Published 2018-04-12 · Federal Register document 2018-07541
Airworthiness Directives; Safran Helicopter Engines, S.A., Turboshaft Engines
Publication summary
We are adopting a new airworthiness directive (AD) for certain Safran Helicopter Engines, S.A., Arrius 2B1, 2B1A, 2B2, and 2K1 turboshaft engines. This AD requires inspecting the power turbine wheel (PTW) assembly and replacing the PTW if the turbine blade dampers are found missing. This AD was prompted by the manufacturer reporting a number of PTW assemblies may have been assembled without the blade dampers. We are issuing this AD to address the unsafe condition on these products.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:58.123663+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2018-258c65fa72d503e0
- Source row
- results[110]
- Raw source SHA-256
- 258c65fa72d503e0b0dfb928a28beb1793ddc7dd9218bce0413e53dfe11d78fb
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2018-07-17
- Effective date printed in this edition
- 2018-04-27
Read 11 complete recorded clauses
Effective Date
(a) Effective Date
This AD is effective April 27, 2018.
Exact source excerpt. Text positions 13706–13768, end exclusive, in the original decoded publication. SHA-256: 4907b7d2bf0549e11f64bfcbaa3fe06946e9179939a2dbf159cd4dc784fc06d9
Affected ADs
(b) Affected ADs
None.
Exact source excerpt. Text positions 13768–13797, end exclusive, in the original decoded publication. SHA-256: 871a4afc60ceeae06e8010585055188633d616078500c45937092bfe892239c0
Applicability wording · Applicability
(c) Applicability
This AD applies to Safran Helicopter Engines, S.A., Arrius 2B1,
2B1A, 2B2, and 2K1 turboshaft engines with a power turbine wheel
(PTW) assembly having a serial number listed in Appendix 2.1 of
Safran Helicopter Engines Mandatory Service Bulletin (MSB) No. A319
72 2854, Version A, dated February 9, 2018.
Exact source excerpt. Text positions 13797–14130, end exclusive, in the original decoded publication. SHA-256: 164d0b82ce39e90e5d0fb6d35f307b7e428ff2d1c76f63cffab2163b8c488544
Subject
(d) Subject
Joint Aircraft System Component (JASC) Code 7250, Turbine
Section.
Exact source excerpt. Text positions 14130–14216, end exclusive, in the original decoded publication. SHA-256: 0a22a80cf75c2450c6093c2ef5ee35332eb90935fd467639e0772a85d4a57974
Unsafe Condition
(e) Unsafe Condition
This AD was prompted by an engine failure caused by missing
turbine blade dampers. We are issuing this AD to prevent failure of
a power turbine blade. The unsafe condition, if not addressed, could
result in loss of engine power in flight and reduced control of the
helicopter.
Exact source excerpt. Text positions 14216–14524, end exclusive, in the original decoded publication. SHA-256: 5dfb6ea90e6111b3bb1d12cf31d10ab668d54e37b61da3b2e7bb02bf2fcc0159
Compliance
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
Exact source excerpt. Text positions 14524–14626, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3
Required Actions
(g) Required Actions
Within 20 flight hours or 30 days after the effective date of
this AD, whichever occurs first:
(1) Inspect the PTW in accordance with paragraph 2.4.2.3 of
Safran Helicopter Engines MSB No. A319 72 2854, Version A, dated
February 9, 2018; and
(2) If, as a result of the inspection required by paragraph
(g)(1) of this AD, any dampers are found missing, replace the PTW
with a part eligible for installation before further flight.
Exact source excerpt. Text positions 14626–15095, end exclusive, in the original decoded publication. SHA-256: 0c45d0ca0324495093426b687ddbabc760c80e0e7e0f91c67a084b5e93a06096
Installation Prohibition
(h) Installation Prohibition
Do not install an engine with a PTW with a serial number listed
in Appendix 2.1 of Safran Helicopter Engines MSB A319 72 2854,
Version A, dated February 9, 2018, unless all thirty-one blade
dampers are installed.
Exact source excerpt. Text positions 15095–15346, end exclusive, in the original decoded publication. SHA-256: 31fa2b55886d2e6216f0a361b112a3535958369b3bbc5ffe7acc021342646c62
Alternative Methods of Compliance (AMOCs)
(i) Alternative Methods of Compliance (AMOCs)
(1) The Manager, ECO Branch, FAA, has the authority to approve
AMOCs for this AD, if requested using the procedures found in 14 CFR
39.19. In accordance with 14 CFR 39.19, send your request to your
principal inspector or local Flight Standards District Office, as
appropriate. If sending information directly to the manager of the
certification office, send it to the attention of the person
identified in paragraph (j)(1) of this AD. You may email your
request to: [email protected].
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
Exact source excerpt. Text positions 15346–16107, end exclusive, in the original decoded publication. SHA-256: bffd953a2c81cbe88e5919e6feeec16e1c21d9a80ef577ce57149becc8160d2c
Related Information
(j) Related Information
(1) For more information about this AD, contact Robert Green,
Aerospace Engineer, ECO Branch, FAA, 1200 District Avenue,
Burlington, MA 01803; phone: 781-238-7754; fax: 781-238-7199; email:
[email protected].
(2) Refer to European Aviation Safety Agency (EASA) AD 2018-
0044, dated February 14, 2018, for more information. You may examine
the EASA AD in the AD docket on the internet at http://www.regulations.gov by searching for and locating it in Docket No.
FAA-2018-0184.
Exact source excerpt. Text positions 16107–16622, end exclusive, in the original decoded publication. SHA-256: e5b291e2ae6a1300ec2d307b27bfa89b1e0144cb522c4ef1388e69625cebc630
Material Incorporated by Reference
(k) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Safran Helicopter Engines Alert Mandatory Service Bulletin
No. A319 72 2854, Version A, dated February 9, 2018.
(ii) Reserved.
(3) For Safran Helicopter Engines service information identified
in this AD, contact Safran Helicopter Engines, S.A., 40220 Tarnos,
France; phone: (33) 05 59 74 40 00; fax: (33) 05 59 74 45 15.
(4) You may view this service information at FAA, Engine &
Propeller Standards Branch, 1200 District Avenue, Burlington, MA.
For information on the availability of this material at the FAA,
call 781-238-7759.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Exact source excerpt. Text positions 16622–17839, end exclusive, in the original decoded publication. SHA-256: e1eac1eb0340e9e711c7cfb0dd81c3d4f4b93770956ec6685667683b5c08a10c
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2018-07-17 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 683a0c51ab0cc4aada918b2ccf308d60c145ccc3181d0771eb0bdc1e6c23e250. Source manifest: 0e167db84629c9616b3763ad8cf00ccc605b1ee75b8268725a652e41f52d1341.
Official source · 2018-04-12
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 83, Number 71 (Thursday, April 12, 2018)]
[Rules and Regulations]
[Pages 15731-15733]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-07541]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
========================================================================
Federal Register / Vol. 83, No. 71 / Thursday, April 12, 2018 / Rules
and Regulations
[[Page 15731]]
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2018-0184; Product Identifier 2018-NE-07-AD; Amendment
39-19248; AD 2018-07-17]
RIN 2120-AA64
Airworthiness Directives; Safran Helicopter Engines, S.A.,
Turboshaft Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule; request for comments.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for certain
Safran Helicopter Engines, S.A., Arrius 2B1, 2B1A, 2B2, and 2K1
turboshaft engines. This AD requires inspecting the power turbine wheel
(PTW) assembly and replacing the PTW if the turbine blade dampers are
found missing. This AD was prompted by the manufacturer reporting a
number of PTW assemblies may have been assembled without the blade
dampers. We are issuing this AD to address the unsafe condition on
these products.
DATES: This AD becomes effective April 27, 2018.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of April 27,
2018.
We must receive comments on this AD by May 29, 2018.
ADDRESSES: You may send comments, using the procedures found in 14 CFR
11.43 and 11.45, by any of the following methods:
<bullet> Federal eRulemaking Portal: Go to http://www.regulations.gov. Follow the instructions for submitting comments.
<bullet> Fax: 202-493-2251.
<bullet> Mail: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE, Washington, DC 20590
<bullet> Hand Delivery: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE, Washington, DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays.
For service information identified in this final rule, contact
Safran Helicopter Engines, S.A., 40220 Tarnos, France; phone: (33) 05
59 74 40 00; fax: (33) 05 59 74 45 15. You may view this service
information at the FAA, Engine & Propeller Standards Branch, 1200
District Avenue, Burlington, MA 01803. For information on the
availability of this material at the FAA, call 781-238-7759. It is also
available on the internet at http://www.regulations.gov by searching
for and locating Docket No. FAA-2018-0184.
Examining the AD Docket
You may examine the AD docket on the internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2018-
0184; or in person at Docket Operations between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays. The AD docket contains
this final rule, the mandatory continuing airworthiness information
(MCAI), the regulatory evaluation, any comments received, and other
information. The street address for Docket Operations (phone: 800-647-
5527) is listed above. Comments will be available in the AD docket
shortly after receipt.
FOR FURTHER INFORMATION CONTACT: Robert Green, Aerospace Engineer, ECO
Branch, FAA, 1200 District Avenue, Burlington, MA 01803; phone: 781-
238-7754; fax: 781-238-7199; email: [email protected].
SUPPLEMENTARY INFORMATION:
Discussion
The European Aviation Safety Agency (EASA), which is the Technical
Agent for the Member States of the European Community, has issued EASA
AD 2018-0044, dated February 14, 2018 (referred to after this as the
MCAI), to address an unsafe condition for the specified products. The
MCAI states:
During an ARRIUS 2B2 engine ground run check, the ``Degrade''
indicator illuminated and unusual vibration occurred. At the same
time, bluish smoke and debris came out of the exhaust pipe. Both
engines were shut down without further occurrences.
Investigations at Safran Helicopter Engines revealed that
missing dampers on the PTW assembly caused rupture of PTW blades.
Further investigations identified a batch of potentially affected
PTW.
The dampers on the PTW blades reduce the mechanical stress
exerted on the blades. With no dampers, mechanical stress on the
blades can exceed the vibratory fatigue limit, eventually leading to
rupture of the blades.
This condition, if not corrected, could lead to In Flight Shut
Down and release of low energy debris through exhaust pipe,
potentially resulting in forced landing, damage to the helicopter
and injury to occupants.
To address this potential unsafe condition, Safran Helicopter
Engines issued the SB to provide instructions for inspection and PTW
replacement.
For the reasons described above, this [EASA] AD requires
replacement of potentially affected PTWs with serviceable parts.
You may obtain further information by examining the MCAI in the AD
docket on the internet at http://www.regulations.gov by searching for
and locating Docket No. FAA-2018-0184.
Related Service Information Under 1 CFR Part 51
We reviewed Safran Helicopter Engines Alert Mandatory Service
Bulletin (MSB) No. A319 72 2854, Version A, dated February 9, 2018. The
MSB describes procedures for replacing the PTW. This service
information is reasonably available because the interested parties have
access to it through their normal course of business or by the means
identified in the ADDRESSES section.
FAA's Determination
This product has been approved by France and is approved for
operation in the United States. Pursuant to our bilateral agreement
with the European Community, EASA has notified us of the unsafe
condition described in the MCAI and service information referenced
above. We are issuing this AD because we evaluated all the relevant
information provided by EASA and determined the unsafe condition
described previously is likely to exist or develop in other products of
the same type design.
[[Page 15732]]
AD Requirements
This AD requires inspecting the PTW assembly and replacing the PTW
if the turbine blade dampers are found missing.
FAA's Justification and Determination of the Effective Date
An unsafe condition exists that requires the immediate adoption of
this AD without providing an opportunity for public comments prior to
adoption. The FAA has found that the risk to the flying public
justifies waiving notice and comment prior to adoption of this rule
because the compliance time for the action is less than the time
required for public comment. EASA made a determination of an unsafe
condition warranting regulatory action and compliance within 20 flight
hours or 30 days. Therefore, we find good cause that notice and
opportunity for prior public comment are impracticable. In addition,
for the reason stated above, we find that good cause exists for making
this amendment effective in less than 30 days.
Comments Invited
This AD is a final rule that involves requirements affecting flight
safety and was not preceded by notice and an opportunity for public
comment. However, we invite you to send any written data, views, or
arguments about this final rule. Send your comments to an address
listed under the ADDRESSES section. Include the docket number FAA-2018-
0184 and Product Identifier 2018-NE-07-AD at the beginning of your
comments. We specifically invite comments on the overall regulatory,
economic, environmental, and energy aspects of this final rule. We will
consider all comments received by the closing date and may amend this
final rule because of those comments.
We will post all comments we receive, without change, to http://www.regulations.gov, including any personal information you provide. We
will also post a report summarizing each substantive verbal contact we
receive about this final rule.
Costs of Compliance
We estimate that this AD affects 46 engines installed on
helicopters of U.S. registry.
We estimate the following costs to comply with this AD:
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Cost per Cost on U.S.
Action Labor cost Parts cost product operators
----------------------------------------------------------------------------------------------------------------
Records Search........................ 1 work-hour x $85 per $0 $85 $3,910
hour = $85.
----------------------------------------------------------------------------------------------------------------
We estimate the following costs to do any necessary replacements
that would be required based on the results of the mandated inspection.
We have no way of determining the number of aircraft that might need
these replacements:
On-Condition Costs
----------------------------------------------------------------------------------------------------------------
Cost per
Action Labor cost Parts cost product
----------------------------------------------------------------------------------------------------------------
PTW replacement............................... 16 work-hours x $85 per hour = $16,500 $17,860
$1,360.
----------------------------------------------------------------------------------------------------------------
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
This AD is issued in accordance with authority delegated by the
Executive Director, Aircraft Certification Service, as authorized by
FAA Order 8000.51C. In accordance with that order, issuance of ADs is
normally a function of the Compliance and Airworthiness Division, but
during this transition period, the Executive Director has delegated the
authority to issue ADs applicable to engines, propellers, and
associated appliances to Manager, Engine and Propeller Standards
Branch, Policy and Innovation Division.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
[[Page 15733]]
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2018-07-17 Safran Helicopter Engines (Type Certificate previously
held by Turbomeca, S.A.): Amendment 39-19248; Docket No. FAA-2018-
0184; Product Identifier 2018-NE-07-AD.
(a) Effective Date
This AD is effective April 27, 2018.
(b) Affected ADs
None.
(c) Applicability
This AD applies to Safran Helicopter Engines, S.A., Arrius 2B1,
2B1A, 2B2, and 2K1 turboshaft engines with a power turbine wheel
(PTW) assembly having a serial number listed in Appendix 2.1 of
Safran Helicopter Engines Mandatory Service Bulletin (MSB) No. A319
72 2854, Version A, dated February 9, 2018.
(d) Subject
Joint Aircraft System Component (JASC) Code 7250, Turbine
Section.
(e) Unsafe Condition
This AD was prompted by an engine failure caused by missing
turbine blade dampers. We are issuing this AD to prevent failure of
a power turbine blade. The unsafe condition, if not addressed, could
result in loss of engine power in flight and reduced control of the
helicopter.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Required Actions
Within 20 flight hours or 30 days after the effective date of
this AD, whichever occurs first:
(1) Inspect the PTW in accordance with paragraph 2.4.2.3 of
Safran Helicopter Engines MSB No. A319 72 2854, Version A, dated
February 9, 2018; and
(2) If, as a result of the inspection required by paragraph
(g)(1) of this AD, any dampers are found missing, replace the PTW
with a part eligible for installation before further flight.
(h) Installation Prohibition
Do not install an engine with a PTW with a serial number listed
in Appendix 2.1 of Safran Helicopter Engines MSB A319 72 2854,
Version A, dated February 9, 2018, unless all thirty-one blade
dampers are installed.
(i) Alternative Methods of Compliance (AMOCs)
(1) The Manager, ECO Branch, FAA, has the authority to approve
AMOCs for this AD, if requested using the procedures found in 14 CFR
39.19. In accordance with 14 CFR 39.19, send your request to your
principal inspector or local Flight Standards District Office, as
appropriate. If sending information directly to the manager of the
certification office, send it to the attention of the person
identified in paragraph (j)(1) of this AD. You may email your
request to: [email protected].
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(j) Related Information
(1) For more information about this AD, contact Robert Green,
Aerospace Engineer, ECO Branch, FAA, 1200 District Avenue,
Burlington, MA 01803; phone: 781-238-7754; fax: 781-238-7199; email:
[email protected].
(2) Refer to European Aviation Safety Agency (EASA) AD 2018-
0044, dated February 14, 2018, for more information. You may examine
the EASA AD in the AD docket on the internet at http://www.regulations.gov by searching for and locating it in Docket No.
FAA-2018-0184.
(k) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Safran Helicopter Engines Alert Mandatory Service Bulletin
No. A319 72 2854, Version A, dated February 9, 2018.
(ii) Reserved.
(3) For Safran Helicopter Engines service information identified
in this AD, contact Safran Helicopter Engines, S.A., 40220 Tarnos,
France; phone: (33) 05 59 74 40 00; fax: (33) 05 59 74 45 15.
(4) You may view this service information at FAA, Engine &
Propeller Standards Branch, 1200 District Avenue, Burlington, MA.
For information on the availability of this material at the FAA,
call 781-238-7759.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued in Burlington, Massachusetts, on April 6, 2018.
Robert J. Ganley,
Manager, Engine and Propeller Standards Branch, Aircraft Certification
Service.
[FR Doc. 2018-07541 Filed 4-11-18; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T02:14:58.145939+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 0a8f71e519f1569a670e23eba453e0aeafca29e67f2606c3360c9824637cb421
- Text SHA-256
- 683a0c51ab0cc4aada918b2ccf308d60c145ccc3181d0771eb0bdc1e6c23e250
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.