Back to publication catalog

Published 2020-07-07 · Federal Register document 2020-14458

Airworthiness Directives; General Electric Company Turbofan Engines

Publication summary

The FAA is superseding Airworthiness Directive (AD) 2005-23-09 for all General Electric Company (GE) CF6-80E1A1, -80E1A2, -80E1A3, - 80E1A4, and -80E1A4/B model turbofan engines. AD 2005-23-09 required initial and repetitive fluorescent-penetrant inspections (FPI) of certain areas of high-pressure compressor (HPC) cases, part number (P/ N) 1509M97G07 and P/N 2083M69G03. This AD requires an update of the Airworthiness Limitations Section (ALS) of GE Engine Manual GEK99376 and the operator's existing continuous airworthiness maintenance program (CAMP). This AD was prompted by GE performed an updated lifing analysis on the HPC case. As a result, GE found additional locations on the cases requiring FPI, revised the inspection interval for performing FPI of the existing location, and added an additional P/N HPC case that requires inspection. The FAA is issuing this AD to address the unsafe condition on these products.

Why this record is shown

Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:24:04.586324+00:00. The title, summary and date are source facts.

Source revision
federal_register_ad_metadata_2020-f01fbc4d7ab3dbaa
Source row
results[171]
Raw source SHA-256
f01fbc4d7ab3dbaae6a412acd9ff6cece48db77a6a882e46e8f8087200be3837

Final-rule publication

Recorded publication clauses

AD identifier printed in this edition
2020-13-08
Effective date printed in this edition
2020-08-11
Read 10 complete recorded clauses
Effective Date
(a) Effective Date

    This AD is effective August 11, 2020.

Exact source excerpt. Text positions 9704–9767, end exclusive, in the original decoded publication. SHA-256: e9874628048409f59f6c245922984a181437fd6ecb6b46a296dffe9f630df76e

Affected ADs
(b) Affected ADs

    This AD replaces AD 2005-23-09, Amendment 39-14367 (70 FR 67901, 
November 9, 2005).

Exact source excerpt. Text positions 9767–9875, end exclusive, in the original decoded publication. SHA-256: 0696729b7019acdc5c9babb63699f611b971c51c3bc17dd7f9f72ff2b02204c5

Applicability wording · Applicability
(c) Applicability

    This AD applies to General Electric Company (GE) CF6-80E1A1, -
80E1A2,

[[Page 40588]]

 -80E1A3, -80E1A4, and -80E1A4/B model turbofan engines.

Exact source excerpt. Text positions 9875–10044, end exclusive, in the original decoded publication. SHA-256: 6907f13cb058f294b751e585dc705b1a5be9ac95e91fb2e0c9e215def47fd9b0

Subject
(d) Subject

    Joint Aircraft System Component (JASC) Code 7230, Turbine Engine 
Compressor Section.

Exact source excerpt. Text positions 10044–10148, end exclusive, in the original decoded publication. SHA-256: 151db2778cdfea7f0edc36f3dc91c040e977d403cabb29f1bb70ebf8781db722

Unsafe Condition
(e) Unsafe Condition

    This AD was prompted by GE performing an updated lifing analysis 
on the high-pressure compressor (HPC) case. Based on this analysis, 
GE found new locations on the case that require fluorescent 
penetrant inspection (FPI), identified a new inspection interval for 
the existing FPI location, and added another part-numbered HPC case 
that requires inspection. The FAA is issuing this AD to prevent 
failure of the HPC case. The unsafe condition, if not addressed, 
could result in uncontained release of the HPC case, engine fire, 
and damage to the airplane.

Exact source excerpt. Text positions 10148–10736, end exclusive, in the original decoded publication. SHA-256: 80aa8498214ebfb4686726c475fc7d19c0412d5a0019b573ec916cc44be2f1fe

Compliance
(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

Exact source excerpt. Text positions 10736–10838, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3

Required Actions
(g) Required Actions

    Within 180 days after the effective date of this AD, replace 
TASK 05-21-02-200-001 in GE CF6-80E1 Engine Manual GEK99376 and the 
operator's existing continuous airworthiness maintenance program 
with TASK 05-21-02-200-001, dated September 15, 2015, from ESM 05-
21-02, Life Limits 001 High Pressure Compressor HPC--Scheduled 
Maintenance Checks, of the GE CF6-80E1 Engine Manual GEK99376, 
Revision 48, dated September 15, 2019.

Exact source excerpt. Text positions 10838–11296, end exclusive, in the original decoded publication. SHA-256: a693e133425925bf34c686976af4c401146ff924b67f7f946a0eaf0831b04efb

Alternative Methods of Compliance (AMOCs)
(h) Alternative Methods of Compliance (AMOCs)

    (1) The Manager, ECO Branch, FAA, has the authority to approve 
AMOCs for this AD, if requested using the procedures found in 14 CFR 
39.19. In accordance with 14 CFR 39.19, send your request to your 
principal inspector or local Flight Standards District Office, as 
appropriate. If sending information directly to the manager of the 
certification office, send it to the attention of the person 
identified in paragraph (i) of this AD. You may email your request 
to: [email protected].
    (2) Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office.

Exact source excerpt. Text positions 11296–12054, end exclusive, in the original decoded publication. SHA-256: fa2859c8aad85bad6bce35c9c0e59d7eb7be201f9be7bcc12897531b560332e3

Related Information
(i) Related Information

    For more information about this AD, contact Scott Stevenson, 
Aerospace Engineer, ECO Branch, FAA, 1200 District Avenue, 
Burlington, MA 01803; phone: 781-238-7132; fax: 781-238-7199; email: 
[email protected].

Exact source excerpt. Text positions 12054–12295, end exclusive, in the original decoded publication. SHA-256: 58b7ee432fac54637ed994a83036f380fcc9b69f2ba2c7f4b9afb433402e5bc4

Material Incorporated by Reference
(j) Material Incorporated by Reference

    (1) The Director of the Federal Register approved the 
incorporation by reference (IBR) of the service information listed 
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
    (2) You must use this service information as applicable to do 
the actions required by this AD, unless the AD specifies otherwise.
    (i) TASK 05-21-02-200-001, dated September 15, 2015, from ESM 
05-21-02, Life Limits 001 High Pressure Compressor HPC--Scheduled 
Maintenance Checks, of the GE CF6-80E1 Engine Manual GEK99376, 
Revision 48, dated September 15, 2019.
    (ii) [Reserved]
    (3) For GE service information identified in this AD, contact 
General Electric Company, GE Aviation, Room 285, 1 Neumann Way, 
Cincinnati, OH 45215; phone: 513-552-3272; email: 
[email protected].
    (4) You may view this service information at FAA, Airworthiness 
Products Section, Operational Safety Branch, 1200 District Avenue, 
Burlington, MA 01803. For information on the availability of this 
material at the FAA, call 781-238-7759.
    (5) You may view this service information that is incorporated 
by reference at the National Archives and Records Administration 
(NARA). For information on the availability of this material at 
NARA, email [email protected], or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html.

Exact source excerpt. Text positions 12295–13666, end exclusive, in the original decoded publication. SHA-256: df5c423aa8850388314441ba5262af98de1879e141ead47d2feffecc0f2bb18c

Explicit historical replacement wording

Find all recorded historical references to AD 2020-13-08 · 0 printed reference observations in this pinned collection.

These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.

Why these observations are shown

They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.

Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 72a448baf3d0d85ce7b8e0ce642668fef0e6276100d95c7310a7f90b2cf6d8c5. Source manifest: 19f5e3576d2910ac248fd8b75632fa781386af33282648f5cf56a260d1218744.

Official source · 2020-07-07

Publication text

This is the complete recorded text of this dated publication.

Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.

Read the complete official publication text
[Federal Register Volume 85, Number 130 (Tuesday, July 7, 2020)]
[Rules and Regulations]
[Pages 40586-40588]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-14458]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2019-0800; Project Identifier 2005-NE-24-AD; Amendment 
39-21153; AD 2020-13-08]
RIN 2120-AA64


Airworthiness Directives; General Electric Company Turbofan 
Engines

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2005-23-09 
for all General Electric Company (GE) CF6-80E1A1, -80E1A2, -80E1A3, -
80E1A4, and -80E1A4/B model turbofan engines. AD 2005-23-09 required 
initial and repetitive fluorescent-penetrant inspections (FPI) of 
certain areas of high-pressure compressor (HPC) cases, part number (P/
N) 1509M97G07 and P/N 2083M69G03. This AD requires an update of the 
Airworthiness Limitations Section (ALS) of GE Engine Manual GEK99376 
and the operator's existing continuous airworthiness maintenance 
program (CAMP). This AD was prompted by GE performed an updated lifing 
analysis on the HPC case. As a result, GE found additional locations on 
the cases requiring FPI, revised the inspection interval for performing 
FPI of the existing location, and added an additional P/N HPC case that 
requires inspection. The FAA is issuing this AD to address the unsafe 
condition on these products.

DATES: This AD is effective August 11, 2020.
    The Director of the Federal Register approved the incorporation by 
reference of a certain publication listed in this AD as of August 11, 
2020.

ADDRESSES: For service information identified in this final rule, 
contact General Electric Company, GE Aviation, Room 285, 1 Neumann Way, 
Cincinnati, OH, 45215; phone: 513-552-3272; email: 
[email protected]. You may view this service information at 
the FAA, Airworthiness Products Section, Operational Safety Branch, 
1200 District Avenue, Burlington, MA, 01803. For information on the 
availability of this material at the FAA, call 781-238-7759. It is also 
available on the internet at https://www.regulations.gov by searching 
for and locating Docket No. FAA-2019-0800.

Examining the AD Docket

    You may examine the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2019-
0800; or in person at Docket Operations between 9 a.m. and 5 p.m., 
Monday through Friday, except Federal holidays. The AD docket contains 
this final rule, the regulatory evaluation, any comments received, and 
other information. The address for Docket Operations is U.S. Department 
of Transportation, Docket Operations, M-30, West Building Ground Floor, 
Room W12-140, 1200 New Jersey Avenue SE, Washington, DC 20590.

FOR FURTHER INFORMATION CONTACT: Scott Stevenson, Aerospace Engineer, 
ECO Branch, FAA, 1200 District Avenue, Burlington, MA, 01803; phone: 
(781) 238-7132; fax: (781) 238-7199; email: [email protected].

SUPPLEMENTARY INFORMATION:

Discussion

    The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 
CFR part 39 to supersede AD 2005-23-09, Amendment 39-14367 (70 FR 
67901, November 9, 2005), (``AD 2005-23-09''). AD 2005-23-09 applied to 
all GE CF6-80E1A1, -80E1A2, -80E1A3, -80E1A4, and -80E1A4/B model 
turbofan engines. The NPRM published in the Federal Register on January 
21, 2020 (85 FR 3284). The NPRM was prompted by GE performing an 
updated lifing analysis on the HPC case. As a result, GE found 
additional locations on the cases

[[Page 40587]]

requiring FPI, revised the inspection interval for performing FPI of 
the existing location, and added an additional P/N HPC case that 
requires inspection. The NPRM proposed to require an update of the ALS 
of GE Engine Manual GEK99376 and the operator's existing CAMP. The FAA 
is issuing this AD to address the unsafe condition on these products.

Comments

    The FAA gave the public the opportunity to participate in 
developing this AD. The following presents the comments received on the 
NPRM and the FAA's response to each comment.

Request for Clarification on Task Referenced in AD

    EASA and Delta Airlines (Delta) requested clarification on whether 
TASK 05-21-02-200-001, dated September 15, 2015, referenced in the AD 
and in the docket, should be from Revision 47 or from Revision 48 of GE 
CF6-80E1 Engine Manual GEK99376, dated September 15, 2019 (``GE Engine 
Manual''). Delta further questioned whether the task should have the 
same date as the GE Engine Manual.
    The FAA agrees that TASK 05-21-02-200-001, dated September 15, 
2015, in Revision 48 of the GE Engine Manual is referenced correctly in 
this AD. The FAA notes that the task has a different date than the GE 
Engine Manual and the task is dated correctly in the NPRM. This task 
from Revision 48 of the GE Engine Manual will be uploaded to the docket 
upon publication of the final rule.

Request To Include Reference to Later Revisions of Engine Manual

    Delta requested that the FAA include a reference to ``and later 
approved revisions'' when referencing the GE Engine Manual in paragraph 
(g) of this AD.
    The FAA disagrees because later revisions of the GE Engine Manual 
cannot be referenced in an AD.

Support for the AD

    The Air Line Pilots Association, International, expressed support 
for the AD as written.

Conclusion

    The FAA reviewed the relevant data, considered the comments 
received, and determined that air safety and the public interest 
require adopting this AD as proposed.

Related Service Information Under 1 CFR Part 51

    The FAA reviewed TASK 05-21-02-200-001, dated September 15, 2015, 
from ESM 05-21-02, Life Limits 001 High Pressure Compressor HPC--
Scheduled Maintenance Checks, of the GE CF6-80E1 Engine Manual 
GEK99376, Revision 48, dated September 15, 2019. The service 
information describes procedures for performing FPIs of the HPC case. 
This service information is reasonably available because the interested 
parties have access to it through their normal course of business or by 
the means identified in the ADDRESSES section.

Costs of Compliance

    The FAA estimates that this AD affects 20 engines installed on 
airplanes of U.S. registry.
    The FAA estimates the following costs to comply with this AD:

                                                 Estimated Costs
----------------------------------------------------------------------------------------------------------------
                                                                                     Cost per      Cost on U.S.
                Action                         Labor cost           Parts cost        product        operators
----------------------------------------------------------------------------------------------------------------
Update ALS of Engine Manual...........  2 work-hours x $85 per                $0            $170          $3,400
                                         hour = $170.
----------------------------------------------------------------------------------------------------------------

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, Section 106, describes the 
authority of the FAA Administrator. Subtitle VII, Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    The FAA is issuing this rulemaking under the authority described in 
Subtitle VII, Part A, Subpart III, Section 44701, ``General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    The FAA has determined that this AD will not have federalism 
implications under Executive Order 13132. This AD will not have a 
substantial direct effect on the States, on the relationship between 
the national government and the States, or on the distribution of power 
and responsibilities among the various levels of government.
    For the reasons discussed above, I certify that this AD:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866,
    (2) Will not affect intrastate aviation in Alaska, and
    (3) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13   [Amended]

0
2. The FAA amends Sec.  39.13 by:
0
a. Removing Airworthiness Directive (AD) 2005-23-09, Amendment 39-14367 
(70 FR 67901, November 9, 2005); and
0
b. Adding the following new AD:

2020-13-08 General Electric Company: Amendment 39-21153; Docket No. 
FAA-2019-0800; Project Identifier 2005-NE-24-AD.

(a) Effective Date

    This AD is effective August 11, 2020.

(b) Affected ADs

    This AD replaces AD 2005-23-09, Amendment 39-14367 (70 FR 67901, 
November 9, 2005).

(c) Applicability

    This AD applies to General Electric Company (GE) CF6-80E1A1, -
80E1A2,

[[Page 40588]]

 -80E1A3, -80E1A4, and -80E1A4/B model turbofan engines.

(d) Subject

    Joint Aircraft System Component (JASC) Code 7230, Turbine Engine 
Compressor Section.

(e) Unsafe Condition

    This AD was prompted by GE performing an updated lifing analysis 
on the high-pressure compressor (HPC) case. Based on this analysis, 
GE found new locations on the case that require fluorescent 
penetrant inspection (FPI), identified a new inspection interval for 
the existing FPI location, and added another part-numbered HPC case 
that requires inspection. The FAA is issuing this AD to prevent 
failure of the HPC case. The unsafe condition, if not addressed, 
could result in uncontained release of the HPC case, engine fire, 
and damage to the airplane.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Required Actions

    Within 180 days after the effective date of this AD, replace 
TASK 05-21-02-200-001 in GE CF6-80E1 Engine Manual GEK99376 and the 
operator's existing continuous airworthiness maintenance program 
with TASK 05-21-02-200-001, dated September 15, 2015, from ESM 05-
21-02, Life Limits 001 High Pressure Compressor HPC--Scheduled 
Maintenance Checks, of the GE CF6-80E1 Engine Manual GEK99376, 
Revision 48, dated September 15, 2019.

(h) Alternative Methods of Compliance (AMOCs)

    (1) The Manager, ECO Branch, FAA, has the authority to approve 
AMOCs for this AD, if requested using the procedures found in 14 CFR 
39.19. In accordance with 14 CFR 39.19, send your request to your 
principal inspector or local Flight Standards District Office, as 
appropriate. If sending information directly to the manager of the 
certification office, send it to the attention of the person 
identified in paragraph (i) of this AD. You may email your request 
to: [email protected].
    (2) Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office.

(i) Related Information

    For more information about this AD, contact Scott Stevenson, 
Aerospace Engineer, ECO Branch, FAA, 1200 District Avenue, 
Burlington, MA 01803; phone: 781-238-7132; fax: 781-238-7199; email: 
[email protected].

(j) Material Incorporated by Reference

    (1) The Director of the Federal Register approved the 
incorporation by reference (IBR) of the service information listed 
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
    (2) You must use this service information as applicable to do 
the actions required by this AD, unless the AD specifies otherwise.
    (i) TASK 05-21-02-200-001, dated September 15, 2015, from ESM 
05-21-02, Life Limits 001 High Pressure Compressor HPC--Scheduled 
Maintenance Checks, of the GE CF6-80E1 Engine Manual GEK99376, 
Revision 48, dated September 15, 2019.
    (ii) [Reserved]
    (3) For GE service information identified in this AD, contact 
General Electric Company, GE Aviation, Room 285, 1 Neumann Way, 
Cincinnati, OH 45215; phone: 513-552-3272; email: 
[email protected].
    (4) You may view this service information at FAA, Airworthiness 
Products Section, Operational Safety Branch, 1200 District Avenue, 
Burlington, MA 01803. For information on the availability of this 
material at the FAA, call 781-238-7759.
    (5) You may view this service information that is incorporated 
by reference at the National Archives and Records Administration 
(NARA). For information on the availability of this material at 
NARA, email [email protected], or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html.

    Issued on June 17, 2020.
Gaetano A. Sciortino,
Deputy Director for Strategic Initiatives, Compliance & Airworthiness 
Division, Aircraft Certification Service.
[FR Doc. 2020-14458 Filed 7-6-20; 8:45 am]
BILLING CODE 4910-13-P


Why this text is shown

The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T01:58:06.776464+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.

Open the captured official edition

Source SHA-256
50f25fb8b4ae27d654d8b329a4c0e1b946ff35174681dc89e8bc5142976c286d
Text SHA-256
72a448baf3d0d85ce7b8e0ce642668fef0e6276100d95c7310a7f90b2cf6d8c5

Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence

Coverage and limits

These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.

The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.