Airworthiness Directives; BAE Systems (Operations) Limited Airplanes
Publication summary
We are adopting a new airworthiness directive (AD) for all BAE Systems (Operations) Limited Model 4101 airplanes. This AD was prompted by a report of the failure, due to overheat, of a bracket on which the earth post (EP) for the generator and propeller de-ice systems is located. This AD requires an inspection of the affected EPs and attachment structure for damage, an inspection of the earth cables of the generator and propeller de-ice system for signs of overheating and arcing damage, a torque check of the affected EP stiff nuts, an electrical high current bonding check of the bracket, and corrective actions if necessary. We are issuing this AD to detect and correct an overheat failure of the EPs for the generator and propeller de-ice system, and possible degradation of the wing front spar cap and/or web, which could affect the structural integrity of the wing.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:48.517946+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2015-3bb842c840a7e6e6
- Source row
- results[73]
- Raw source SHA-256
- 3bb842c840a7e6e6e43779ca68008e1e63ad8287ad840c3a981d1f66a934b14b
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2015-06-06
- Effective date printed in this edition
- 2015-05-04
Read 15 complete recorded clauses
Effective Date
(a) Effective Date
This AD becomes effective May 4, 2015.
Exact source excerpt. Text positions 12182–12246, end exclusive, in the original decoded publication. SHA-256: e5c08bf029e5c36cdfbbc92ddc4a32974df5161353c76b239568c18602c4ef0e
Affected ADs
(b) Affected ADs
None.
Exact source excerpt. Text positions 12246–12275, end exclusive, in the original decoded publication. SHA-256: 871a4afc60ceeae06e8010585055188633d616078500c45937092bfe892239c0
Applicability wording · Applicability
(c) Applicability
This AD applies to BAE Systems (Operations) Limited Model 4101
airplanes, certificated in any category, all serial numbers.
Exact source excerpt. Text positions 12275–12424, end exclusive, in the original decoded publication. SHA-256: 3133ddc07cb2e81b0bca767a7e9b41c856f25938e2112984d9faa762991ec35d
Subject
(d) Subject
Air Transport Association (ATA) of America Code 24, Electrical
Power.
Exact source excerpt. Text positions 12424–12513, end exclusive, in the original decoded publication. SHA-256: 2f211054234f9b656c228d5ed94963145e66d980d580552d614fd425d6f5b15a
Reason
(e) Reason
This AD was prompted by a report of the failure, due to
overheat, of a bracket on which the earth post (EP) for the
generator and propeller de-ice systems is located. We are issuing
this AD to detect and correct an overheat failure of the EPs for the
generator and propeller de-ice system and possible degradation of
the wing front spar cap and/or web, which could affect the
structural integrity of the wing.
Exact source excerpt. Text positions 12513–12946, end exclusive, in the original decoded publication. SHA-256: f4c5ea5aa81f2291682099a42acb67454f0719e1cc9c08fb3cb9b768f475f219
Compliance
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
Exact source excerpt. Text positions 12946–13048, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3
Inspection of the Earth Posts and Attachment Structure and Corrective Action
(g) Inspection of the Earth Posts and Attachment Structure and
Corrective Action
Within 6 months after the effective date of this AD: Do a
general visual inspection on both engines of the structure around
EP2 and EP4; the brackets on which the EPs are mounted; the
attachment of the nacelle horizontal support for damage, and lateral
movement of the EPs; in accordance with the Accomplishment
Instructions of BAE Systems (Operations) Limited Inspection Service
Bulletin J41-24-043, Revision 3, dated June 16, 2014. If any lateral
movement of the EP or any other damage is detected, before further
flight, repair using a method approved by the Manager, International
Branch, ANM-116, Transport Airplane Directorate, FAA; or the
European Aviation Safety Agency (EASA); or BAE Systems (Operations)
Limited's EASA Design Organization Approval (DOA).
Exact source excerpt. Text positions 13048–13912, end exclusive, in the original decoded publication. SHA-256: 88f9bddf96041b2020bcdfb66dbfefd7f63ec66df98ff0455bff22789276c8e7
Inspection of the Earth Cables and Corrective Action
(h) Inspection of the Earth Cables and Corrective Action
Within 6 months after the effective date of this AD: Do a
general visual inspection of the earth cables of the generator and
propeller de-ice system for arcing damage and signs that the cable
insulation or terminal tags have been overheated, and do all
applicable corrective actions; in accordance with the Accomplishment
Instructions of BAE Systems (Operations) Limited Inspection Service
Bulletin J41-24-043, Revision 3, dated June 16, 2014. Do all
applicable corrective actions before further flight.
Exact source excerpt. Text positions 13912–14486, end exclusive, in the original decoded publication. SHA-256: 3ca46401429d2913cff6a29991a31045da96f1c15028943662e83796902ac947
Torque Check of the Earth Post Stiff Nuts
(i) Torque Check of the Earth Post Stiff Nuts
Within 6 months after the effective date of this AD: Do a torque
check of the EP2 and EP4 stiff nuts, and adjust the torque load as
applicable, in accordance with the Accomplishment Instructions of
BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-
043, Revision 3, dated June 16, 2014.
Exact source excerpt. Text positions 14486–14846, end exclusive, in the original decoded publication. SHA-256: 338f146b4434c62d7a875fc42d67668951362c58db1eeb2c81d030337d5a4d3d
Resistance Measurement of the EP2 and EP4 Earth Bolts
(j) Resistance Measurement of the EP2 and EP4 Earth Bolts
Within 6 months after the effective date of this AD: Measure the
resistance of the EP2 and EP4 earth bolts using a high-current
millivolts-drop test, and do all applicable corrective actions, in
accordance with the Accomplishment Instructions of BAE Systems
(Operations) Limited Inspection Service Bulletin J41-24-043,
Revision 3, dated June 16, 2014. Do all applicable corrective
actions before further flight.
Exact source excerpt. Text positions 14846–15328, end exclusive, in the original decoded publication. SHA-256: c6b1e6cf37ef847464ab9bae9f3a0729fa8e0eeb0a35725e2919ac0b1c9fea4a
No Reporting Required
(k) No Reporting Required
Although BAE Systems (Operations) Limited Inspection Service
Bulletin J41-24-043, Revision 3, dated June 16, 2014, specifies to
submit information to the manufacturer, this AD does not require
that this information be submitted.
Exact source excerpt. Text positions 15328–15592, end exclusive, in the original decoded publication. SHA-256: 3c0b92b7099c6b42673447888f60eeaf858d23cbec2c9d405caf8cd099a747c7
Credit for Previous Actions
(l) Credit for Previous Actions
This paragraph provides credit for actions required by
paragraphs (g), (h), (i), and (j) of this AD, if those actions were
performed before the effective date of this AD using a service
bulletin specified in paragraph (l)(1), (l)(2), or (l)(3) of this
AD, which are not incorporated by reference in this AD.
(1) BAE Systems (Operations) Limited Inspection Service Bulletin
J41-24-043, dated September 27, 2011.
(2) BAE Systems (Operations) Limited Inspection Service Bulletin
J41-24-043, Revision 1, dated January 16, 2012.
(3) BAE Systems (Operations) Limited Inspection Service Bulletin
J41-24-043, Revision 2, dated August 21, 2013.
Exact source excerpt. Text positions 15592–16285, end exclusive, in the original decoded publication. SHA-256: ea03ef1ec6a88e5efc56d338cf2d4d901a5f584766c70dca244e485d04a2561e
Other FAA AD Provisions
(m) Other FAA AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
has the authority to approve AMOCs for this AD, if requested using
the procedures found in 14 CFR 39.19. In accordance with 14 CFR
39.19, send your request to your principal inspector or local Flight
Standards District Office, as appropriate. If sending information
directly to the International Branch, send it to ATTN: Todd
Thompson, Aerospace Engineer, International Branch, ANM-116,
Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton,
WA 98057-3356; telephone 425-227-1175; fax 425-227-1149. Information
may be emailed to: [email protected]. Before using any
approved AMOC, notify your appropriate principal inspector, or
lacking a principal inspector, the manager of the local flight
standards district office/certificate holding district office. The
AMOC approval letter must specifically reference this AD.
(2) Contacting the Manufacturer: For any requirement in this AD
to obtain corrective actions from a manufacturer, the action must be
accomplished using a method approved by the Manager, International
Branch, ANM-116, Transport Airplane Directorate, FAA; or the
European Aviation Safety Agency (EASA); or BAE Systems (Operations)
Limited's EASA Design Organization Approval (DOA). If approved by
the DOA, the approval must include the DOA-authorized signature.
Exact source excerpt. Text positions 16285–17812, end exclusive, in the original decoded publication. SHA-256: effe6ad4d3be33b49263e1051756b2d716c9bb7701498476f16264d6fefe41fe
Related Information
(n) Related Information
(1) Refer to Mandatory Continuing Airworthiness Information
(MCAI) European Aviation Safety Agency Airworthiness Directive 2014-
0006, dated January 7, 2014, for related information. This MCAI may
be found in the AD docket on the Internet at http://www.regulations.gov/#!documentDetail;D=FAA-2014-0619-0002.
(2) Service information identified in this AD that is not
incorporated by reference is available at the addresses specified in
paragraphs (o)(3) and (o)(4) of this AD.
Exact source excerpt. Text positions 17812–18326, end exclusive, in the original decoded publication. SHA-256: 5beb708d15def5bad7d8064167a205a92d2ded4aa7c611b63e1d8ec97d608477
Material Incorporated by Reference
(o) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(i) BAE Systems (Operations) Limited Inspection Service Bulletin
J41-24-043, Revision 3, dated June 16, 2014.
(ii) Reserved.
(3) For service information identified in this AD, contact BAE
Systems (Operations) Limited, Customer Information Department,
Prestwick International Airport, Ayrshire, KA9 2RW, Scotland, United
Kingdom; telephone +44 1292 675207; fax +44 1292 675704; email
[email protected]; Internet http://www.baesystems.com/Businesses/RegionalAircraft/index.htm.
(4) You may view this service information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For
information on the availability of this material at the FAA, call
425-227-1221.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Exact source excerpt. Text positions 18326–19692, end exclusive, in the original decoded publication. SHA-256: 1a80864612044e4b9e9363f1d32e287965cf8ace52a0a3a51f0dd22fd54ad8d5
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2015-06-06 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: dbc46fbc7e14f8208525eeb64a72724fa686c46fd8c2492f18a8fb30a30c5b99. Source manifest: 5566ac36803f159e6c6cc048621fcd42956e52ce378109ee4169ecffac60b54f.
Official source · 2015-03-30
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 80, Number 60 (Monday, March 30, 2015)]
[Rules and Regulations]
[Pages 16555-16557]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-06751]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2014-0619; Directorate Identifier 2014-NM-029-AD;
Amendment 39-18124; AD 2015-06-06]
RIN 2120-AA64
Airworthiness Directives; BAE Systems (Operations) Limited
Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for all BAE
Systems (Operations) Limited Model 4101 airplanes. This AD was prompted
by a report of the failure, due to overheat, of a bracket on which the
earth post (EP) for the generator and propeller de-ice systems is
located. This AD requires an inspection of the affected EPs and
attachment structure for damage, an inspection of the earth cables of
the generator and propeller de-ice system for signs of overheating and
arcing damage, a torque check of the affected EP stiff nuts, an
electrical high current bonding check of the bracket, and corrective
actions if necessary. We are issuing this AD to detect and correct an
overheat failure of the EPs for the generator and propeller de-ice
system, and possible degradation of the wing front spar cap and/or web,
which could affect the structural integrity of the wing.
DATES: This AD becomes effective May 4, 2015.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of May 4, 2015.
ADDRESSES: You may examine the AD docket on the Internet at http://www.regulations.gov/#!docketDetail;D=FAA-2014-0619 or in person at the
Docket Management Facility, U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE., Washington, DC.
For service information identified in this AD, contact BAE Systems
(Operations) Limited, Customer Information Department, Prestwick
International Airport, Ayrshire, KA9 2RW, Scotland, United Kingdom;
telephone +44 1292 675207; fax +44 1292 675704; email
[email protected]; Internet http://www.baesystems.com/Businesses/RegionalAircraft/index.htm. You may view this referenced
service information at the FAA, Transport Airplane Directorate, 1601
Lind Avenue SW., Renton, WA. For information on the availability of
this material at the FAA, call 425-227-1221. It is also available on
the Internet at http://www.regulations.gov by searching for and
locating Docket No. FAA 2014-0619.
FOR FURTHER INFORMATION CONTACT: Todd Thompson, Aerospace Engineer,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
1601 Lind Avenue SW., Renton, WA 98057-3356; telephone 425-227-1175;
fax 425-227-1149.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 by adding an AD that would apply to all BAE Systems
(Operations) Limited Model 4101 airplanes. The NPRM published in the
Federal Register on September 3, 2014 (79 FR 52270). The NPRM was
prompted by a report of the failure, due to overheat, of a bracket on
which the EP for the generator and propeller de-ice systems is located.
The NPRM proposed to require an inspection of the affected EPs and
attachment structure for damage, an inspection of the earth cables of
the generator and propeller de-ice system for signs of overheating and
arcing damage, a torque check of the affected EP stiff nuts, an
electrical high current bonding check of the bracket, and corrective
actions if necessary. We are issuing this AD to detect and correct an
overheat failure of the EPs for the generator and propeller de-ice
system, and possible degradation of the wing front spar cap and/or web,
which could affect the structural integrity of the wing.
The European Aviation Safety Agency (EASA), which is the Technical
Agent for the Member States of the European Union, has issued EASA
Airworthiness Directive 2014-0006, dated January 7, 2014 (referred to
after this as the Mandatory Continuing Airworthiness Information, or
``the MCAI''), to correct an unsafe condition. The MCAI states:
An occurrence was reported involving a Jetstream 4100 aeroplane,
where a bracket, on which the earth post for the generator and
propeller de-ice systems is located, failed due to overheat.
Although the earth post and cables were not damaged, the mounting
bracket and underlying structure were damaged to the extent that
repair of the wing front spar web was necessary. Furthermore, the
aft engine cross support rod, which is attached to the same bracket,
was found damaged, as a result of excessive current
[[Page 16556]]
load, and required replacement. The subsequent investigation
determined that, due to the damage tolerance of the aft engine cross
rod support, the rod does not present an airworthiness issue.
However, as a consequence of overheat failure of the earth post,
degradation of the wing front spar cap and/or web could affect the
structural integrity of the wing.
This condition, if not detected and corrected, could reduce the
capacity of the wing to support loads, possibly resulting in wing
structure failure and consequent loss of the aeroplane.
To address this potential unsafe condition, BAE Systems
(Operations) Ltd issued [Inspection] Service Bulletin (SB) J41-24-
043 [Revision 2, dated August 21, 2013] to provide inspection
instructions.
For the reasons described above, this [EASA] AD requires a one-
time visual inspection of the affected earth posts, an electrical
high current bonding check of the bracket and, if discrepancies are
detected, accomplishment of applicable corrective action(s).
The required actions include a general visual inspection of the
affected EPs and attachment structure for damage; a general visual
inspection of the earth cables of the generator and propeller de-ice
system for arcing damage and signs of overheating of the cable
insulation and terminal tags; a torque check of the EP2 and EP4 stiff
nuts; an electrical high current bonding check of the bracket; and
corrective actions if necessary. Corrective actions include repair of
damaged structure, replacement of damaged cables, cleaning of all
applicable surfaces to achieve the necessary resistance value, and
correction of the torque load of EP stiff nuts.
You may examine the MCAI in the AD docket on the Internet at http://www.regulations.gov/#!documentDetail;D=FAA-2014-0619-0002.
Comments
We gave the public the opportunity to participate in developing
this AD. We received no comments on the NPRM (79 FR 52270, September 3,
2014) or on the determination of the cost to the public.
Changes Made to This AD
BAE Systems (Operations) Limited has issued Inspection Service
Bulletin J41-24-043, Revision 3, dated June 16, 2014. This service
bulletin states that ``this revision does not require rework of the
modification(s) embodied by earlier revision of this service
bulletin.'' We have revised paragraphs (g) through (k) of this AD to
reference this service information. We have revised paragraph (l) of
this AD to give credit for actions done prior to the effective date of
this AD using BAE Systems (Operations) Limited Inspection Service
Bulletin J41-24-043, Revision 2, dated August 21, 2013.
Conclusion
We reviewed the relevant data, and determined that air safety and
the public interest require adopting this AD with the changes described
previously and minor editorial changes. We have determined that these
minor changes:
<bullet> Are consistent with the intent that was proposed in the
NPRM (79 FR 52270, September 3, 2014) for correcting the unsafe
condition; and
<bullet> Do not add any additional burden upon the public than was
already proposed in the NPRM (79 FR 52270, September 3, 2014).
We also determined that these changes will not increase the
economic burden on any operator or increase the scope of this AD.
Related Service Information Under 1 CFR Part 51
We reviewed BAE Systems (Operations) Limited Service Bulletin J41-
24-043, Revision 3, dated June 16, 2014. The service information
describes procedures for an inspection of the earth post EP2 (left) and
earth post EP4 (right) on the structure for the left and right power
plants. This service information is reasonably available; see ADDRESSES
for ways to access this service information.
Costs of Compliance
We estimate that this AD affects 4 airplanes of U.S. registry.
We also estimate that it would take about 4 work-hours per product
to comply with the basic requirements of this AD. The average labor
rate is $85 per work-hour. Based on these figures, we estimate the cost
of this proposed AD on U.S. operators to be $1,360, or $340 per
product.
We have received no definitive data that would enable us to provide
cost estimates for the on-condition actions specified in this AD.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We determined that this AD will not have federalism implications
under Executive Order 13132. This AD will not have a substantial direct
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
1. Is not a ``significant regulatory action'' under Executive Order
12866;
2. Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979);
3. Will not affect intrastate aviation in Alaska; and
4. Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov/#!docketDetail;D=FAA-2014-0619; or in person at the
Docket Management Facility between 9 a.m. and 5 p.m., Monday through
Friday, except Federal holidays. The AD docket contains this AD, the
regulatory evaluation, any comments received, and other information.
The street address for the Docket Operations office (telephone 800-647-
5527) is in the ADDRESSES section.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
[[Page 16557]]
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2015-06-06 BAE Systems (Operations) Limited: Amendment 39-18124.
Docket No. FAA-2014-0619; Directorate Identifier 2014-NM-029-AD.
(a) Effective Date
This AD becomes effective May 4, 2015.
(b) Affected ADs
None.
(c) Applicability
This AD applies to BAE Systems (Operations) Limited Model 4101
airplanes, certificated in any category, all serial numbers.
(d) Subject
Air Transport Association (ATA) of America Code 24, Electrical
Power.
(e) Reason
This AD was prompted by a report of the failure, due to
overheat, of a bracket on which the earth post (EP) for the
generator and propeller de-ice systems is located. We are issuing
this AD to detect and correct an overheat failure of the EPs for the
generator and propeller de-ice system and possible degradation of
the wing front spar cap and/or web, which could affect the
structural integrity of the wing.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Inspection of the Earth Posts and Attachment Structure and
Corrective Action
Within 6 months after the effective date of this AD: Do a
general visual inspection on both engines of the structure around
EP2 and EP4; the brackets on which the EPs are mounted; the
attachment of the nacelle horizontal support for damage, and lateral
movement of the EPs; in accordance with the Accomplishment
Instructions of BAE Systems (Operations) Limited Inspection Service
Bulletin J41-24-043, Revision 3, dated June 16, 2014. If any lateral
movement of the EP or any other damage is detected, before further
flight, repair using a method approved by the Manager, International
Branch, ANM-116, Transport Airplane Directorate, FAA; or the
European Aviation Safety Agency (EASA); or BAE Systems (Operations)
Limited's EASA Design Organization Approval (DOA).
(h) Inspection of the Earth Cables and Corrective Action
Within 6 months after the effective date of this AD: Do a
general visual inspection of the earth cables of the generator and
propeller de-ice system for arcing damage and signs that the cable
insulation or terminal tags have been overheated, and do all
applicable corrective actions; in accordance with the Accomplishment
Instructions of BAE Systems (Operations) Limited Inspection Service
Bulletin J41-24-043, Revision 3, dated June 16, 2014. Do all
applicable corrective actions before further flight.
(i) Torque Check of the Earth Post Stiff Nuts
Within 6 months after the effective date of this AD: Do a torque
check of the EP2 and EP4 stiff nuts, and adjust the torque load as
applicable, in accordance with the Accomplishment Instructions of
BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-
043, Revision 3, dated June 16, 2014.
(j) Resistance Measurement of the EP2 and EP4 Earth Bolts
Within 6 months after the effective date of this AD: Measure the
resistance of the EP2 and EP4 earth bolts using a high-current
millivolts-drop test, and do all applicable corrective actions, in
accordance with the Accomplishment Instructions of BAE Systems
(Operations) Limited Inspection Service Bulletin J41-24-043,
Revision 3, dated June 16, 2014. Do all applicable corrective
actions before further flight.
(k) No Reporting Required
Although BAE Systems (Operations) Limited Inspection Service
Bulletin J41-24-043, Revision 3, dated June 16, 2014, specifies to
submit information to the manufacturer, this AD does not require
that this information be submitted.
(l) Credit for Previous Actions
This paragraph provides credit for actions required by
paragraphs (g), (h), (i), and (j) of this AD, if those actions were
performed before the effective date of this AD using a service
bulletin specified in paragraph (l)(1), (l)(2), or (l)(3) of this
AD, which are not incorporated by reference in this AD.
(1) BAE Systems (Operations) Limited Inspection Service Bulletin
J41-24-043, dated September 27, 2011.
(2) BAE Systems (Operations) Limited Inspection Service Bulletin
J41-24-043, Revision 1, dated January 16, 2012.
(3) BAE Systems (Operations) Limited Inspection Service Bulletin
J41-24-043, Revision 2, dated August 21, 2013.
(m) Other FAA AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
has the authority to approve AMOCs for this AD, if requested using
the procedures found in 14 CFR 39.19. In accordance with 14 CFR
39.19, send your request to your principal inspector or local Flight
Standards District Office, as appropriate. If sending information
directly to the International Branch, send it to ATTN: Todd
Thompson, Aerospace Engineer, International Branch, ANM-116,
Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton,
WA 98057-3356; telephone 425-227-1175; fax 425-227-1149. Information
may be emailed to: [email protected]. Before using any
approved AMOC, notify your appropriate principal inspector, or
lacking a principal inspector, the manager of the local flight
standards district office/certificate holding district office. The
AMOC approval letter must specifically reference this AD.
(2) Contacting the Manufacturer: For any requirement in this AD
to obtain corrective actions from a manufacturer, the action must be
accomplished using a method approved by the Manager, International
Branch, ANM-116, Transport Airplane Directorate, FAA; or the
European Aviation Safety Agency (EASA); or BAE Systems (Operations)
Limited's EASA Design Organization Approval (DOA). If approved by
the DOA, the approval must include the DOA-authorized signature.
(n) Related Information
(1) Refer to Mandatory Continuing Airworthiness Information
(MCAI) European Aviation Safety Agency Airworthiness Directive 2014-
0006, dated January 7, 2014, for related information. This MCAI may
be found in the AD docket on the Internet at http://www.regulations.gov/#!documentDetail;D=FAA-2014-0619-0002.
(2) Service information identified in this AD that is not
incorporated by reference is available at the addresses specified in
paragraphs (o)(3) and (o)(4) of this AD.
(o) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(i) BAE Systems (Operations) Limited Inspection Service Bulletin
J41-24-043, Revision 3, dated June 16, 2014.
(ii) Reserved.
(3) For service information identified in this AD, contact BAE
Systems (Operations) Limited, Customer Information Department,
Prestwick International Airport, Ayrshire, KA9 2RW, Scotland, United
Kingdom; telephone +44 1292 675207; fax +44 1292 675704; email
[email protected]; Internet http://www.baesystems.com/Businesses/RegionalAircraft/index.htm.
(4) You may view this service information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For
information on the availability of this material at the FAA, call
425-227-1221.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued in Renton, Washington, on March 12, 2015.
Jeffrey E. Duven,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2015-06751 Filed 3-27-15; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T02:34:44.176858+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 2b93012a9ee604e4bd6551faf87e1743d87937d4f799b1c3d7f2c718333f1d62
- Text SHA-256
- dbc46fbc7e14f8208525eeb64a72724fa686c46fd8c2492f18a8fb30a30c5b99
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.