Published 2017-04-12 · Federal Register document 2017-06962
Airworthiness Directives; Gulfstream Aerospace Corporation Airplanes
Publication summary
We are superseding Airworthiness Directive (AD) 2013-22-19 for all Gulfstream Aerospace Corporation Model GV and GV-SP airplanes. AD 2013-22-19 required inspecting to determine if fuel boost pumps having a certain part number were installed, replacing the fuel boost pumps having a certain part number, and revising the airplane maintenance program to include revised Instructions for Continued Airworthiness. This new AD reduces the compliance time for revising the airplane maintenance or inspection program. This AD was prompted by reports of two independent types of failure of the fuel boost pump with overheat damage found on the internal components and external housing on one of the failure types, and fuel leakage on the other. We are issuing this AD to address the unsafe condition on these products.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:54.997910+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2017-90ba553c3b802c53
- Source row
- results[95]
- Raw source SHA-256
- 90ba553c3b802c5316e8d18f30db5da9f7731a87f58278ec2965f199ef4375e9
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2017-08-01
- Effective date printed in this edition
- 2017-05-17
Read 16 complete recorded clauses
Effective Date
(a) Effective Date
This AD is effective May 17, 2017.
Exact source excerpt. Text positions 19220–19280, end exclusive, in the original decoded publication. SHA-256: 9c8eb360fdfd1742f0ffaf952902d28d137aa922c8cc82bd7b6fafe695f0fe06
Affected ADs
(b) Affected ADs
This AD replaces AD 2013-22-19, Amendment 39-17651 (78 FR 72554,
December 3, 2013) (``AD 2013-22-19'').
Exact source excerpt. Text positions 19280–19408, end exclusive, in the original decoded publication. SHA-256: 4457feecd1572c663f6c25c68f84f0b3cb75c054b29d6d86e9c0ad4711f0673f
Applicability wording · Applicability
(c) Applicability
This AD applies to all Gulfstream Aerospace Corporation Model GV
and GV-SP airplanes, certificated in any category.
Exact source excerpt. Text positions 19408–19549, end exclusive, in the original decoded publication. SHA-256: c8d6888730c423e5621245eef41df3815165db47b08b14265fd5872c39120d85
Subject
(d) Subject
Air Transport Association (ATA) of America Code 28, Fuel.
Exact source excerpt. Text positions 19549–19625, end exclusive, in the original decoded publication. SHA-256: 6111602521633281b663b982f9d7970bbd75c93ea6c799bbb174e2608c77dd8a
Unsafe Condition
(e) Unsafe Condition
This AD was prompted by reports of two independent types of
failure of the fuel boost pump with overheat damage found on the
internal components and external housing on one of the failure
types, and fuel leakage on the other. We are issuing this AD to
prevent fuel leakage in combination with a capacitor clearance
issue, which could result in an uncontrolled fire in the wheel well.
Exact source excerpt. Text positions 19625–20041, end exclusive, in the original decoded publication. SHA-256: 55812529725c42765ee58204fa1fb98f7ea6ed6be5905dab33b939bbe837ebf7
Compliance
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
Exact source excerpt. Text positions 20041–20143, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3
Retained Inspection To Determine the Part Number, With Revised Service Information
(g) Retained Inspection To Determine the Part Number, With Revised
Service Information
This paragraph restates the actions required by paragraph (g) of
AD 2013-22-19, with revised service information. Within 36 months
after January 7, 2014 (the effective date of AD 2013-22-19), inspect
the fuel boost pumps to determine whether Gulfstream part number (P/
N) 1159SCP500-5 is installed, in accordance with the Accomplishment
Instructions of the applicable service information identified in
paragraphs (g)(1), (g)(2), and (g)(3) of this AD; and Triumph
Aerostructures Service Bulletin SB-TAGV/GVSP-28-JG0162, dated August
30, 2011, and GE Service Bulletin 31760-28-100, dated February 15,
2011. A review of airplane maintenance records is acceptable in lieu
of this inspection if the part number of the fuel boost pumps can be
conclusively determined from that review.
(1) For Model GV airplanes: Gulfstream V Customer Bulletin 197,
dated April 11, 2012.
(2) For Model GV-SP airplanes designated as G500: Gulfstream
G500 Customer Bulletin 122, dated April 11, 2012.
(3) For Model GV-SP airplanes designated as G550: Gulfstream
G550 Customer Bulletin 122, dated April 11, 2012.
Exact source excerpt. Text positions 20143–21350, end exclusive, in the original decoded publication. SHA-256: bc3504846a562e1658ec84dfbf6fc92619c4ba8fc0437f30042085fe3444a1ed
Retained Replacement, With Revised Service Information
(h) Retained Replacement, With Revised Service Information
This paragraph restates the actions required by paragraph (h) of
AD 2013-22-19, with revised service information. If the inspection
required by paragraph (g) of this AD reveals a fuel boost pump with
Gulfstream P/N 1159SCP500-5: Within 36 months after January 7, 2014
(the effective date of AD 2013-22-19), replace the fuel boost pump
with a serviceable pump having Gulfstream P/N 1159SCP500-7, in
accordance with the applicable service information identified in
paragraphs (h)(1), (h)(2), and (h)(3) of this AD; and Triumph
Aerostructures Service Bulletin SB-TAGV/GVSP-28-JG0162, dated August
30, 2011, and GE Service Bulletin 31760-28-100, dated February 15,
2011.
(1) For Model GV airplanes: Gulfstream V Customer Bulletin 197,
dated April 11, 2012.
(2) For Model GV-SP airplanes designated as G500: Gulfstream
G500 Customer Bulletin 122, dated April 11, 2012.
(3) For Model GV-SP airplanes designated as G550: Gulfstream
G550 Customer Bulletin 122, dated April 11, 2012.
Exact source excerpt. Text positions 21350–22415, end exclusive, in the original decoded publication. SHA-256: 69e3f4a1e282a67747ad567f093e3289a249ba586f8c6a28cfb66c2235697ef3
New Revision of the Maintenance or Inspection Program
(i) New Revision of the Maintenance or Inspection Program
Within 30 days after the effective date of this AD, revise the
airplane maintenance or inspection program, as applicable, to
include the fuel leak check inspection of the fuel boost pumps
specified in the applicable task identified in paragraph (j) of this
AD.
(1) For airplanes on which fuel boost pump Gulfstream P/N
1159SCP500-5 has been replaced in accordance with paragraph (h) of
this AD: The initial compliance time for the leak check inspection
specified in the applicable task identified in paragraph (j) of this
AD is within 550 flight hours after doing the replacement specified
in paragraph (h) of this AD, or within 30 days after the effective
date of this AD, whichever occurs later.
(2) For airplanes on which the inspection required by paragraph
(g) of this AD reveals that a fuel boost pump with Gulfstream P/N
1159SCP500-7 has been installed: The initial compliance time for the
leak check inspection specified in the applicable task identified in
paragraph (j) of this AD, is at the later of the times specified in
paragraphs (i)(2)(i) and (i)(2)(ii) of this AD.
(i) Within 550 flight hours after the installation of the P/N
1159SCP500-7 pump; except if 550 flight hours have accumulated since
installation of the P/N 1159SCP500-7 pump and an initial leak check
of the pump has not been accomplished, the compliance time is within
50 flight hours after doing the inspection required by paragraph (g)
of this AD.
(ii) Within 30 days after the effective date of this AD.
Exact source excerpt. Text positions 22415–24003, end exclusive, in the original decoded publication. SHA-256: 21101d3c0013c0ad1ba1ab313f3e88b79bd3a2af29785c35b7e0dd7ec35321d7
Service Information for Maintenance or Inspection Program Revision
(j) Service Information for Maintenance or Inspection Program Revision
Use the applicable service information specified in paragraph
(j)(1), (j)(2), or (j)(3) of this AD, as applicable, to revise the
airplane maintenance or inspection program, as applicable, as
required by paragraph (i) of this AD.
(1) For Model GV airplanes: Use table 12, Certification
Maintenance Requirements (CMR), in section 05-10-10, Airworthiness
Limitations, of chapter 05, Time Limits/Maintenance Checks; and task
28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section 28-26-01,
Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel; of the
Gulfstream V Maintenance Manual, Revision 44, dated June 15, 2016.
(2) For Model GV-SP airplanes designated as G500: Use task 28-
26-01, Fuel Boost Pumps--Fuel Leak Check, in table 12, Certification
Maintenance Requirements (CMR), in section 05-10-10, Airworthiness
Limitations, of chapter 05, Time Limits/Maintenance Checks; and task
28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section 28-26-01,
Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel; of the
Gulfstream G500 Maintenance Manual, Revision 25, dated June 15,
2016.
(3) For Model GV-SP airplanes designated as G550: Use task 28-
26-01, Fuel Boost Pumps--Fuel Leak Check, in table 12, Certification
Maintenance Requirements (CMR), in section 05-10-10, Airworthiness
Limitations, of chapter 05, Time Limits/Maintenance Checks; and task
28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section 28-26-01,
Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel; of the
Gulfstream G550 Maintenance Manual, Revision 25, dated June 15,
2016.
Exact source excerpt. Text positions 24003–25666, end exclusive, in the original decoded publication. SHA-256: bed4d3c99da8bf6a42d70d8e1746feb63e150c44c3960b3e546d331398c238d5
Credit for Previous Actions
(k) Credit for Previous Actions
This paragraph provides credit for the actions specified in
paragraph (i) of this AD, if those actions were performed before the
effective date of this AD using the applicable service information
in paragraphs (k)(1) through (k)(12) of this AD.
(1) Table 18, 500 Flight Hours Scheduled Inspection Table, in
section 05-20-00, Scheduled Maintenance Checks, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream V Maintenance Manual,
Revision 42, dated June 20, 2013.
(2) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel,
of the Gulfstream V Maintenance Manual, Revision 42, dated June 20,
2013.
(3) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Checks, in table
20, 500 Flight Hours Scheduled Inspection Table, in section 05-20-
00, of chapter 05, Time Limits/Maintenance Checks, of the Gulfstream
G500
[[Page 17537]]
Maintenance Manual, Revision 23, dated June 20, 2013.
(4) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
26, Fuel Boost Pumps, of chapter 28, Fuel, of the Gulfstream G500
Maintenance Manual, Revision 23, dated June 20, 2013.
(5) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, in table
20, 500 Flight Hours Scheduled Inspection Table, in section 05-20-
00, of chapter 05, Time Limits/Maintenance Checks, of the Gulfstream
G550 Maintenance Manual, Revision 23, dated June 20, 2013.
(6) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
26, Fuel Boost Pumps, of chapter 28, Fuel, of the Gulfstream G550
Maintenance Manual, Revision 23, dated June 20, 2013.
(7) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream V Maintenance Manual,
Revision 43, dated February 15, 2015.
(8) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel,
of the Gulfstream V Maintenance Manual, Revision 43, dated February
15, 2015.
(9) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream G500 Maintenance
Manual, Revision 24, dated February 15, 2015.
(10) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of
section 28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28,
Fuel, of the Gulfstream G500 Maintenance Manual, Revision 24, dated
February 15, 2015.
(11) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream G550 Maintenance
Manual, Revision 24, dated February 15, 2015.
(12) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of
section 28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28,
Fuel, of the Gulfstream G550 Maintenance Manual, Revision 24, dated
February 15, 2015.
Exact source excerpt. Text positions 25666–28717, end exclusive, in the original decoded publication. SHA-256: a1fe2a1b777902efc1a4ca72afa042c0f5ca6c59204b4d52ff6f968117408cc7
No Alternative Actions or Intervals
(l) No Alternative Actions or Intervals
After accomplishing the revision required by paragraph (i) of
this AD, no alternative actions (e.g., inspections) or intervals may
be used unless the actions or intervals are approved as an
alternative method of compliance in accordance with the procedures
specified in paragraph (n) of this AD.
Exact source excerpt. Text positions 28717–29063, end exclusive, in the original decoded publication. SHA-256: 3726850fabdf520c4948043881bccc1549856658eba258cd295c0c6292358a07
Parts Installation Prohibition
(m) Parts Installation Prohibition
As of January 7, 2014 (the effective date of AD 2013-22-19), no
person may install a fuel boost pump having Gulfstream P/N
1159SCP500-5 on any airplane.
Exact source excerpt. Text positions 29063–29259, end exclusive, in the original decoded publication. SHA-256: ad79ca7419516d29bc0fb2bd5b47588d47ff99b07b31cd564ab975c1030c9eb9
Alternative Methods of Compliance (AMOCs)
(n) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Atlanta Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested
using the procedures found in 14 CFR 39.19. In accordance with 14
CFR 39.19, send your request to your principal inspector or local
Flight Standards District Office, as appropriate. If sending
information directly to the manager of the ACO, send it to the
attention of the person identified in paragraph (o)(1) of this AD.
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(3) AMOCs approved for AD 2013-22-19, are approved as AMOCs for
the corresponding provisions of this AD.
(4) For service information that contains steps that are labeled
as Required for Compliance (RC), the provisions of paragraphs
(n)(4)(i) and (n)(4)(ii) apply.
(i) The steps labeled as RC, including substeps under an RC step
and any figures identified in an RC step, must be done to comply
with the AD. An AMOC is required for any deviations to RC steps,
including substeps and identified figures.
(ii) Steps not labeled as RC may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection
program without obtaining approval of an AMOC, provided the RC
steps, including substeps and identified figures, can still be done
as specified, and the airplane can be put back in an airworthy
condition.
Exact source excerpt. Text positions 29259–30852, end exclusive, in the original decoded publication. SHA-256: 6041b6adfd7cfa3bf7b04bbd748d9d5903a52cb5654ee367f076d4e3e3f65c7a
Related Information
(o) Related Information
(1) For more information about this AD, contact Ky Phan,
Aerospace Engineer, Propulsion and Services Branch, ACE-118A, FAA,
Atlanta ACO, 1701 Columbia Avenue, College Park, GA 30337; phone:
404-474-5536; fax: 404-474-5606; email: [email protected].
(2) Service information identified in this AD that is not
incorporated by reference is available at the addresses specified in
paragraphs (p)(5) and (p)(6) of this AD.
Exact source excerpt. Text positions 30852–31308, end exclusive, in the original decoded publication. SHA-256: 370eafaa8407ccead77a9917941c8d83d81a6e83d004ceb148a0dac746b1a1d7
Material Incorporated by Reference
(p) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(3) The following service information was approved for IBR on
May 17, 2017.
(i) Gulfstream G500 Customer Bulletin 122, dated April 11, 2012.
(ii) Gulfstream V Maintenance Manual, Revision 44, dated June
15, 2016:
(A) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks.
(B) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel.
(iii) Gulfstream G500 Maintenance Manual, Revision 25, dated
June 15, 2016:
(A) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks.
(B) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of Section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel.
(iv) Gulfstream G550 Maintenance Manual, Revision 25, dated June
15, 2016:
(A) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks.
(B) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel.
(4) The following service information was approved for IBR on
January 7, 2014 (78 FR 72554, December 3, 2013).
(i) Gulfstream G550 Customer Bulletin 122, dated April 11, 2012.
(ii) Gulfstream V Customer Bulletin 197, dated April 11, 2012.
(iii) General Electric Service Bulletin 31760-28-100, dated
February 15, 2011.
(iv) Triumph Service Bulletin SB-TAGV/GVSP-28-JG0162, dated
August 30, 2011.
(5) For Gulfstream, Triumph Aerostructures, and General Electric
Aviation service information identified in this AD, contact
Gulfstream Aerospace Corporation, Technical Publications Dept., P.O.
Box 2206, Savannah, GA 31402-2206; telephone 800-810-4853; fax 912
965-3520; email [email protected]; Internet http://www.gulfstream.com/product_support/technical_pubs/pubs/index.htm.
(6) You may view this service information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For
information on the availability of this material at the FAA, call
425-227-1221.
(7) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Exact source excerpt. Text positions 31308–34266, end exclusive, in the original decoded publication. SHA-256: b54ccdf65989e4f842d7fa004338e591f56b77822b412c4113e109982cd9ff1a
Explicit historical replacement wording
Find all recorded historical references to AD 2017-08-01 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 63fa5aea88a950d13baef239fca7b1f7a92cc19e763522a4c0b67232348e6d15. Source manifest: 72cbedbce87b42e6fcda49042396760d913e91b5e208ce2acfcaba7ffcf90782.
Official source · 2017-04-12
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 82, Number 69 (Wednesday, April 12, 2017)]
[Rules and Regulations]
[Pages 17533-17537]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06962]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2014-0651; Directorate Identifier 2014-NM-043-AD;
Amendment 39-18850; AD 2017-08-01]
RIN 2120-AA64
Airworthiness Directives; Gulfstream Aerospace Corporation
Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are superseding Airworthiness Directive (AD) 2013-22-19 for
all Gulfstream Aerospace Corporation Model GV and GV-SP airplanes. AD
2013-22-19 required inspecting to determine if fuel boost pumps having
a certain part number were installed, replacing the fuel boost pumps
having a certain part number, and revising the airplane maintenance
program to include revised Instructions for Continued Airworthiness.
This new AD reduces the compliance time for revising the airplane
maintenance or inspection program. This AD was prompted by reports of
two independent types of failure of the fuel boost pump with overheat
damage found on the internal components and external housing on one of
the failure types, and fuel leakage on the other. We are issuing this
AD to address the unsafe condition on these products.
DATES: This AD is effective May 17, 2017.
The Director of the Federal Register approved the incorporation by
reference of certain publications listed in this AD as of May 17, 2017.
The Director of the Federal Register approved the incorporation by
reference of certain other publications listed in this AD as of January
7, 2014 (78 FR 72554, December 3, 2013).
ADDRESSES: For Gulfstream, Triumph Aerostructures, and General Electric
Aviation service information identified in this final rule, contact
Gulfstream Aerospace Corporation, Technical Publications Dept., P.O.
Box 2206, Savannah, GA 31402-2206; telephone 800-810-4853; fax 912 965-
3520; email [email protected]; Internet http://www.gulfstream.com/product_support/technical_pubs/pubs/index.htm. You may view this
referenced service information at the FAA, Transport Airplane
Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the
availability of this material at the FAA, call 425-227-1221. It is also
available on the Internet at http://www.regulations.gov by searching
for and locating Docket No. FAA-2014-0651.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2014-
0651; or in person at the Docket Management Facility between 9 a.m. and
5 p.m., Monday through Friday, except Federal holidays. The AD docket
contains this AD, the regulatory evaluation, any comments received, and
other information. The address for the Docket Office (phone: 800-647-
5527) is Docket Management Facility, U.S. Department of Transportation,
Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200
New Jersey Avenue SE., Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Ky Phan, Aerospace Engineer,
Propulsion and Services Branch, ACE-118A, FAA, Atlanta ACO, 1701
Columbia Avenue, College Park, GA 30337; phone: 404-474-5536; fax: 404-
474-5606; email: [email protected].
SUPPLEMENTARY INFORMATION:
Discussion
We issued a supplemental notice of proposed rulemaking (SNPRM) to
amend 14 CFR part 39 to supersede AD 2013-22-19, Amendment 39-17651 (78
FR 72554, December 3, 2013) (``AD 2013-22-19''). AD 2013-22-19 applied
to all Gulfstream Aerospace Corporation Model GV and GV-SP airplanes.
The SNPRM published in the Federal Register on December 24, 2015 (80 FR
80295). We preceded the SNPRM with a notice of proposed rulemaking
(NPRM) that published in the Federal Register on October 1, 2014 (79 FR
59162) (``the NPRM''). The NPRM proposed to supersede AD 2013-22-19.
The NPRM was prompted by reports of two independent types of failure of
the fuel boost pump with overheat damage on the internal components and
external housing on one of the failure types, and fuel leakage on the
other. The SNPRM proposed to reduce the compliance time for revising
the airplane maintenance or inspection program. We are issuing this
[[Page 17534]]
AD to prevent fuel leakage in combination with a capacitor clearance
issue, which could result in an uncontrolled fire in the wheel well.
Comments
We gave the public the opportunity to participate in developing
this AD. The following presents the comments received on the SNPRM and
the FAA's response to each comment.
Request for Access to Earlier Revisions of the Service Information
NetJets requested that we provide a source for earlier revisions of
the required service information. NetJets stated that the NPRM
specifies that the required service information is available from
Gulfstream's Web site. NetJets stated that the Gulfstream Web site
currently provides only the latest revision of each airplane
maintenance manual (AMM) without the option to obtain earlier
revisions, which will be incorporated by reference (IBR) in the AD.
We acknowledge NetJets' request. While previous revisions of the
service information are not available through Gulfstream's Web site,
operators may contact Gulfstream directly to obtain this information as
specified in paragraph (p)(5) of this AD. We have updated this AD to
reference the latest service information, which is available to
operators through Gulfstream's Web site. We have not changed this final
rule regarding this issue.
Request To Change the Term ``Replacing'' in Paragraph (b) of the
Proposed AD
NetJets requested that we define the authority and meaning of the
term ``replaces'' in regards to ADs. NetJets also requested that we
revise the FAA's AD Manual, dated May 17, 2010 (FAA-IR-M-8040.1C).
NetJets stated that ``replaces'' is not defined in the FAA's AD Manual
or in other FAA guidance. NetJets commented that the FAA AD Manual
defines the means of changing existing AD requirements to be through a
``superseding AD action.'' NetJets also stated that the SUMMARY section
of the SNRPM also uses the term ``supersede.''
We agree to clarify the use of the term ``replaces'' in regards to
ADs. The term ``replaces'' in paragraph (b) of this AD is amendatory
terminology required by the Office of the Federal Register. However, we
use the term ``supersede'' or ``superseding'' in the SUMMARY section of
AD actions because the FAA's AD Manual, dated May 17, 2010 (FAA-IR-M-
8040.1C), does not use the term ``replaces'' when referring to an AD
that supersedes or is superseded by another AD. As stated in the FAA AD
Manual, we issue a supersedure when we need to correct an error that
affects the substance of the AD or to expand the scope of the existing
AD. We expect that the next revision of the FAA's AD Manual will
incorporate the amendatory terminology required by the Office of the
Federal Register. No change to this AD is necessary in this regard.
Request To Revise the SNPRM for Airplanes Inspected Under 14 CFR
91.409(e)
An anonymous commenter requested that we revise paragraph (i) of
the proposed AD (in the SNPRM) to include a statement that the proposed
requirements would not be required for those airplanes inspected under
a 14 CFR 91.409(e) inspection program. The commenter stated that Task
28-26-01 is already mandated by the FAA-approved Airworthiness
Limitations Section (ALS), which already mandates the task to be
performed per the requirements of the ALS. Therefore, the commenter
asserts that paragraph (i) of the proposed AD (in the SNPRM) is
unnecessary for airplanes inspected under a 14 CFR 91.409(e) inspection
program.
We disagree with the commenter's request. While 14 CFR 91.409(e)
requires operators of turbojet multi-engine airplanes to comply with
the replacement times of life-limited parts, 14 CFR 91.409(e) does not
require operators to use later revisions of the AMMs that are specified
in the type certificate. This AD is necessary in order to require
revising the maintenance or inspection program, as applicable, to
include the fuel leak check inspection of the fuel boost pumps
specified in the applicable task identified in paragraph (j) of this
AD. Paragraph (j) of this AD identifies specific revisions of the AMM,
which are required for compliance with this AD. We have not changed
this AD in this regard.
Requests To Refer To Correct Location of Task
NetJets and an anonymous commenter requested that we revise
paragraph (j) of the proposed AD (in the SNPRM) to refer to table 12,
Certification Maintenance Requirements (CMR), in section 05-10-10,
Airworthiness Limitations, of chapter 05, Time Limits/Maintenance
Checks, of the applicable Gulfstream AMM. NetJets stated that paragraph
(j) of the proposed AD (in the SNPRM) instead specifies the use of
table 18, 500 Flight Hours Scheduled Inspection Table, in section 05-
20-00, Scheduled Maintenance Checks. NetJets and the anonymous
commenter stated that this task does not exist in section 05-20-00 of
the current AMM; it is now found in table 12, Certification Maintenance
Requirements (CMR), in section 05-10-10, Airworthiness Limitations, of
chapter 05, Time Limits/Maintenance Checks, of the applicable
Gulfstream AMM.
We agree with the commenters' requests for the reasons stated
above. We have updated paragraphs (j)(1), (j)(2), and (j)(3) of this AD
to refer to the correct table and section where the specified task is
found. In addition, we have added paragraph (k) to this AD to provide
credit for actions specified in paragraph (i) of this AD that are done
before the effective date of this AD using the service information
specified in paragraph (k) of this AD. We have re-designated subsequent
paragraphs accordingly.
Request To Add ``or Later FAA-Approved Revision''
NetJets requested that we revise paragraph (j) of the proposed AD
(in the SNPRM) to add ``or later FAA-approved revision.'' NetJets
stated that section 05-20-00, Scheduled Maintenance Checks, of chapter
05, Time Limits/Maintenance Checks; and task 28-26-01, Fuel Boost
Pumps--Fuel Leak Check, of chapter 28, Fuel; of the Gulfstream V AMM
are now at Revision 44, dated June 15, 2016. NetJets commented that
referring to a previous revision of the AMM would result in an
immediate petition for approval of an alternate method of compliance
(AMOC) with the newly revised document. NetJets stated that this narrow
language would require the operator to obtain an AMOC for each future
revision of the AMM.
NetJets further requested that, if the ``later approved revisions''
language cannot be added, the latest revisions of the AMMs be added as
a method of compliance in paragraph (j) of the proposed AD.
We disagree with the commenter's request to add language allowing
use of later revisions. We cannot use the phrase ``or later FAA-
approved revisions'' in an AD when referring to the service document.
Doing so violates Office of the Federal Register's (OFR) regulations
for approval of materials ``incorporated by reference'' in rules. See 1
CFR 51.1(f).
However, as we stated previously, we have updated this AD to refer
to the current service information. Operators must request approval to
use later revisions of the service information as an AMOC with this AD
under the provisions of paragraph (n) of this AD. We have made no
further change to this AD in this regard.
[[Page 17535]]
Conclusion
We reviewed the relevant data, considered the comments received,
and determined that air safety and the public interest require adopting
this AD with the changes described previously and minor editorial
changes. We have determined that these minor changes:
<bullet> Are consistent with the intent that was proposed in the
SNPRM for correcting the unsafe condition; and
<bullet> Do not add any additional burden upon the public than was
already proposed in the SNPRM.
We also determined that these changes will not increase the
economic burden on any operator or increase the scope of this AD.
Related Service Information Under 1 CFR Part 51
We reviewed Gulfstream G500 Customer Bulletin 122, dated April 11,
2012 (for Model GV-SP airplanes designated as G500). This service
information describes procedures for inspecting and replacing the fuel
boost pumps.
We have also reviewed the following service information, as
applicable, which describes, among other actions, a fuel leak check of
the fuel boost pumps, and provides inspection intervals. These service
documents are unique because they apply to different airplane models.
<bullet> Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream V Maintenance Manual,
Revision 44, dated June 15, 2016.
<bullet> Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of
section 28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28,
Fuel, of the Gulfstream V Maintenance Manual, Revision 44, dated June
15, 2016.
<bullet> Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream G500 Maintenance Manual,
Revision 25, dated June 15, 2016.
<bullet> Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of
section 28-26-01, Fuel Boost Pumps--Fuel Leak Checks, of chapter 28,
Fuel, of the Gulfstream G500 Maintenance Manual, Revision 25, dated
June 15, 2016.
<bullet> Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream G550 Maintenance Manual,
Revision 25, dated June 15, 2016.
<bullet> Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of
section 28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28,
Fuel, of the Gulfstream G550 Maintenance Manual, Revision 25, dated
June 15, 2016.
This service information is reasonably available because the
interested parties have access to it through their normal course of
business or by the means identified in the ADDRESSES section.
Costs of Compliance
We estimate that this AD will affect 357 airplanes of U.S.
registry.
We estimate the following costs to comply with this AD:
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Cost per Cost on U.S.
Action Labor cost Parts cost product operators
----------------------------------------------------------------------------------------------------------------
Inspection to determine if a certain 1 work-hour x $85 per $0 $85 $30,345
part number is installed (retained hour = $85.
actions from AD 2013-22-19).
Maintenance or inspection program 1 work-hour x $85 per 0 85 30,345
revision (new action). hour = $85.
----------------------------------------------------------------------------------------------------------------
We estimate the following costs to do any necessary replacements
that will be required based on the results of the inspection. We have
no way of determining the number of aircraft that might need these
replacements:
On-Condition Cost
----------------------------------------------------------------------------------------------------------------
Cost per
Action Labor cost Parts cost product
----------------------------------------------------------------------------------------------------------------
Replacement.................................. 24 work-hours x $85 per hour = $7,600 $9,640
$2,040.
----------------------------------------------------------------------------------------------------------------
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, Section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
[[Page 17536]]
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing Airworthiness Directive (AD)
2013-22-19, Amendment 39-17651 (78 FR 72554, December 3, 2013), and
adding the following new AD:
2017-08-01 Gulfstream Aerospace Corporation: Amendment 39-18850;
Docket No. FAA-2014-0651; Directorate Identifier 2014-NM-043-AD.
(a) Effective Date
This AD is effective May 17, 2017.
(b) Affected ADs
This AD replaces AD 2013-22-19, Amendment 39-17651 (78 FR 72554,
December 3, 2013) (``AD 2013-22-19'').
(c) Applicability
This AD applies to all Gulfstream Aerospace Corporation Model GV
and GV-SP airplanes, certificated in any category.
(d) Subject
Air Transport Association (ATA) of America Code 28, Fuel.
(e) Unsafe Condition
This AD was prompted by reports of two independent types of
failure of the fuel boost pump with overheat damage found on the
internal components and external housing on one of the failure
types, and fuel leakage on the other. We are issuing this AD to
prevent fuel leakage in combination with a capacitor clearance
issue, which could result in an uncontrolled fire in the wheel well.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Retained Inspection To Determine the Part Number, With Revised
Service Information
This paragraph restates the actions required by paragraph (g) of
AD 2013-22-19, with revised service information. Within 36 months
after January 7, 2014 (the effective date of AD 2013-22-19), inspect
the fuel boost pumps to determine whether Gulfstream part number (P/
N) 1159SCP500-5 is installed, in accordance with the Accomplishment
Instructions of the applicable service information identified in
paragraphs (g)(1), (g)(2), and (g)(3) of this AD; and Triumph
Aerostructures Service Bulletin SB-TAGV/GVSP-28-JG0162, dated August
30, 2011, and GE Service Bulletin 31760-28-100, dated February 15,
2011. A review of airplane maintenance records is acceptable in lieu
of this inspection if the part number of the fuel boost pumps can be
conclusively determined from that review.
(1) For Model GV airplanes: Gulfstream V Customer Bulletin 197,
dated April 11, 2012.
(2) For Model GV-SP airplanes designated as G500: Gulfstream
G500 Customer Bulletin 122, dated April 11, 2012.
(3) For Model GV-SP airplanes designated as G550: Gulfstream
G550 Customer Bulletin 122, dated April 11, 2012.
(h) Retained Replacement, With Revised Service Information
This paragraph restates the actions required by paragraph (h) of
AD 2013-22-19, with revised service information. If the inspection
required by paragraph (g) of this AD reveals a fuel boost pump with
Gulfstream P/N 1159SCP500-5: Within 36 months after January 7, 2014
(the effective date of AD 2013-22-19), replace the fuel boost pump
with a serviceable pump having Gulfstream P/N 1159SCP500-7, in
accordance with the applicable service information identified in
paragraphs (h)(1), (h)(2), and (h)(3) of this AD; and Triumph
Aerostructures Service Bulletin SB-TAGV/GVSP-28-JG0162, dated August
30, 2011, and GE Service Bulletin 31760-28-100, dated February 15,
2011.
(1) For Model GV airplanes: Gulfstream V Customer Bulletin 197,
dated April 11, 2012.
(2) For Model GV-SP airplanes designated as G500: Gulfstream
G500 Customer Bulletin 122, dated April 11, 2012.
(3) For Model GV-SP airplanes designated as G550: Gulfstream
G550 Customer Bulletin 122, dated April 11, 2012.
(i) New Revision of the Maintenance or Inspection Program
Within 30 days after the effective date of this AD, revise the
airplane maintenance or inspection program, as applicable, to
include the fuel leak check inspection of the fuel boost pumps
specified in the applicable task identified in paragraph (j) of this
AD.
(1) For airplanes on which fuel boost pump Gulfstream P/N
1159SCP500-5 has been replaced in accordance with paragraph (h) of
this AD: The initial compliance time for the leak check inspection
specified in the applicable task identified in paragraph (j) of this
AD is within 550 flight hours after doing the replacement specified
in paragraph (h) of this AD, or within 30 days after the effective
date of this AD, whichever occurs later.
(2) For airplanes on which the inspection required by paragraph
(g) of this AD reveals that a fuel boost pump with Gulfstream P/N
1159SCP500-7 has been installed: The initial compliance time for the
leak check inspection specified in the applicable task identified in
paragraph (j) of this AD, is at the later of the times specified in
paragraphs (i)(2)(i) and (i)(2)(ii) of this AD.
(i) Within 550 flight hours after the installation of the P/N
1159SCP500-7 pump; except if 550 flight hours have accumulated since
installation of the P/N 1159SCP500-7 pump and an initial leak check
of the pump has not been accomplished, the compliance time is within
50 flight hours after doing the inspection required by paragraph (g)
of this AD.
(ii) Within 30 days after the effective date of this AD.
(j) Service Information for Maintenance or Inspection Program Revision
Use the applicable service information specified in paragraph
(j)(1), (j)(2), or (j)(3) of this AD, as applicable, to revise the
airplane maintenance or inspection program, as applicable, as
required by paragraph (i) of this AD.
(1) For Model GV airplanes: Use table 12, Certification
Maintenance Requirements (CMR), in section 05-10-10, Airworthiness
Limitations, of chapter 05, Time Limits/Maintenance Checks; and task
28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section 28-26-01,
Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel; of the
Gulfstream V Maintenance Manual, Revision 44, dated June 15, 2016.
(2) For Model GV-SP airplanes designated as G500: Use task 28-
26-01, Fuel Boost Pumps--Fuel Leak Check, in table 12, Certification
Maintenance Requirements (CMR), in section 05-10-10, Airworthiness
Limitations, of chapter 05, Time Limits/Maintenance Checks; and task
28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section 28-26-01,
Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel; of the
Gulfstream G500 Maintenance Manual, Revision 25, dated June 15,
2016.
(3) For Model GV-SP airplanes designated as G550: Use task 28-
26-01, Fuel Boost Pumps--Fuel Leak Check, in table 12, Certification
Maintenance Requirements (CMR), in section 05-10-10, Airworthiness
Limitations, of chapter 05, Time Limits/Maintenance Checks; and task
28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section 28-26-01,
Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel; of the
Gulfstream G550 Maintenance Manual, Revision 25, dated June 15,
2016.
(k) Credit for Previous Actions
This paragraph provides credit for the actions specified in
paragraph (i) of this AD, if those actions were performed before the
effective date of this AD using the applicable service information
in paragraphs (k)(1) through (k)(12) of this AD.
(1) Table 18, 500 Flight Hours Scheduled Inspection Table, in
section 05-20-00, Scheduled Maintenance Checks, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream V Maintenance Manual,
Revision 42, dated June 20, 2013.
(2) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel,
of the Gulfstream V Maintenance Manual, Revision 42, dated June 20,
2013.
(3) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Checks, in table
20, 500 Flight Hours Scheduled Inspection Table, in section 05-20-
00, of chapter 05, Time Limits/Maintenance Checks, of the Gulfstream
G500
[[Page 17537]]
Maintenance Manual, Revision 23, dated June 20, 2013.
(4) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
26, Fuel Boost Pumps, of chapter 28, Fuel, of the Gulfstream G500
Maintenance Manual, Revision 23, dated June 20, 2013.
(5) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, in table
20, 500 Flight Hours Scheduled Inspection Table, in section 05-20-
00, of chapter 05, Time Limits/Maintenance Checks, of the Gulfstream
G550 Maintenance Manual, Revision 23, dated June 20, 2013.
(6) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
26, Fuel Boost Pumps, of chapter 28, Fuel, of the Gulfstream G550
Maintenance Manual, Revision 23, dated June 20, 2013.
(7) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream V Maintenance Manual,
Revision 43, dated February 15, 2015.
(8) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel,
of the Gulfstream V Maintenance Manual, Revision 43, dated February
15, 2015.
(9) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream G500 Maintenance
Manual, Revision 24, dated February 15, 2015.
(10) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of
section 28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28,
Fuel, of the Gulfstream G500 Maintenance Manual, Revision 24, dated
February 15, 2015.
(11) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks, of the Gulfstream G550 Maintenance
Manual, Revision 24, dated February 15, 2015.
(12) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of
section 28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28,
Fuel, of the Gulfstream G550 Maintenance Manual, Revision 24, dated
February 15, 2015.
(l) No Alternative Actions or Intervals
After accomplishing the revision required by paragraph (i) of
this AD, no alternative actions (e.g., inspections) or intervals may
be used unless the actions or intervals are approved as an
alternative method of compliance in accordance with the procedures
specified in paragraph (n) of this AD.
(m) Parts Installation Prohibition
As of January 7, 2014 (the effective date of AD 2013-22-19), no
person may install a fuel boost pump having Gulfstream P/N
1159SCP500-5 on any airplane.
(n) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Atlanta Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested
using the procedures found in 14 CFR 39.19. In accordance with 14
CFR 39.19, send your request to your principal inspector or local
Flight Standards District Office, as appropriate. If sending
information directly to the manager of the ACO, send it to the
attention of the person identified in paragraph (o)(1) of this AD.
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(3) AMOCs approved for AD 2013-22-19, are approved as AMOCs for
the corresponding provisions of this AD.
(4) For service information that contains steps that are labeled
as Required for Compliance (RC), the provisions of paragraphs
(n)(4)(i) and (n)(4)(ii) apply.
(i) The steps labeled as RC, including substeps under an RC step
and any figures identified in an RC step, must be done to comply
with the AD. An AMOC is required for any deviations to RC steps,
including substeps and identified figures.
(ii) Steps not labeled as RC may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection
program without obtaining approval of an AMOC, provided the RC
steps, including substeps and identified figures, can still be done
as specified, and the airplane can be put back in an airworthy
condition.
(o) Related Information
(1) For more information about this AD, contact Ky Phan,
Aerospace Engineer, Propulsion and Services Branch, ACE-118A, FAA,
Atlanta ACO, 1701 Columbia Avenue, College Park, GA 30337; phone:
404-474-5536; fax: 404-474-5606; email: [email protected].
(2) Service information identified in this AD that is not
incorporated by reference is available at the addresses specified in
paragraphs (p)(5) and (p)(6) of this AD.
(p) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(3) The following service information was approved for IBR on
May 17, 2017.
(i) Gulfstream G500 Customer Bulletin 122, dated April 11, 2012.
(ii) Gulfstream V Maintenance Manual, Revision 44, dated June
15, 2016:
(A) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks.
(B) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel.
(iii) Gulfstream G500 Maintenance Manual, Revision 25, dated
June 15, 2016:
(A) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks.
(B) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of Section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel.
(iv) Gulfstream G550 Maintenance Manual, Revision 25, dated June
15, 2016:
(A) Table 12, Certification Maintenance Requirements (CMR), in
section 05-10-10, Airworthiness Limitations, of chapter 05, Time
Limits/Maintenance Checks.
(B) Task 28-26-01, Fuel Boost Pumps--Fuel Leak Check, of section
28-26-01, Fuel Boost Pumps--Inspection/Check, of chapter 28, Fuel.
(4) The following service information was approved for IBR on
January 7, 2014 (78 FR 72554, December 3, 2013).
(i) Gulfstream G550 Customer Bulletin 122, dated April 11, 2012.
(ii) Gulfstream V Customer Bulletin 197, dated April 11, 2012.
(iii) General Electric Service Bulletin 31760-28-100, dated
February 15, 2011.
(iv) Triumph Service Bulletin SB-TAGV/GVSP-28-JG0162, dated
August 30, 2011.
(5) For Gulfstream, Triumph Aerostructures, and General Electric
Aviation service information identified in this AD, contact
Gulfstream Aerospace Corporation, Technical Publications Dept., P.O.
Box 2206, Savannah, GA 31402-2206; telephone 800-810-4853; fax 912
965-3520; email [email protected]; Internet http://www.gulfstream.com/product_support/technical_pubs/pubs/index.htm.
(6) You may view this service information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For
information on the availability of this material at the FAA, call
425-227-1221.
(7) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued in Renton, Washington, on March 31, 2017.
Michael Kaszycki,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2017-06962 Filed 4-11-17; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T02:22:06.448479+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- efba09e6f1e362a9a943e0fce81aeacb00e30484d8e5e1db72103be38c415d72
- Text SHA-256
- 63fa5aea88a950d13baef239fca7b1f7a92cc19e763522a4c0b67232348e6d15
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence