Published 2013-09-03 · Federal Register document 2013-21109
Airworthiness Directives; Rolls-Royce plc Turbofan Engines
Publication summary
We are adopting a new airworthiness directive (AD) for certain Rolls-Royce plc (RR) RB211-524B-02; -524B2-19; -524B3-02; -524B4-02; - 524C2-19; -524D4-19; -524D4-B-19; -524D4-39; -535C-37; -535E4-37; - 535E4-B-37, and -535E4-B-75 turbofan engines, and all RB211-524G2-19; - 524G3-19; -524H2-19; and -524H-36 turbofan engines. This AD requires a one-time inspection of the front combustion liner (FCL) metering panel to determine if it is made from N75 material and, if so, replacing it with an FCL made from C263 material. This AD was prompted by the discovery of a cracked and distorted FCL metering panel, which was made from N75 material. We are issuing this AD to prevent hot gases from burning through the engine casing, which could result in an under-cowl fire and damage to the airplane.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:42.577882+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2013-a7b684f4a1b4614e
- Source row
- results[278]
- Raw source SHA-256
- a7b684f4a1b4614eef5ec9064d04a70a4701b45b0acd50058e29f235c625e705
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2013-16-23
- Effective date printed in this edition
- 2013-10-08
Read 10 complete recorded clauses
Effective Date
(a) Effective Date
This airworthiness directive (AD) becomes effective October 8,
2013.
Exact source excerpt. Text positions 17172–17267, end exclusive, in the original decoded publication. SHA-256: 79f44637b6dc35aa5cb25a1e205d5d5bca6e604ced9dbab0afc54f361f209293
Affected ADs
(b) Affected ADs
None.
Exact source excerpt. Text positions 17267–17296, end exclusive, in the original decoded publication. SHA-256: 871a4afc60ceeae06e8010585055188633d616078500c45937092bfe892239c0
Applicability wording · Applicability
(c) Applicability
This AD applies to:
(1) All Rolls-Royce plc (RR) RB211-524G2-19; -524G3-19; -524H2-
19; and -524H-36 turbofan engines;
(2) RR RB211-524B-02; -524B2-19; -524B3-02; -524B4-02; -524C2-
19; -524D4-19; -524D4-B-19; and -524D4-39 turbofan engines that have
incorporated RR Service Bulletin (SB) No. RB.211-72-7221, dated
December 7, 1984;
(3) All RR RB211-535C-37; -535E4-37; -535E4-B-37, and -535E4-B-
75 turbofan engines, except those engines that have incorporated RR
SB No. RB.211-72-C230, Revision 1, dated November 22, 2012, or
Initial Issue, dated November 16, 1999.
(4) This AD does not apply to engines listed in paragraphs
(c)(1) through (c)(3) of this AD that have installed a front
combustion liner (FCL) metering panel delivered from RR after April
23, 2007.
Exact source excerpt. Text positions 17296–18109, end exclusive, in the original decoded publication. SHA-256: d6991a45a37e32a9c8354d7975dd7e960520f192784cb35a652d6e69c2418d60
Reason
(d) Reason
This AD was prompted by the discovery of a cracked and distorted
FCL metering panel, made from N75 material. We are issuing this AD
to prevent hot gases from burning through the engine casing, which
could result in an under-cowl fire and damage to the airplane.
Exact source excerpt. Text positions 18109–18391, end exclusive, in the original decoded publication. SHA-256: 3ae183bc9c3baffe1c4b9f6a8e22826d228f9daab42186007931506e09950369
Actions and Compliance
(e) Actions and Compliance
Unless already done, do the following actions.
(1) At the next engine shop visit or within 625 flight cycles,
whichever occurs first after the effective date of this AD, perform
a one-time inspection of the FCL metering panel to determine if it
is made from N75 material, and if made from N75 material, replace it
with one made from C263 material.
(2) To inspect RR RB211-524 series turbofan engines:
(i) Use paragraph 3. of the Accomplishment Instructions of RR
Alert Non-Modification Service Bulletin (NMSB) No. RB.211-72-AG183,
Revision 3, dated December 6, 2012; or
(ii) You may use paragraph 3.B. of the Accomplishment
Instructions in RR Alert NMSB No. RB.211-72-AF572, Revision 2, dated
April 2, 2009, or Revision 1, dated October 10, 2008, or paragraph
3. of RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated December
6, 2012, for engine shop visit inspections.
(iii) You may use paragraph 3.B.(5)(p)(i) of RR Alert NMSB No.
RB.211-72-AG183, Revision 3, dated December 6, 2012, and a
spectroscopic analysis, instead of paragraphs 3.B.(3) through
3.B.(5)(p), and paragraphs 3.C.(5)(q) and (r).
(iv) You may use a local facility in the context of an FAA-
accepted maintenance or quality plan to perform the spectroscopic
analysis.
(3) To inspect RR RB211-535 series turbofan engines:
(i) Use paragraph 3. of the Accomplishment Instructions of RR
Alert NMSB No. RB.211-72-AG046, Revision 3, dated December 6, 2012;
or
(ii) You may use paragraph 3.B. of the Accomplishment
Instructions in RR Alert NMSB No. RB.211-72-AF572, Revision 2, dated
April 2, 2009, or Revision 1, dated October 10, 2008, or paragraph
3. of RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated December
6, 2012, for engine shop visit inspections.
(iii) You may use paragraph 3.C.(5)(p)(i) of RR Alert NMSB No.
RB.211-72-AG046, Revision 3, dated December 6, 2012, and a
spectroscopic analysis, instead of paragraphs 3.C.(3) through
3.C.(5)(p), and paragraph 3.C.(5)(q).
(iv) You may use a local facility to perform the spectroscopic
analysis in the context of an FAA-accepted maintenance or quality
plan.
(v) The accomplishment instructions in paragraphs
3.B.(6)(g)(iii) and 3.B.(6)(j)(i) of RR Alert NMSB No. RB.211-72-
AG046, Revision 3, dated December 6, 2012, specify use of RR tooling
for the post-inspection fuel manifold pressure test. However, you
may use locally sourced tooling in the context of an FAA-accepted
maintenance or quality plan.
Exact source excerpt. Text positions 18391–20931, end exclusive, in the original decoded publication. SHA-256: 3df6d0990c00938fb354685ab9da0ba4d2863b591fb910d23d269fc32b94a561
Credit for Previous Actions
(f) Credit for Previous Actions
(1) You have satisfied the inspection requirement of paragraph
(e) of this AD if, before the effective date of this AD, you
performed the actions prescribed in this AD using:
(i) RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated
December 6, 2012, or Revision 2, dated June 8, 2012, or Revision 1,
dated November 16, 2010, or Initial Issue, dated December 17, 2009;
or
(ii) RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated
December 6, 2012, or Revision 2, dated June 7, 2012, or Revision 1,
dated January 17, 2011, or Initial Issue, dated December 17, 2009;
or
(iii) RR Alert NMSB No. RB.211-72-AF572, Revision 2, dated April
2, 2009, or Revision 1, dated October 10, 2008, or Initial Issue,
dated October 15, 2007; or
(iv) RR Repeater Technical Variance No. 75295, Issue 1, dated
April 20, 2007.
Exact source excerpt. Text positions 20931–21799, end exclusive, in the original decoded publication. SHA-256: a8f1f85cd9a3c868237ef7d50352b15a3545783e46b6c9590a89bfea3902fe77
Definition
(g) Definition
For the purpose of this AD, a shop visit is the induction of an
engine into the shop for maintenance or overhaul. The separation of
engine flanges solely for the purposes of transporting the engine
without subsequent engine maintenance does not constitute an engine
shop visit.
Exact source excerpt. Text positions 21799–22102, end exclusive, in the original decoded publication. SHA-256: 35035e8db57b5112e808ee681a427725406f2456749a42cdebd06cc0f44d417f
Alternative Methods of Compliance (AMOCs)
(h) Alternative Methods of Compliance (AMOCs)
The Manager, Engine Certification Office, may approve AMOCs for
this AD. Use the procedures found in 14 CFR 39.19 to make your
request.
Exact source excerpt. Text positions 22102–22292, end exclusive, in the original decoded publication. SHA-256: 23eb1ba6be5c70c76a3acf4c47bf79dc0d7bd6b4bcec9c60a343d5a6501d936a
Related Information
(i) Related Information
For more information about this AD, contact Robert Green,
Aerospace Engineer, Engine Certification Office, FAA, Engine &
Propeller Directorate, 12 New England Executive Park, Burlington, MA
01803; phone: 781-238-7754; fax: 781-238 7199; email:
[email protected].
Refer to European Aviation Safety Agency AD 2012-0215R1, dated
January 4, 2013, for more information. You may examine the AD on the
Internet at http://www.regulations.gov/#!documentDetail;D=FAA-2013-
0143-0009.
Exact source excerpt. Text positions 22292–22806, end exclusive, in the original decoded publication. SHA-256: ef67e3ca94e0c9a747b755c4951c3d3b0dc07b6221fdc82f32d49781d32e3c40
Material Incorporated by Reference
(j) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Rolls-Royce plc (RR) Alert Non-Modification Service Bulletin
(NMSB) No. RB.211-72-AF572, Revision 2, dated April 2, 2009.
(ii) RR Alert NMSB No. RB.211-72-AF572, Revision 1, dated
October 10, 2008.
(iii) RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated
December 6, 2012.
(iv) RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated
December 6, 2012.
(3) For Rolls-Royce plc service information identified in this
AD, contact Rolls-Royce plc, Corporate Communications, P.O. Box 31,
Derby, England, DE248BJ; phone: 011-44-1332-242424; fax: 011-44-
1332-249936; email: http://www.rolls-royce.com/contact/civil_team.jsp; Internet: https://www.aeromanager.com.
(4) You may view this service information at FAA, Engine &
Propeller Directorate, 12 New England Executive Park, Burlington,
[[Page 54156]]
MA. For information on the availability of this material at the FAA,
call 781-238-7125.
(5) You may view this service information at the National
Archives and Records Administration (NARA). For information on the
availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Exact source excerpt. Text positions 22806–24356, end exclusive, in the original decoded publication. SHA-256: 667ebf5b5a9c767f153d03390f8cee3a22af0f518282d5b4ad166f2426ed979c
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2013-16-23 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 887d82dd5e1eacb2a6afa9dccf742d11c4470c37527bd8422f26e09fc0dddc23. Source manifest: 9e8d505e8d144869ec8f1e2021b1b3ed172293393b76abf406f7cac4bf843377.
Official source · 2013-09-03
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 78, Number 170 (Tuesday, September 3, 2013)]
[Rules and Regulations]
[Pages 54152-54156]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-21109]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2013-0143; Directorate Identifier 2013-NE-06-AD;
Amendment 39-17561; AD 2013-16-23]
RIN 2120-AA64
Airworthiness Directives; Rolls-Royce plc Turbofan Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for certain
Rolls-Royce plc (RR) RB211-524B-02; -524B2-19; -524B3-02; -524B4-02; -
524C2-19; -524D4-19; -524D4-B-19; -524D4-39; -535C-37; -535E4-37; -
535E4-B-37, and -535E4-B-75 turbofan engines, and all RB211-524G2-19; -
524G3-19; -524H2-19; and -524H-36 turbofan engines. This AD requires a
one-time inspection of the front combustion liner (FCL) metering panel
to determine if it is made from N75 material and, if so, replacing it
with an FCL made from C263 material. This AD was prompted by the
discovery of a cracked and distorted FCL metering panel, which was made
from N75 material. We are issuing this AD to prevent hot gases from
burning through the engine casing, which could result in an under-cowl
fire and damage to the airplane.
DATES: This AD becomes effective October 8, 2013.
The Director of the Federal Register approved the incorporation by
reference of certain publications listed in this AD as of October 8,
2013.
ADDRESSES: The Docket Operations office is located at Docket Management
Facility, U.S. Department of Transportation, 1200 New Jersey Avenue
SE., West Building Ground Floor, Room W12-140, Washington, DC 20590-
0001.
[[Page 54153]]
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Operations office
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the Mandatory Continuing
Airworthiness Information (MCAI), the regulatory evaluation, any
comments received, and other information. The street address for the
Docket Operations office (phone: 800-647-5527) is provided in the
ADDRESSES section. Comments will be available in the AD docket shortly
after receipt.
FOR FURTHER INFORMATION CONTACT: Robert Green, Aerospace Engineer,
Engine Certification Office, FAA, Engine & Propeller Directorate, 12
New England Executive Park, Burlington, MA 01803; phone: 781-238-7754;
fax: 781-238-7199; email: [email protected].
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to include an AD that would apply to the specified products.
The NPRM was published in the Federal Register on April 5, 2013 (78 FR
20505). The NPRM proposed to correct an unsafe condition for the
specified products. The MCAI states:
During investigation of a starting problem with an RB211-535E4-
B-37 engine, the Fuel Spray Nozzles (FSNs) appeared misaligned and
the engine was removed. Further investigation found that the FSNs
were correctly positioned but that the Front Combustion Liner (FCL)
metering panel (reference Engine Illustrated Parts Catalogue (EIPC)
section 72-41-13, Figure/Item 02-324) was cracked and distorted.
Laboratory investigation revealed that the FCL metering panel was
made of N75 material rather than the specified C263 material.
Rolls-Royce (RR) issued SB RB.211-72-7221 in 1984, to address
the issue of cracking of FCL metering panels manufactured in N75
material. SB RB.211-72-7221 replaces the FCL metering panel
manufactured in N75 material with one manufactured in C263 material.
The FCL metering panel in so-called Phase 2 combustors of the RB211-
524G/H and RB211-535C/E4/E4-B series engines was specified in C263
material from engine type at entry into service.
Based on these findings, it was determined that installation of
N75 material FCL metering panels on an engine where C263 was the
intended material may result in metering panel cracking and
distortion.
Comments
We gave the public the opportunity to participate in developing
this AD. We considered the comments received.
Request To Correct an Applicability Date
American Airlines (AAL) requested that we correct a date cited in
paragraph (c)(4)(i) of the NPRM (78 FR 20505, April 5, 2013) used to
determine the affected engines. The NPRM states that combustion liners
supplied by RR after April 23, 2011 are not affected by this AD,
whereas RR Alert Non-Modification Service Bulletin (NMSB) No. RB.211-
72-AG046, Revision 3, dated December 6, 2012, and RR Alert NMSB No.
RB.211-72-AF572, Revision 2, dated April 2, 2009, cite the correct date
as April 23, 2007.
We agree. We changed the date. Paragraph (c)(4) of this AD now
states that combustion liners supplied by RR after April 23, 2007, are
not affected by this AD.
Request To Allow Alternative Inspection Method During Engine Shop
Visits
AAL and Texas Aero Engine Services, LLC (TAESL) requested that we
allow using RR Alert NMSB No. RB.211-72-AF572, Revision 2, dated April
2, 2009, as a means to comply with the FCL inspections. AAL indicated
that the Alert NMSB defines an inspection equivalent to that in the AD,
which therefore should allow using the NMSB at the shop level. In
addition, TAESL requested that we allow using Revision 1, Revision 2,
or later revisions of RR Alert NMSB No.RB.211-72-AF572 to comply with
the AD.
We partially agree. We agree that RR Alert NMSB No. RB.211-72-
AF572, Revision 2, dated April 2, 2009, or Revision 1, dated October
10, 2008, provide an acceptable inspection. We changed the AD to add RR
Alert NMSB No. RB.211-72-AF572, Revision 2, dated April 2, 2009, and
Revision 1, dated October 10, 2008, to the compliance paragraph, by
adding paragraphs (e)(2)(ii) and (e)(3)(ii).
New paragraph (e)(2)(ii) states: ``You may use paragraph 3.B. of
the Accomplishment Instructions in RR Alert NMSB No. RB.211-72-AF572,
Revision 2, dated April 2, 2009, or Revision 1, dated October 10, 2008,
or paragraph 3. of RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated
December 6, 2012, for engine shop visit inspections.''
New paragraph (e)(3)(ii) states: ``You may use paragraph 3.B. of
the Accomplishment Instructions in RR Alert NMSB No. RB.211-72-AF572,
Revision 2, dated April 2, 2009, or Revision 1, dated October 10, 2008,
or paragraph 3. of RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated
December 6, 2012, for engine shop visit inspections.''
We disagree with including possible future versions of the Alert
NMSB because what future versions may contain is speculation. We did
not change the AD.
Request To Use Spectroscopic Analysis To Determine if the FCL Metering
Panel Is Made From N75 Material
AAL requested that we allow an alternate procedure to obtain and
analyze the FCL material. RR Alert NMSB No. RB.211-72-AG046, Revision
3, dated December 6, 2012, requires the use of an alloy sorter to
identify the FCL material as either C263 or N75. If the sorter
identifies the material as N75, the Alert NMSB requires that a sample
be provided to RR for confirmation by spectroscopic analysis. AAL
proposed an alternate procedure be accepted to obtain and analyze a
sample of material from the FCL in accordance with RB.211-72-AG046,
paragraph 3.(B).5.(p)(i) for all inspections instead of using the alloy
sorter as a preliminary step. The alternative procedure includes the
use of a local laboratory for the spectroscopic analysis.
We agree. Paragraph 3.(B).5.(p)(i) identifies, among other things,
how to obtain the sample. AAL's alternate process uses paragraph
3.(B).5.(p)(i) to obtain the sample. AAL's proposed follow-on analysis
is simpler as it avoids use of the alloy sorter. However, spectroscopic
analysis then becomes required. The analysis need not be limited to RR
facilities, but can be conducted locally in the context of an FAA-
accepted maintenance or quality plan.
We changed the AD by adding paragraphs (e)(2)(iii) and (e)(2)(iv),
and also (e)(3)(iii) and (e)(3)(iv).
New paragraph (e)(2)(iii) states: ``You may use paragraph
3.B.(5)(p)(i) of RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated
December 6, 2012, and a spectroscopic analysis, instead of paragraphs
3.B.(3) through 3.B.(5)(p) and paragraphs 3.C.(5)(q) and (r).''
New paragraph (e)(3)(iii) states: ``You may use paragraph
3.C.(5)(p)(i) of RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated
December 6, 2012, and a spectroscopic analysis, instead of paragraphs
3.C.(3) through 3.C.(5)(p), and paragraph 3.C.(5)(q).''
New paragraphs (e)(2)(iv) and (e)(3)(iv) state: ``You may use a
local facility in the context of an FAA-accepted maintenance or quality
plan to perform the spectroscopic analysis.''
[[Page 54154]]
Request To Substitute Locally Sourced Tools To Conduct Pressure Test
AAL requested that we allow the use of a locally sourced pressure
test adaptor and pressure gauge in place of tools specified by part
number in RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated December
6, 2012.
We agree. Locally sourced tooling approved under an FAA-accepted
maintenance or quality plan is acceptable for use. We changed the AD by
adding paragraph (e)(3)(v) which states: ``The accomplishment
instructions in paragraphs 3.B.(6)(g)(iii) and 3.B.(6)(j)(i) of RR
Alert NMSB No. RB.211-72-AG046, Revision 3, dated December 6, 2012,
specify use of RR tooling for the post-inspection fuel manifold
pressure test. However, you may use locally sourced tooling in the
context of an FAA-accepted maintenance or quality plan.''
Request To Be Less Precise in References to NMSB Revision Numbers
TAESL requested that we not specify use of RR Alert NMSB No.
RB.211-72-AG046, Revision 3, dated December 6, 2012, for the
inspection, and that we either remove the revision number or add the
words ``or later revision'' because service bulletins can be revised
frequently. Similarly, TAESL requested that in paragraph (c)(ii),
Applicability, we change the reference to RR Alert NMSB No. RB.211-72-
AF572 to say ``Revision 1 or 2, or later revision.''
We partially agree.
We agree that RR Alert NMSB No. RB.211-72-AF572, Revision 2, dated
April 2, 2009, and Revision 1, dated October 10, 2008, and Initial
Issue, dated October 15, 2007 are acceptable inspections for prior
compliance. We changed the AD by adding paragraph (f), Credit for
Previous Actions.
New paragraph (f) states: ``(1) You have satisfied the inspection
requirement of paragraph (e) of this AD if, before the effective date
of this AD, you performed the actions prescribed in this AD using: (i)
RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated December 6, 2012,
or Revision 2, dated June 8, 2012, or Revision 1, dated November 16,
2010, or Initial Issue, dated December 17, 2009; or (ii) RR Alert NMSB
No. RB.211-72-AG046, Revision 3, dated December 6, 2012, or Revision 2,
dated June 7, 2012, or Revision 1, dated January 17, 2011, or Initial
Issue, dated December 17, 2009; or (iii) RR Alert NMSB No. RB.211-72-
AF572, Revision 2, dated April 2, 2009, or Revision 1, dated October
10, 2008, or Initial Issue, dated October 15, 2007; or (iv) RR Repeater
Technical Variance No. 75295, Issue 1, dated April 20, 2007.''
We disagree with including possible future versions of the Alert
NMSB because what future versions may contain is speculation. We did
not change the AD.
Request To Replace Flight Cycle Requirement With Compliance at Next
Shop Visit
UPS requested that we remove from compliance the flight cycle
requirement and instead require compliance at the next shop visit. UPS
has completed inspection of 67 of 89 affected engines, with no
findings. The remaining engines are locked in specific geographic areas
that do not afford favorable opportunities to accomplish material
verification. UPS believes the risk of finding a combustion liner
metering panel fabricated of N75 material is low.
We disagree. The RR risk assessment that we reviewed estimates 25
field findings. There have been seven findings to date, leaving 18
potential additional findings. The cyclic compliance requirement,
average fleet utilization, and alternative inspection methods provide
adequate ability to manage remaining inspections in a timely manner
during scheduled maintenance opportunities. We did not change the AD.
Request To Lower the Estimated Costs of Compliance
AAL requested that we lower, based on the inspection results to
date, our estimate of costs of compliance. The NPRM (78 FR 20505, April
5, 2013) estimates that 315 engines of U.S. registry are affected, and
that 12 engines will test positive for N75. AAL believes that this
estimate is too high.
AAL stated that, to date, 770 engines of the worldwide fleet have
been inspected using RR NMSB No. RB.211-72-AF572 and RB.211-72-AG046.
Two engines were confirmed to have an N75 material FCL metering panel
in the shop using RB.211-72-AF572 and one was the original event
engine. No engines with confirmed FCL metering panel with N75 material
have been found in the worldwide fleet using RR NMSB No. RB.211-72-
AG046.
We disagree. As of March 15, 2013, we are aware of seven findings--
the known failure of one engine, two findings for new productions
engines, and four findings for engines inspected in the field. We did
not change the AD.
Conclusion
We reviewed the available data, including the comments received,
and determined that air safety and the public interest require adopting
this AD with the changes described previously. We determined that these
changes will not increase the economic burden on any operator or
increase the scope of this AD.
Costs of Compliance
We estimate that this AD will affect about 315 RR RB211-524 and
RB211-535 turbofan engines installed on airplanes of U.S. registry. We
also estimate that it will take about 11 hours per engine to comply
with this AD. The average labor rate is $85 per hour. Required parts
will cost about $108,887 per engine. We anticipate that 12 FCL metering
panels will fail inspection. Based on these figures, we estimate the
cost of the AD on U.S. operators to be $1,601,169.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We determined that this AD will not have federalism implications
under Executive Order 13132. This AD will not have a substantial direct
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government.
For the reasons discussed above, I certify this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska to the extent
that it justifies making a regulatory distinction, and
[[Page 54155]]
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to
comply with this AD and placed it in the AD docket.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new AD:
2013-16-23 Rolls-Royce plc: Amendment 39-17561; Docket No. FAA-2013-
0143; Directorate Identifier 2013-NE-06-AD.
(a) Effective Date
This airworthiness directive (AD) becomes effective October 8,
2013.
(b) Affected ADs
None.
(c) Applicability
This AD applies to:
(1) All Rolls-Royce plc (RR) RB211-524G2-19; -524G3-19; -524H2-
19; and -524H-36 turbofan engines;
(2) RR RB211-524B-02; -524B2-19; -524B3-02; -524B4-02; -524C2-
19; -524D4-19; -524D4-B-19; and -524D4-39 turbofan engines that have
incorporated RR Service Bulletin (SB) No. RB.211-72-7221, dated
December 7, 1984;
(3) All RR RB211-535C-37; -535E4-37; -535E4-B-37, and -535E4-B-
75 turbofan engines, except those engines that have incorporated RR
SB No. RB.211-72-C230, Revision 1, dated November 22, 2012, or
Initial Issue, dated November 16, 1999.
(4) This AD does not apply to engines listed in paragraphs
(c)(1) through (c)(3) of this AD that have installed a front
combustion liner (FCL) metering panel delivered from RR after April
23, 2007.
(d) Reason
This AD was prompted by the discovery of a cracked and distorted
FCL metering panel, made from N75 material. We are issuing this AD
to prevent hot gases from burning through the engine casing, which
could result in an under-cowl fire and damage to the airplane.
(e) Actions and Compliance
Unless already done, do the following actions.
(1) At the next engine shop visit or within 625 flight cycles,
whichever occurs first after the effective date of this AD, perform
a one-time inspection of the FCL metering panel to determine if it
is made from N75 material, and if made from N75 material, replace it
with one made from C263 material.
(2) To inspect RR RB211-524 series turbofan engines:
(i) Use paragraph 3. of the Accomplishment Instructions of RR
Alert Non-Modification Service Bulletin (NMSB) No. RB.211-72-AG183,
Revision 3, dated December 6, 2012; or
(ii) You may use paragraph 3.B. of the Accomplishment
Instructions in RR Alert NMSB No. RB.211-72-AF572, Revision 2, dated
April 2, 2009, or Revision 1, dated October 10, 2008, or paragraph
3. of RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated December
6, 2012, for engine shop visit inspections.
(iii) You may use paragraph 3.B.(5)(p)(i) of RR Alert NMSB No.
RB.211-72-AG183, Revision 3, dated December 6, 2012, and a
spectroscopic analysis, instead of paragraphs 3.B.(3) through
3.B.(5)(p), and paragraphs 3.C.(5)(q) and (r).
(iv) You may use a local facility in the context of an FAA-
accepted maintenance or quality plan to perform the spectroscopic
analysis.
(3) To inspect RR RB211-535 series turbofan engines:
(i) Use paragraph 3. of the Accomplishment Instructions of RR
Alert NMSB No. RB.211-72-AG046, Revision 3, dated December 6, 2012;
or
(ii) You may use paragraph 3.B. of the Accomplishment
Instructions in RR Alert NMSB No. RB.211-72-AF572, Revision 2, dated
April 2, 2009, or Revision 1, dated October 10, 2008, or paragraph
3. of RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated December
6, 2012, for engine shop visit inspections.
(iii) You may use paragraph 3.C.(5)(p)(i) of RR Alert NMSB No.
RB.211-72-AG046, Revision 3, dated December 6, 2012, and a
spectroscopic analysis, instead of paragraphs 3.C.(3) through
3.C.(5)(p), and paragraph 3.C.(5)(q).
(iv) You may use a local facility to perform the spectroscopic
analysis in the context of an FAA-accepted maintenance or quality
plan.
(v) The accomplishment instructions in paragraphs
3.B.(6)(g)(iii) and 3.B.(6)(j)(i) of RR Alert NMSB No. RB.211-72-
AG046, Revision 3, dated December 6, 2012, specify use of RR tooling
for the post-inspection fuel manifold pressure test. However, you
may use locally sourced tooling in the context of an FAA-accepted
maintenance or quality plan.
(f) Credit for Previous Actions
(1) You have satisfied the inspection requirement of paragraph
(e) of this AD if, before the effective date of this AD, you
performed the actions prescribed in this AD using:
(i) RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated
December 6, 2012, or Revision 2, dated June 8, 2012, or Revision 1,
dated November 16, 2010, or Initial Issue, dated December 17, 2009;
or
(ii) RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated
December 6, 2012, or Revision 2, dated June 7, 2012, or Revision 1,
dated January 17, 2011, or Initial Issue, dated December 17, 2009;
or
(iii) RR Alert NMSB No. RB.211-72-AF572, Revision 2, dated April
2, 2009, or Revision 1, dated October 10, 2008, or Initial Issue,
dated October 15, 2007; or
(iv) RR Repeater Technical Variance No. 75295, Issue 1, dated
April 20, 2007.
(g) Definition
For the purpose of this AD, a shop visit is the induction of an
engine into the shop for maintenance or overhaul. The separation of
engine flanges solely for the purposes of transporting the engine
without subsequent engine maintenance does not constitute an engine
shop visit.
(h) Alternative Methods of Compliance (AMOCs)
The Manager, Engine Certification Office, may approve AMOCs for
this AD. Use the procedures found in 14 CFR 39.19 to make your
request.
(i) Related Information
For more information about this AD, contact Robert Green,
Aerospace Engineer, Engine Certification Office, FAA, Engine &
Propeller Directorate, 12 New England Executive Park, Burlington, MA
01803; phone: 781-238-7754; fax: 781-238 7199; email:
[email protected].
Refer to European Aviation Safety Agency AD 2012-0215R1, dated
January 4, 2013, for more information. You may examine the AD on the
Internet at http://www.regulations.gov/#!documentDetail;D=FAA-2013-
0143-0009.
(j) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Rolls-Royce plc (RR) Alert Non-Modification Service Bulletin
(NMSB) No. RB.211-72-AF572, Revision 2, dated April 2, 2009.
(ii) RR Alert NMSB No. RB.211-72-AF572, Revision 1, dated
October 10, 2008.
(iii) RR Alert NMSB No. RB.211-72-AG183, Revision 3, dated
December 6, 2012.
(iv) RR Alert NMSB No. RB.211-72-AG046, Revision 3, dated
December 6, 2012.
(3) For Rolls-Royce plc service information identified in this
AD, contact Rolls-Royce plc, Corporate Communications, P.O. Box 31,
Derby, England, DE248BJ; phone: 011-44-1332-242424; fax: 011-44-
1332-249936; email: http://www.rolls-royce.com/contact/civil_team.jsp; Internet: https://www.aeromanager.com.
(4) You may view this service information at FAA, Engine &
Propeller Directorate, 12 New England Executive Park, Burlington,
[[Page 54156]]
MA. For information on the availability of this material at the FAA,
call 781-238-7125.
(5) You may view this service information at the National
Archives and Records Administration (NARA). For information on the
availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued in Burlington, Massachusetts, on August 7, 2013.
Colleen M. D'Alessandro,
Assistant Manager, Engine & Propeller Directorate, Aircraft
Certification Service.
[FR Doc. 2013-21109 Filed 8-30-13; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T02:53:08.511687+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 016fde909c33c22e0e1cbf604a90abf9b5339285a354294f32506163f68c4f8d
- Text SHA-256
- 887d82dd5e1eacb2a6afa9dccf742d11c4470c37527bd8422f26e09fc0dddc23
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.