax: 202-493-2251.
    <bullet> Mail: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE., Washington, DC 20590.
    <bullet> Hand Delivery: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., 
Monday through Friday, except Federal holidays.
    For service information identified in this AD, contact Boeing 
Commercial Airplanes, Attention: Data & Services Management, P.O. Box 
3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544-5000, 
extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. 
You may review copies of the referenced service information at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, 
Washington. For information on the availability of this material at the 
FAA, call 425-227-1221.

Examining the AD Docket

    You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Management Facility 
between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays. The AD docket contains this AD, the regulatory evaluation, 
any comments received, and other information. The street address for 
the Docket Office (phone: 800-647-5527) is in the ADDRESSES section. 
Comments will be available in the AD docket shortly after receipt.

FOR FURTHER INFORMATION CONTACT: Robert Duffer, Manager, Systems and 
Equipment Branch, FAA, ANM-130S, Seattle Aircraft Certification Office, 
1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: (425) 917-
6493; fax: (425) 917-6590; email: [email protected].

SUPPLEMENTARY INFORMATION: 

Discussion

    On February 1, 2013, we issued AD 2013-02-51, Amendment 39-17366 
(78 FR 12231, February 22, 2013), for all The Boeing Company Model 787-
8 airplanes. That AD requires modification of the battery system, or 
other actions. That AD resulted from recent incidents involving lithium 
ion battery failures that resulted in release of flammable 
electrolytes, heat damage, and smoke on two Model 787-8 airplanes. We 
issued that AD to prevent damage to critical systems and structures and 
the potential for fire in the electrical compartment.

Actions Since AD 2013-02-51, Amendment 39-17366 (78 FR 12231, February 
22, 2013), Was Issued

    Since we issued AD 2013-02-51, Amendment 39-17366 (78 FR 12231, 
February 22, 2013), the National Transportation Safety Board (NTSB) 
released an Interim Factual Report, NTSB Case Number DCA13IA037, on 
March 7, 2013, presenting its initial findings concerning a battery 
failure on a Model 787-8 airplane operated by Japan Airlines. That 
report can be found at: http://www.ntsb.gov/investigations/2013/boeing_787/interim_report_B787_3-7-13.pdf.
    That report documents thermal and mechanical damage to the battery 
and the battery control units, and a lack of containment of the battery 
electrolytes, heat, and smoke from the battery case. The cause(s) of 
this battery failure incident has not yet been determined by the NTSB. 
Likewise, the cause(s) of the battery failure incident on a Model 787-8 
airplane operated by All Nippon Airways has not yet been determined by 
the Japan Transport Safety Board (JTSB), which is the accident 
investigative authority for Japan.
    The FAA has reviewed the NTSB's interim factual report, as well as 
information provided by the JTSB, Boeing, All Nippon Airways, and Japan 
Airlines. The main and APU batteries are identical, but perform 
different functions on the airplane. The main battery installed on 
Model 787-8 airplanes is used to provide power while the engines are 
off during ground maintenance operations (e.g., power-up, refueling, 
braking, and navigation lights during towing) and backup electrical 
power while airborne. The APU battery is required to start and operate 
the APU. The APU may be used on the ground, or in flight to generate 
backup electrical power. Each of the two engines drives two variable 
frequency starter generators (VFSGs) for a total of four VFSGs 
providing power to the airplane. Therefore, while in flight, the two 
generators driven by the APU provide the 5th and 6th layer of power 
generation for the airplane.
    On March 12, 2013, the FAA approved a Boeing plan to mitigate the 
unsafe condition identified by AD 2013-02-51, Amendment 39-17366 (78 FR 
12231, February 22, 2013). The plan resulted from a detailed review by 
Boeing and the FAA that considered all potential causal factors of the 
two recent battery incidents. The plan provides three layers of 
protection to improve the reliability of the battery and to prevent any 
hazardous effects on the airplane from a battery failure. Those layers 
are (1) measures to minimize the probability of a single battery cell 
failure, (2) measures to minimize the probability of any single battery 
cell failure from propagating to other cells in the battery, and (3) 
measures to preclude hazardous airplane-level safety effects of any 
battery failure that might occur. Details of these measures, which are 
mandated by this AD, are as follows:
    <bullet> Minimize the Probability of a Single Battery Cell 
Failure--Each main and APU battery consists of a set of individual 
cells within a battery case. Each battery cell will be encapsulated to 
isolate the cell electrically. Locking nuts with specific torque values 
will be used on every cell terminal to prevent overheating of the 
terminal due to a loose electrical connection. Drainage within the 
battery case will be improved to remove any condensation within the 
battery. The battery monitoring and charging unit will be changed to 
reduce the operational voltage range to lessen electrical stress on the 
battery cell, and to enhance over-discharge protection. Boeing has also 
made mandatory changes to the battery manufacturing and acceptance 
testing processes to improve the overall quality of the battery.
    <bullet> Minimize the Probability of Multiple Cell Failure 
Propagation--Additional insulation will be provided between each 
battery cell and between each cell and the battery case to thermally 
and electrically isolate the individual battery cells. High temperature 
sleeving will also be added to the battery internal wiring harness to 
protect against short circuits. In addition, cell venting will be added 
to the battery case to allow any cell gasses, including electrolytes, 
to escape into the battery enclosure to minimize heat build-up within 
the battery case.
    <bullet> Preclude Hazardous Airplane-Level Safety Effects of a 
Battery Failure That Might Occur--As stated previously, each main and 
APU battery consists of a set of individual cells within a battery

[[Page 24675]]

case. The case containing the cells will be secured within a stainless 
steel, sealed enclosure. This enclosure will be connected to a titanium 
ECS duct that vents to the outside of the airplane. Should a battery 
failure occur, and generate significant heat, pressure, and gasses, a 
metallic frangible disc (also referred to as a vent burst disc) at the 
interface of the enclosure and vent duct will open and allow the heat, 
pressure, and gasses to safely vent overboard through the ECS duct. 
This will prevent the introduction of any heat, pressure, or gasses in 
the electronics equipment bays or any occupied area of the airplane.

Relevant Service Information

    We reviewed Boeing Alert Service Bulletin B787-81205-SB500003-00, 
Issue 001, dated April 19, 2013; and Section D, ``Airworthiness 
Limitations--Life Limits,'' of the Boeing 787 Airworthiness Limitations 
(AWLs) Document D011Z009-03-01, dated April 2013. For information on 
the procedures and compliance times, see this service information at 
http://www.regulations.gov by searching for Docket No. FAA-2013-0333.

FAA's Determination

    We are issuing this AD because we evaluated all the relevant 
information and determined the unsafe condition described previously is 
likely to exist or develop in other products of the same type design.

AD Requirements

    This AD requires accomplishing the actions specified in the service 
information identified previously.

Change to Applicability of AD 2013-02-51, Amendment 39-17366 (78 FR 
12231, February 22, 2013)

    This AD applies to The Boeing Company Model 787-8 airplanes, as 
identified in Boeing Alert Service Bulletin B787-81205-SB500003-00, 
Issue 001, dated April 19, 2013, instead of ``all'' airplanes, as 
specified in AD 2013-02-51, Amendment 39-17366 (78 FR 12231, February 
22, 2013). The actions required by this AD address the identified 
unsafe condition for in-service airplanes. For all future delivered 
airplanes, the replacement batteries, their respective chargers, and 
enclosure and duct installations will be incorporated at the factory 
prior to delivery.

FAA's Justification and Determination of the Effective Date

    AD 2013-02-51, Amendment 39-17366 (78 FR 12231, February 22, 2013), 
effectively grounded the Model 787-8 fleet and prevented delivery of 
new Model 787-8 airplanes because there was no design solution 
available. While necessary in the short term to address the unsafe 
condition, this caused a significant economic burden on domestic and 
international operators of Boeing Model 787-8 airplanes. The purpose of 
this AD is to allow the aircraft to return to service as soon as 
possible by mandating a modification that will address the unsafe 
condition. Therefore, we find that notice and opportunity for prior 
public comment are impracticable and would defeat the Agency's 
regulatory objective, and that good cause exists for making this 
amendment effective in less than 30 days.

Comments Invited

    This AD is a final rule that involves requirements affecting flight 
safety, and we did not provide you with notice and an opportunity to 
provide your comments before it becomes effective. However, we invite 
you to send any written data, views, or arguments about this AD. Send 
your comments to an address listed under the ADDRESSES section. Include 
the docket number FAA-2013-0333 and Directorate Identifier 2013-NM-080-
AD at the beginning of your comments. We specifically invite comments 
on the overall regulatory, economic, environmental, and energy aspects 
of this AD. We will consider all comments received by the closing date 
and may amend this AD because of those comments.
    We will post all comments we receive, without change, to http://www.regulations.gov, including any personal information you provide. We 
will also post a report summarizing each substantive verbal contact we 
receive about this AD.

Costs of Compliance

    We estimate that this AD affects 6 airplanes of U.S. registry.
    We estimate the following costs to comply with this AD:

                                                 Estimated Costs
----------------------------------------------------------------------------------------------------------------
                                                                                     Cost per      Cost on U.S.
                Action                         Labor cost           Parts cost        product        operators
----------------------------------------------------------------------------------------------------------------
Installation and replacement..........  112 work-hours x $85 per        $455,158        $464,678      $2,788,068
                                         hour = $9,520.
Revise maintenance program............  1 work-hour x $85 per               None              85             510
                                         hour = $85.
----------------------------------------------------------------------------------------------------------------

    According to the manufacturer, some of the costs of this AD may be 
covered under warranty, thereby reducing the cost impact on affected 
individuals. We do not control warranty coverage for affected 
individuals. As a result, we have included all costs in our cost 
estimate.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, Section 106, describes the 
authority of the FAA Administrator. Subtitle VII, Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    We are issuing this rulemaking under the authority described in 
Subtitle VII, Part A, Subpart III, Section 44701, ``General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    This AD will not have federalism implications under Executive Order 
13132. This AD will not have a substantial direct effect on the States, 
on the relationship between the national government and the States, or 
on the distribution of power and responsibilities among the various 
levels of government.
    For the reasons discussed above, I certify that this AD:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866,

[[Page 24676]]

    (2) Is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979),
    (3) Will not affect intrastate aviation in Alaska, and
    (4) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA amends part 39 of the Federal Aviation 
Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by removing airworthiness directive (AD) 
2013-02-51, Amendment 39-17366 (78 FR 12231, February 22, 2013), and 
adding the following new AD:

2013-08-12 The Boeing Company: Amendment 39-17436; Docket No. FAA-
2013-0333; Directorate Identifier 2013-NM-080-AD.

(a) Effective Date

    This AD is effective April 26, 2013.

(b) Affected ADs

    This AD supersedes AD 2013-02-51, Amendment 39-17366 (78 FR 
12231, February 22, 2013).

(c) Applicability

    This AD applies to The Boeing Company Model 787-8 airplanes, 
certificated in any category; as identified in Boeing Alert Service 
Bulletin B787-81205-SB500003-00, Issue 001, dated April 19, 2013.

(d) Subject

    Joint Aircraft System Component (JASC)/Air Transport Association 
(ATA) of America Code 24, Electrical Power.

(e) Unsafe Condition

    This AD was prompted by recent incidents involving lithium ion 
battery failures that resulted in release of flammable electrolytes, 
heat damage, and smoke on two Model 787-8 airplanes. We are issuing 
this AD to minimize the occurrence of battery cell failures and 
propagation of such failures to other cells and to contain any 
flammable electrolytes, heat, and smoke released during a battery 
thermal event in order to prevent damage to critical systems and 
structures and the potential for fire in the electronics equipment 
bays.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Installation/Replacement

    Before further flight: Install main battery and auxiliary power 
unit (APU) battery enclosures and environmental control system (ECS) 
ducts; and replace the main battery, APU battery, and their 
respective battery chargers; in accordance with the Accomplishment 
Instructions of Boeing Alert Service Bulletin B787-81205-SB500003-
00, Issue 001, dated April 19, 2013.

(h) Maintenance Program Revision

    Before further flight: Revise the maintenance program to 
incorporate Item No. 1b. in Section D, ``Airworthiness Limitations--
Life Limits,'' of the Boeing 787 Airworthiness Limitations (AWLs) 
Document D011Z009-03-01, dated April 2013. This new item is the 
Systems Life-Limited Parts requirement for replacement of the main 
and APU battery enclosure vent burst discs.

(i) No Alternative Actions and Intervals

    After accomplishing the revision required by paragraph (h) of 
this AD, no changes may be made to Item No. 1b. in Section D, 
``Airworthiness Limitations--Life Limits,'' of the Boeing Model 787 
Airworthiness Limitations (AWLs) Document D011Z009-03-01, dated 
April 2013, unless approved as an alternative method of compliance 
(AMOC) in accordance with the procedures specified in paragraph (j) 
of this AD.

(j) Alternative Methods of Compliance (AMOCs)

    (1) The Manager, Seattle Aircraft Certification Office (ACO), 
FAA, has the authority to approve AMOCs for this AD, if requested 
using the procedures found in 14 CFR 39.19. In accordance with 14 
CFR 39.19, send your request to your principal inspector or local 
Flight Standards District Office, as appropriate. If sending 
information directly to the manager of the ACO, send it to the 
attention of the person identified in the Related Information 
section of this AD. Information may be emailed to: [email protected].
    (2) Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office.
    (3) An AMOC that provides an acceptable level of safety may be 
used for any repair required by this AD if it is approved by the 
Boeing Commercial Airplanes Organization Designation Authorization 
(ODA) that has been authorized by the Manager, Seattle ACO, to make 
those findings. For a repair method to be approved, the repair must 
meet the certification basis of the airplane, and the approval must 
specifically refer to this AD.

(k) Related Information

    For more information about this AD, contact Robert Duffer, 
Manager, Systems and Equipment Branch, ANM-130S, Seattle Aircraft 
Certification Office, FAA, 1601 Lind Avenue SW., Renton, Washington 
98057-3356; phone: (425) 917-6493; fax: (425) 917-6590; email: 
[email protected].

(l) Material Incorporated by Reference

    (1) The Director of the Federal Register approved the 
incorporation by reference (IBR) of the service information listed 
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
    (2) You must use this service information as applicable to do 
the actions required by this AD, unless the AD specifies otherwise.
    (i) Boeing Alert Service Bulletin B787-81205-SB500003-00, Issue 
001, dated April 19, 2013.
    (ii) Boeing 787 Airworthiness Limitations (AWLs) Document 
D011Z009-03-01, dated April 2013.
    (3) For Boeing service information identified in this AD, 
contact Boeing Commercial Airplanes, Attention: Data & Services 
Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; phone: 
206-544-5000, extension 1; fax: 206-766-5680; Internet: https://www.myboeingfleet.com.
    (4) You may review copies of the referenced service information 
at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., 
Renton, WA. For information on the availability of this material at 
the FAA, call 425-227-1221.
    (5) You may view this service information that is incorporated 
by reference at the National Archives and Records Administration 
(NARA). For information on the availability of this material at 
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

    Issued in Renton, Washington, on April 22, 2013.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 2013-09990 Filed 4-25-13; 8:45 am]
BILLING CODE 4910-13-P


Why this text is shown

The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-09-08T07:46:36.425640+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.

Open the captured official edition

Source SHA-256
836926165d5b4b0ef8a9f12c831585ece374e186c62bd12f78a8a9c9509f5422
Text SHA-256
25fb29d51d8c807ce1e2f255874a631d50fe41d69281b6962a5ee7ab8673005d

Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence

Coverage and limits

These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.

The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.