Published 2013-08-16 · Federal Register document 2013-18122
Airworthiness Directives; The Boeing Company Airplanes
Publication summary
We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model 727 airplanes. This AD was prompted by an evaluation by the design approval holder indicating that the frame-to- floor beam attachment is subject to widespread fatigue damage. This AD requires repetitive high frequency eddy current inspections for any crack of the frames at body station (STA) 188 through STA 344, and repair if necessary. We are issuing this AD to detect and correct fatigue cracking at the frame-to-floor beam attachment, on both the left- and right-sides, which could result in reduced structural integrity of the airplane, and decompression of the cabin.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:42.577882+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2013-a7b684f4a1b4614e
- Source row
- results[251]
- Raw source SHA-256
- a7b684f4a1b4614eef5ec9064d04a70a4701b45b0acd50058e29f235c625e705
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2013-15-15
- Effective date printed in this edition
- 2013-09-20
Read 10 complete recorded clauses
Effective Date
(a) Effective Date
This AD is effective September 20, 2013.
Exact source excerpt. Text positions 8116–8182, end exclusive, in the original decoded publication. SHA-256: 8b3d5cbc98981c4a4a70d99ff1e976a7d1fedd84be856cfc17a77b32f8d3cdf7
Affected ADs
(b) Affected ADs
None.
Exact source excerpt. Text positions 8182–8211, end exclusive, in the original decoded publication. SHA-256: 871a4afc60ceeae06e8010585055188633d616078500c45937092bfe892239c0
Applicability wording · Applicability
(c) Applicability
This AD applies to The Boeing Company Model 727, 727C, 727-100,
727-100C, 727-200, and 727-200F series airplanes, certificated in
any category, as identified in Boeing Special Attention Service
Bulletin 727-53-0234, dated January 17, 2013.
Exact source excerpt. Text positions 8211–8478, end exclusive, in the original decoded publication. SHA-256: 0d5c7e7b9bb6407308c4af2bdee15464f22cb429ac8619b618e603cf8ca97c54
Subject
(d) Subject
Joint Aircraft System Component (JASC)/Air Transport Association
(ATA) of America Code 53, Fuselage.
Exact source excerpt. Text positions 8478–8598, end exclusive, in the original decoded publication. SHA-256: 081af3d9c83e50199ea3d915af95e40eb49f717c012a8c46185298558678d959
Unsafe Condition
(e) Unsafe Condition
This AD was prompted by an evaluation by the design approval
holder indicating that the frame-to-floor beam attachment is subject
to widespread fatigue damage. We are issuing this AD to detect and
correct fatigue cracking at the frame-to-floor beam attachment, on
both the left- and right-sides, which could result in reduced
structural integrity of the airplane, and decompression of the
cabin.
Exact source excerpt. Text positions 8598–9027, end exclusive, in the original decoded publication. SHA-256: a7202e785b66f3c965b6cca1a1ab2d4fe250a822a47a997f4543062e673179d0
Compliance
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
Exact source excerpt. Text positions 9027–9129, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3
Inspection and Repair
(g) Inspection and Repair
Before the accumulation of 61,000 total flight cycles, or within
24 months after the effective date of this AD, whichever occurs
later, do a high frequency eddy current inspection for cracking of
the frames (for certain stations), in the area of the floor beam
attachments on both the left- and right-sides of the airplane, in
accordance with the Accomplishment Instructions of Boeing Special
Attention Service Bulletin 727-53-0234, dated January 17, 2013.
Repeat this inspection thereafter at intervals not to exceed 20,000
flight cycles. If any crack is found during any inspection required
by this AD, before further flight, repair the crack using a method
approved in accordance with the procedures specified in paragraph
(h) of this AD.
Exact source excerpt. Text positions 9129–9914, end exclusive, in the original decoded publication. SHA-256: debeef5970bb9db3daf251acac84f4a2d0069ee5fcf36ffdabeaa74cd8b4ca87
Alternative Methods of Compliance (AMOCs)
(h) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Seattle Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested
using the procedures found in 14 CFR 39.19. In accordance with 14
CFR 39.19, send your request to your principal inspector or local
Flight Standards District Office, as appropriate. If sending
information directly to the manager of the ACO, send it to the
attention of the person identified in the Related Information
section of this AD. Information may be emailed to: [email protected].
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair required by this AD if it is approved by the
Boeing Commercial Airplanes Organization Designation Authorization
(ODA) that has been authorized by the Manager, Seattle ACO, to make
those findings. For a repair method to be approved, the repair must
meet the certification basis of the airplane, and the approval must
specifically refer to this AD.
Exact source excerpt. Text positions 9914–11146, end exclusive, in the original decoded publication. SHA-256: fc025a7eefbf3d20e1c6bc88c250043b62eb4b012c18e31aefdd865b70556117
Related Information
(i) Related Information
For more information about this AD, contact Berhane Alazar,
Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle ACO,
1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: 425-917-
6577; fax: 425-917-6590; email: [email protected].
Exact source excerpt. Text positions 11146–11423, end exclusive, in the original decoded publication. SHA-256: 4df0671040657ca0d32cdfece696fbad31c0fd5c6be7539b72d377c1ca3157fd
Material Incorporated by Reference
(j) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Boeing Special Attention Service Bulletin 727-53-0234, dated
January 17, 2013.
[[Page 49915]]
(ii) Reserved.
(3) For Boeing service information identified in this AD,
contact Boeing Commercial Airplanes, Attention: Data & Services
Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207;
telephone 206-544-5000, extension 1; fax 206-766-5680; Internet
https://www.myboeingfleet.com.
(4) You may view this service information at FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington
98057-3356. For information on the availability of this material at
the FAA, call 425-227-1221.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Exact source excerpt. Text positions 11423–12720, end exclusive, in the original decoded publication. SHA-256: acbd7e99b0cf9dc74f664ba36a3a64117724cd54b7630a68c6def0739466b7d3
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2013-15-15 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 8afd4ea7c9294e9a33730de38947b30efdeb5a3fca25064851fe14e6bf72ee71. Source manifest: c3865e34d8bed25536d5e6492dec7872985ed40882b606a4dae27b1ba5f11631.
Official source · 2013-08-16
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 78, Number 159 (Friday, August 16, 2013)]
[Rules and Regulations]
[Pages 49913-49915]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-18122]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2013-0362; Directorate Identifier 2013-NM-030-AD;
Amendment 39-17531; AD 2013-15-15]
RIN 2120-AA64
Airworthiness Directives; The Boeing Company Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for certain
The Boeing Company Model 727 airplanes. This AD was prompted by an
evaluation by the design approval holder indicating that the frame-to-
floor beam attachment is subject to widespread fatigue damage. This AD
requires repetitive high frequency eddy current inspections for any
crack of the frames at body station (STA) 188 through STA 344, and
repair if necessary. We are issuing this AD to detect and correct
fatigue cracking at the frame-to-floor beam attachment, on both the
left- and right-sides, which could result in reduced structural
integrity of the airplane, and decompression of the cabin.
DATES: This AD is effective September 20, 2013.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in the AD as of September 20,
2013.
ADDRESSES: For service information identified in this AD, contact
Boeing Commercial Airplanes, Attention: Data & Services Management,
P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544-
5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. You may review copies of the referenced service
information at the FAA, Transport Airplane Directorate, 1601 Lind
Avenue SW., Renton, Washington 98057-3356. For information on the
availability of this material at the FAA, call 425-227-1221.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Management Facility
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The address for the
Docket Office (phone: 800-647-5527) is Document Management Facility,
U.S. Department of Transportation, Docket Operations, M-30, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE.,
Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Berhane Alazar, Aerospace Engineer,
Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office
(ACO), 1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: 425-
917-6577; fax: 425-917-6590; email: [email protected].
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to include an AD that would apply to the specified products.
The NPRM published in the Federal Register on May 3, 2013 (78 FR
25905). The NPRM proposed to require repetitive high frequency eddy
current inspections for any crack of the frames at body STA 188 through
STA 344, and repair if necessary.
Comments
We gave the public the opportunity to participate in developing
this AD. We have considered the comments received.
Boeing stated that it supports the NPRM (78 FR 25905, May 3, 2013).
Fedex stated that the NPRM (78 FR 25905, May 3, 2013) will be
effective for twenty of its Model 727-200 airplanes, the inspection
threshold and intervals will fit within its planned scheduled
maintenance checks and therefore will be no impact to available lift,
the number of man-hours and elapsed time to accomplish the inspections
will not impact the overall span-time of its planned scheduled
maintenance check, and the inspections do not require any special
inspection techniques, training, or tooling.
Conclusion
We reviewed the relevant data, considered the comments received,
and determined that air safety and the public interest require adopting
thisAD as proposed--except for minor editorial changes. We have
determined that these minor changes:
<bullet> Are consistent with the intent that was proposed in the
NPRM (78 FR 25905, May 3, 2013) for correcting the unsafe condition;
and
<bullet> Do not add any additional burden upon the public than was
already proposed in the NPRM (78 FR 25905, May 3, 2013).
[[Page 49914]]
Costs of Compliance
We estimate that this AD affects 106 airplanes of U.S. registry.
We estimate the following costs to comply with this AD:
----------------------------------------------------------------------------------------------------------------
Cost on U.S.
Action Labor cost Parts cost Cost per product operators
----------------------------------------------------------------------------------------------------------------
Inspection................ 118 work-hours x $85 $0 $10,030 per $1,063,180 per
per hour = $10,030 inspection cycle. inspection cycle.
per inspection cycle.
----------------------------------------------------------------------------------------------------------------
We have received no definitive data that would enable us to provide
cost estimates for the on-condition actions specified in this AD.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2013-15-15 The Boeing Company: Amendment 39-17531; Docket No. FAA-
2013-0362; Directorate Identifier 2013-NM-030-AD.
(a) Effective Date
This AD is effective September 20, 2013.
(b) Affected ADs
None.
(c) Applicability
This AD applies to The Boeing Company Model 727, 727C, 727-100,
727-100C, 727-200, and 727-200F series airplanes, certificated in
any category, as identified in Boeing Special Attention Service
Bulletin 727-53-0234, dated January 17, 2013.
(d) Subject
Joint Aircraft System Component (JASC)/Air Transport Association
(ATA) of America Code 53, Fuselage.
(e) Unsafe Condition
This AD was prompted by an evaluation by the design approval
holder indicating that the frame-to-floor beam attachment is subject
to widespread fatigue damage. We are issuing this AD to detect and
correct fatigue cracking at the frame-to-floor beam attachment, on
both the left- and right-sides, which could result in reduced
structural integrity of the airplane, and decompression of the
cabin.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Inspection and Repair
Before the accumulation of 61,000 total flight cycles, or within
24 months after the effective date of this AD, whichever occurs
later, do a high frequency eddy current inspection for cracking of
the frames (for certain stations), in the area of the floor beam
attachments on both the left- and right-sides of the airplane, in
accordance with the Accomplishment Instructions of Boeing Special
Attention Service Bulletin 727-53-0234, dated January 17, 2013.
Repeat this inspection thereafter at intervals not to exceed 20,000
flight cycles. If any crack is found during any inspection required
by this AD, before further flight, repair the crack using a method
approved in accordance with the procedures specified in paragraph
(h) of this AD.
(h) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Seattle Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested
using the procedures found in 14 CFR 39.19. In accordance with 14
CFR 39.19, send your request to your principal inspector or local
Flight Standards District Office, as appropriate. If sending
information directly to the manager of the ACO, send it to the
attention of the person identified in the Related Information
section of this AD. Information may be emailed to: [email protected].
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair required by this AD if it is approved by the
Boeing Commercial Airplanes Organization Designation Authorization
(ODA) that has been authorized by the Manager, Seattle ACO, to make
those findings. For a repair method to be approved, the repair must
meet the certification basis of the airplane, and the approval must
specifically refer to this AD.
(i) Related Information
For more information about this AD, contact Berhane Alazar,
Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle ACO,
1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: 425-917-
6577; fax: 425-917-6590; email: [email protected].
(j) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Boeing Special Attention Service Bulletin 727-53-0234, dated
January 17, 2013.
[[Page 49915]]
(ii) Reserved.
(3) For Boeing service information identified in this AD,
contact Boeing Commercial Airplanes, Attention: Data & Services
Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207;
telephone 206-544-5000, extension 1; fax 206-766-5680; Internet
https://www.myboeingfleet.com.
(4) You may view this service information at FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington
98057-3356. For information on the availability of this material at
the FAA, call 425-227-1221.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued in Renton, Washington, on July 21, 2013.
Stephen P. Boyd,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2013-18122 Filed 8-15-13; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T02:53:37.006286+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 7d7ca51bf71f8e3efa3845bacb9e2f9c16327c1bab106d29d8f02ef28cb4a071
- Text SHA-256
- 8afd4ea7c9294e9a33730de38947b30efdeb5a3fca25064851fe14e6bf72ee71
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.