Published 2021-02-23 · Federal Register document 2021-03571
Airworthiness Directives; General Electric Company Turbofan Engines
Publication summary
The FAA is adopting a new airworthiness directive (AD) for all General Electric Company (GE) GEnx-1B64, -1B64/P1, -1B64/P2, -1B67, - 1B67/P1, -1B67/P2, -1B70, -1B70/75/P1, -1B70/75/P2, -1B70/P1, -1B70/P2, -1B70C/P1, -1B70C/P2, -1B74/75/P1, -1B74/75/P2, -1B76/P2, and -1B76A/P2 model turbofan engines. This AD was prompted by a report of a crack in the outer fuel manifold causing fuel leakage. This AD requires initial and repetitive visual inspections of the cushioned loop clamp (p-clamp) and, depending on the results of the inspection, a spot fluorescent penetrant inspection (FPI) of the outer fuel manifold. Depending on the results of the FPI, this AD may require replacement of the outer fuel manifold. This AD also requires initial and repetitive replacements of the p-clamp. The FAA is issuing this AD to address the unsafe condition on these products.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:24:08.106391+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2021-9c919420683447c6
- Source row
- results[28]
- Raw source SHA-256
- 9c919420683447c683ad0c877cb886e341c11862be32b47c536a001b1d76dcb5
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2021-02-07
- Effective date printed in this edition
- 2021-03-30
Read 12 complete recorded clauses
Effective Date
(a) Effective Date
This airworthiness directive (AD) is effective March 30, 2021.
Exact source excerpt. Text positions 15051–15139, end exclusive, in the original decoded publication. SHA-256: 087f383195bc14e4a241c4813339221d56260da7a0c6cd3e562ab4754df348e0
Affected ADs
(b) Affected ADs
None.
Exact source excerpt. Text positions 15139–15168, end exclusive, in the original decoded publication. SHA-256: 871a4afc60ceeae06e8010585055188633d616078500c45937092bfe892239c0
Applicability wording · Applicability
(c) Applicability
This AD applies to all General Electric Company (GE) GEnx-1B64,
-1B64/P1, -1B64/P2, -1B67, -1B67/P1, -1B67/P2, -1B70, -1B70/75/P1, -
1B70/75/P2, -1B70/P1, -1B70/P2, -1B70C/P1, -1B70C/P2, -1B74/75/P1, -
1B74/75/P2, -1B76/P2, and -1B76A/P2 model turbofan engines.
Exact source excerpt. Text positions 15168–15455, end exclusive, in the original decoded publication. SHA-256: 98fe72d36327c0cde69bf937739e6a75fc9ab406c596a932dcc3468b9cf3ccc3
Subject
(d) Subject
Joint Aircraft System Component (JASC) Code 7310, Engine Fuel
Distribution.
Exact source excerpt. Text positions 15455–15550, end exclusive, in the original decoded publication. SHA-256: d298616c97b6f2ebd60bb29ad0c187d876045042f2df7e4050f2edda0510d347
Unsafe Condition
(e) Unsafe Condition
This AD was prompted by a report of a crack in the outer fuel
manifold causing fuel leakage. The FAA is issuing this AD to prevent
failure of the outer fuel manifold. The unsafe condition, if not
addressed, could result in engine fire and damage to the airplane.
Exact source excerpt. Text positions 15550–15843, end exclusive, in the original decoded publication. SHA-256: 82aa830242ca690f35f070226f04fe8fd8a8cd13913c2de19942f8aeb1bce84c
Compliance
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
Exact source excerpt. Text positions 15843–15945, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3
Required Actions
(g) Required Actions
(1) Within 500 flight cycles (FCs) after the effective date of
this AD, perform a visual inspection of the cushioned loop clamp (p-
clamp), significant item number (SIN) 34282, to verify the p-clamp
is undamaged and installed.
(i) Thereafter, perform the visual inspection required by (g)(1)
of this AD at intervals not to exceed 500 FCs since the last
inspection.
(ii) [Reserved]
(2) If, during any visual inspection required by paragraphs
(g)(1) or (g)(1)(i) of this AD, the p-clamp (SIN 34282) is outside
of the limits in paragraph 3.B.(4) of GE GEnx-1B Service Bulletin
(SB) 73-0080 R01, dated August 29, 2019, or if the p-clamp (SIN
[[Page 10799]]
34282) is missing, perform a spot fluorescent penetrant inspection
of the outer fuel manifold, part number (P/N) 2403M46G01, SIN 34302,
using Accomplishment Instructions, paragraph 3.B.(4)(b), of GE GEnx-
1B SB 73-0080 R01, dated August 29, 2019.
(i) If a crack or a sign of fuel leakage is found, before
further flight, remove the outer fuel manifold, P/N 2403M46G01, SIN
34302, from service and replace with a part eligible for
installation.
(ii) [Reserved]
(3) Within 500 FCs after the effective date of this AD, and
thereafter at intervals not to exceed 500 FCs from the last p-clamp
replacement, replace the p-clamp (SIN 34282) with a new p-clamp (SIN
34282). Complete this required action after performing the visual
inspections required by paragraphs (g)(1) and (g)(1)(i) of this AD.
Exact source excerpt. Text positions 15945–17458, end exclusive, in the original decoded publication. SHA-256: 6adeb8f9b7ef6b39e54c7e6b752597a53be4746cf331c3892e3bf51758594d5b
Definition
(h) Definition
For the purpose of this AD, a p-clamp is a clamp, P/N J1432P12,
with SIN 34282, located at the signal fuel tube hose, SIN 34200, as
shown in Accomplishment Instructions, paragraph 3, Figure 1, ``Outer
Fuel Manifold and Clamp Location,'' of GE GEnx-1B SB 73-0080 R01,
dated August 29, 2019.
Exact source excerpt. Text positions 17458–17773, end exclusive, in the original decoded publication. SHA-256: 00cc2df22c0fe829e5ec81fec8f0dacf8a7963af930ee1c545f6f2beeb080848
No Repair Requirement
(i) No Repair Requirement
Sending a removed outer fuel manifold for repair, as set forth
in the Accomplishment Instructions, paragraph 3.B.(4)(b), of GE
GEnx-1B SB 73-0080 R01, dated August 29, 2019, is not required by
this AD.
Exact source excerpt. Text positions 17773–18010, end exclusive, in the original decoded publication. SHA-256: 6f7a1983dcf6603e5c00b17903b0d288e2cc79ec989e3a06cb893f7a38cace26
Alternative Methods of Compliance (AMOCs)
(j) Alternative Methods of Compliance (AMOCs)
(1) The Manager, ECO Branch, FAA, has the authority to approve
AMOCs for this AD, if requested using the procedures found in 14 CFR
39.19. In accordance with 14 CFR 39.19, send your request to your
principal inspector or local Flight Standards District Office, as
appropriate. If sending information directly to the manager of the
certification office, send it to the attention of the person
identified in Related Information. You may email your request to:
[email protected].
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
Exact source excerpt. Text positions 18010–18763, end exclusive, in the original decoded publication. SHA-256: 63d761639459fba92ad3cfa351f51c1dcfb63e83169885acd0cdb099cfc4e03b
Related Information
(k) Related Information
For more information about this AD, contact Mehdi Lamnyi,
Aviation Safety Engineer, ECO Branch, FAA, 1200 District Avenue,
Burlington, MA 01803; phone: (781) 238-7743; fax: (781) 238-7199;
email: [email protected].
Exact source excerpt. Text positions 18763–19011, end exclusive, in the original decoded publication. SHA-256: 3fd6122622d82659c2a63a6688ab7f45205013ba00633424a80cad8d05173b9d
Material Incorporated by Reference
(l) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) General Electric Company (GE) GEnx-1B Service Bulletin 73-
0080 R01, dated August 29, 2019.
(ii) [Reserved]
(3) For GE service information identified in this AD, contact
General Electric Company, 1 Neumann Way, Cincinnati, OH 45215;
phone: (513) 552-3272; email: [email protected];
website: www.ge.com.
(4) You may view this service information at FAA, Airworthiness
Products Section, Operational Safety Branch, 1200 District Avenue,
Burlington, MA 01803. For information on the availability of this
material at the FAA, call (781) 238-7759.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, email: [email protected], or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html.
Exact source excerpt. Text positions 19011–20248, end exclusive, in the original decoded publication. SHA-256: 2e8578e80ff47d2a0d3c66fc4497e07d22d531eaebe4a0370e4f829ef9b3e7fc
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2021-02-07 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 852bd2822ba610e368368589375396cae47cc190bb40ac4e586603d26c6fab03. Source manifest: 9d5e2c1e072f603f9ce0bbfd3acbeede2394f756c5fb8b53856061a71b7c7fdb.
Official source · 2021-02-23
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 86, Number 34 (Tuesday, February 23, 2021)]
[Rules and Regulations]
[Pages 10796-10799]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03571]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2020-0653; Project Identifier AD-2020-00631-E;
Amendment 39-21390; AD 2021-02-07]
RIN 2120-AA64
Airworthiness Directives; General Electric Company Turbofan
Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for all
General Electric Company (GE) GEnx-1B64, -1B64/P1, -1B64/P2, -1B67, -
1B67/P1, -1B67/P2, -1B70, -1B70/75/P1, -1B70/75/P2, -1B70/P1, -1B70/P2,
-1B70C/P1, -1B70C/P2, -1B74/75/P1, -1B74/75/P2, -1B76/P2, and -1B76A/P2
model turbofan engines. This AD was prompted by a report of a crack in
the outer fuel manifold causing fuel leakage. This AD requires initial
and repetitive visual inspections of the cushioned loop clamp (p-clamp)
and, depending on the results of the inspection, a spot fluorescent
penetrant inspection (FPI) of the outer fuel manifold. Depending on the
results of the FPI, this AD may require replacement of the outer fuel
manifold. This AD also requires initial and repetitive replacements of
the p-clamp. The FAA is issuing this AD to address the unsafe condition
on these products.
DATES: This AD is effective March 30, 2021.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of March 30,
2021.
ADDRESSES: For service information identified in this final rule,
contact General Electric Company, 1 Neumann Way, Cincinnati, OH 45215;
phone: (513) 552-3272; email: [email protected]; website:
www.ge.com. You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 1200
District Avenue, Burlington, MA 01803. For information on the
availability of this material at the FAA, call (781) 238-7759. It is
also available at https://www.regulations.gov by searching for and
locating Docket No. FAA-2020-0653.
Examining the AD Docket
You may examine the AD docket at https://www.regulations.gov by
searching for and locating Docket No. FAA-2020-0653; or in person at
Docket Operations between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays. The AD docket contains this final rule, any
comments received, and other information. The address for Docket
Operations is U.S. Department of Transportation, Docket Operations, M-
30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue
SE, Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Mehdi Lamnyi, Aviation Safety
Engineer, ECO Branch, FAA, 1200 District Avenue, Burlington, MA 01803;
phone: (781) 238-7743; fax: (781) 238-7199; email:
[email protected].
SUPPLEMENTARY INFORMATION:
Background
The FAA issued a notice of proposed rulemaking (NPRM) to amend 14
CFR part 39 by adding an AD that would
[[Page 10797]]
apply to all GE GEnx-1B64, -1B64/P1, -1B64/P2, -1B67, -1B67/P1, -1B67/
P2, -1B70, -1B70/75/P1, -1B70/75/P2, -1B70/P1, -1B70/P2, -1B70C/P1, -
1B70C/P2, -1B74/75/P1, -1B74/75/P2, -1B76/P2, and -1B76A/P2 model
turbofan engines. The NPRM published in the Federal Register on July
20, 2020 (85 FR 43752). The NPRM was prompted by a report of a crack in
the outer fuel manifold causing fuel leakage. In the NPRM, the FAA
proposed to require initial and repetitive visual inspections of the p-
clamp and, depending on the results of the inspection, a spot FPI of
the outer fuel manifold. Depending on the results of the FPI, the NPRM
proposed to require replacement of the outer fuel manifold. The NPRM
also proposed to require initial and repetitive replacements of the p-
clamp. The FAA is issuing this AD to address the unsafe condition on
these products.
Discussion of Final Airworthiness Directive
Comments
The FAA received comments from six commenters. The commenters were
Air Lines Pilots Association, International (ALPA); American Airlines
(AAL); Boeing Commercial Airplanes (Boeing); GE Aviation (GE);
Ethiopian Airlines; and United Airlines (UAL). One commenter requested
changes to paragraph (g), Required Actions, of this AD and to On-
Condition Costs. Two commenters requested a change to compliance that
was not implemented. Two commenters requested clarification of the AD
requirements. Four of the six commenters expressed support for the AD.
The following presents the comments received on the NPRM and the FAA's
response to each comment.
Request To Add Affected P-Clamp Significant Item Number (SIN)
GE requested that the FAA update paragraph (g), Required Actions,
of this AD to include the affected p-clamp SIN when the p-clamp is
referenced. GE recognized that the p-clamp SIN is defined in paragraph
(h), Definition, of this AD. However, GE reasoned that as there are
multiple p-clamps to be inspected per GEnx-1B Engine Manual, 05-21-00,
MANDATORY INSPECTION, listing the p-clamp SIN in paragraph (g) of this
AD avoids confusion.
The FAA agrees to include the p-clamp SIN in paragraph (g) of this
AD.
Request To Update On-Condition Cost
GE requested that the FAA revise the replacement of the outer fuel
manifold in On-Condition Costs from 250 work hours to 2 work hours. GE
reasoned that GE GEnx-1B Service Bulletin (SB) 73-0080 R01, dated
August 29, 2019, references GE GEnx-1B SB 73-0053 for instructions to
replace the outer fuel manifold. GE noted that GE GEnx-1B SB 73-0053
estimates that two hours are needed to replace the outer fuel manifold.
GE stated that the discrepancy between the NPRM and service information
could cause confusion or lead operators to opt to remove the engine to
perform the outer fuel manifold replacement.
The FAA agrees. The FAA changed the estimated labor hours for
replacing the outer fuel manifold in the On-Condition Costs section of
this AD from 250 work hours to 2 work hours. The FAA also changed the
estimated cost per product for replacing the outer fuel manifold in the
On-Condition Costs section of this AD from $39,650 to $18,570, which
reflects the reduction in labor hours.
Request To Allow Use of Later Revisions of Service Information
AAL and UAL requested that the FAA add the phrase ``or later'' when
referencing the service information in this AD. AAL stated that the
manufacturer indicated that the service information is intended only to
be a containment measure. Specifying ``or later'' could prevent
numerous requests for Alternative Methods of Compliance if the
manufacturer revises the service information. UAL stated that the
manufacturer is developing a terminating action and, as a result, a
revision to the service information is expected.
The FAA disagrees with adding language that allows the use of later
revisions of the service information when performing the required
actions of this AD. Later revisions of the service information have not
been published by the manufacturer or reviewed by the FAA.
Request To Clarify Sending the Outer Fuel Manifold for Repair
AAL requested that the FAA clarify if the removed outer fuel
manifold needs to be sent for repair. AAL cited references within
paragraph 3.B.(4)(b) of GE GEnx-1B SB 73-0080 R01, dated August 29,
2019, that instructs operators to send removed outer fuel manifolds for
repair.
The FAA agrees that sending a removed outer fuel manifold for
repair, as stated in paragraph 3.B.(4)(b) of GE GEnx-1B SB 73-0080 R01,
dated August 29, 2019, is not mandated by this AD. This AD addresses
the unsafe condition by requiring the removal of an outer fuel manifold
if a crack or a sign of leakage is found and replacing it with a part
eligible for installation. This AD does not require sending an outer
fuel manifold removed in accordance with paragraph (g)(2)(i) of this AD
for repair. The FAA clarified this by adding paragraph (i), No Repair
Requirement, to this AD.
Request To Clarify if Need To Comply Again
Ethiopian Airlines asked if operators who inspected and replaced
the affected p-clamp using GE GEnx-1B SB 73-0080 R01, dated August 29,
2019, before the effective date of this AD, need to comply again.
If operators performed the initial visual inspection and
replacement of the p-clamp as required by paragraphs (g)(1) and (3) of
this AD before the effective date of this AD, then these actions meet
the initial visual inspection and replacement requirements of this AD.
Paragraph (f), Compliance, of this AD requires compliance with this AD
within the times specified, unless already done. If the initial visual
inspection and replacement of the p-clamp was already performed prior
to the effective date of this AD, operators must perform the repetitive
inspections, follow-on-actions, and replacements of the p-clamp
required by paragraphs (g)(1)(i), (2), and (3) of this AD using the
stated compliance intervals.
Support for the AD
AAL, ALPA, Boeing, and UAL expressed support for the AD.
Conclusion
The FAA reviewed the relevant data, considered any comments
received, and determined that air safety requires adopting this AD as
proposed. Accordingly, the FAA is issuing this AD to address the unsafe
condition on these products. Except for minor editorial changes and any
other changes described previously, this AD is adopted as proposed in
the NPRM. None of the changes will increase the economic burden on any
operator.
Related Service Information Under 1 CFR Part 51
The FAA reviewed GE GEnx-1B SB 73-0080 R01, dated August 29, 2019.
This SB describes procedures for replacing the p-clamp located at the
signal fuel tube hose, SIN 34200, and instructions for removing the
signal fuel tube hose when a p-clamp is found damaged or missing. This
service information is reasonably available because the interested
parties have access to it through their normal course
[[Page 10798]]
of business or by the means identified in ADDRESSES.
Interim Action
The FAA considers this AD interim action. The manufacturer is still
reviewing this unsafe condition and may develop a terminating action.
Costs of Compliance
The FAA estimates that this AD affects 190 engines installed on
airplanes of U.S. registry.
The FAA estimates the following costs to comply with this AD:
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Cost per Cost on U.S.
Action Labor cost Parts cost product operators
----------------------------------------------------------------------------------------------------------------
Visually inspect the p-clamp.......... 0.25 work-hours x $85 $0 $21.25 $4,037.50
per hour = $21.25.
Replace the p-clamp................... 0.25 work-hours x $85 = 102 123.25 23,417.50
$21.25.
----------------------------------------------------------------------------------------------------------------
The FAA estimates the following costs to do any necessary FPIs and
replacements that are required based on the results of the visual
inspection. The agency has no way of determining the number of aircraft
that require FPI or replacement:
On-Condition Costs
----------------------------------------------------------------------------------------------------------------
Cost per
Action Labor cost Parts cost product
----------------------------------------------------------------------------------------------------------------
FPI the outer fuel manifold................... 2.5 work-hours x $85 per hour = $0 $212.50
$212.50.
Replace the outer fuel manifold............... 2 work-hours x $85 per hour = 18,400 18,570
$170.
----------------------------------------------------------------------------------------------------------------
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
The FAA is issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: General requirements.
Under that section, Congress charges the FAA with promoting safe flight
of civil aircraft in air commerce by prescribing regulations for
practices, methods, and procedures the Administrator finds necessary
for safety in air commerce. This regulation is within the scope of that
authority because it addresses an unsafe condition that is likely to
exist or develop on products identified in this rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Will not affect intrastate aviation in Alaska, and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
The Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive:
2021-02-07 General Electric Company: Amendment 39-21390; Docket No.
FAA-2020-0653; Project Identifier AD-2020-00631-E.
(a) Effective Date
This airworthiness directive (AD) is effective March 30, 2021.
(b) Affected ADs
None.
(c) Applicability
This AD applies to all General Electric Company (GE) GEnx-1B64,
-1B64/P1, -1B64/P2, -1B67, -1B67/P1, -1B67/P2, -1B70, -1B70/75/P1, -
1B70/75/P2, -1B70/P1, -1B70/P2, -1B70C/P1, -1B70C/P2, -1B74/75/P1, -
1B74/75/P2, -1B76/P2, and -1B76A/P2 model turbofan engines.
(d) Subject
Joint Aircraft System Component (JASC) Code 7310, Engine Fuel
Distribution.
(e) Unsafe Condition
This AD was prompted by a report of a crack in the outer fuel
manifold causing fuel leakage. The FAA is issuing this AD to prevent
failure of the outer fuel manifold. The unsafe condition, if not
addressed, could result in engine fire and damage to the airplane.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Required Actions
(1) Within 500 flight cycles (FCs) after the effective date of
this AD, perform a visual inspection of the cushioned loop clamp (p-
clamp), significant item number (SIN) 34282, to verify the p-clamp
is undamaged and installed.
(i) Thereafter, perform the visual inspection required by (g)(1)
of this AD at intervals not to exceed 500 FCs since the last
inspection.
(ii) [Reserved]
(2) If, during any visual inspection required by paragraphs
(g)(1) or (g)(1)(i) of this AD, the p-clamp (SIN 34282) is outside
of the limits in paragraph 3.B.(4) of GE GEnx-1B Service Bulletin
(SB) 73-0080 R01, dated August 29, 2019, or if the p-clamp (SIN
[[Page 10799]]
34282) is missing, perform a spot fluorescent penetrant inspection
of the outer fuel manifold, part number (P/N) 2403M46G01, SIN 34302,
using Accomplishment Instructions, paragraph 3.B.(4)(b), of GE GEnx-
1B SB 73-0080 R01, dated August 29, 2019.
(i) If a crack or a sign of fuel leakage is found, before
further flight, remove the outer fuel manifold, P/N 2403M46G01, SIN
34302, from service and replace with a part eligible for
installation.
(ii) [Reserved]
(3) Within 500 FCs after the effective date of this AD, and
thereafter at intervals not to exceed 500 FCs from the last p-clamp
replacement, replace the p-clamp (SIN 34282) with a new p-clamp (SIN
34282). Complete this required action after performing the visual
inspections required by paragraphs (g)(1) and (g)(1)(i) of this AD.
(h) Definition
For the purpose of this AD, a p-clamp is a clamp, P/N J1432P12,
with SIN 34282, located at the signal fuel tube hose, SIN 34200, as
shown in Accomplishment Instructions, paragraph 3, Figure 1, ``Outer
Fuel Manifold and Clamp Location,'' of GE GEnx-1B SB 73-0080 R01,
dated August 29, 2019.
(i) No Repair Requirement
Sending a removed outer fuel manifold for repair, as set forth
in the Accomplishment Instructions, paragraph 3.B.(4)(b), of GE
GEnx-1B SB 73-0080 R01, dated August 29, 2019, is not required by
this AD.
(j) Alternative Methods of Compliance (AMOCs)
(1) The Manager, ECO Branch, FAA, has the authority to approve
AMOCs for this AD, if requested using the procedures found in 14 CFR
39.19. In accordance with 14 CFR 39.19, send your request to your
principal inspector or local Flight Standards District Office, as
appropriate. If sending information directly to the manager of the
certification office, send it to the attention of the person
identified in Related Information. You may email your request to:
[email protected].
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(k) Related Information
For more information about this AD, contact Mehdi Lamnyi,
Aviation Safety Engineer, ECO Branch, FAA, 1200 District Avenue,
Burlington, MA 01803; phone: (781) 238-7743; fax: (781) 238-7199;
email: [email protected].
(l) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) General Electric Company (GE) GEnx-1B Service Bulletin 73-
0080 R01, dated August 29, 2019.
(ii) [Reserved]
(3) For GE service information identified in this AD, contact
General Electric Company, 1 Neumann Way, Cincinnati, OH 45215;
phone: (513) 552-3272; email: [email protected];
website: www.ge.com.
(4) You may view this service information at FAA, Airworthiness
Products Section, Operational Safety Branch, 1200 District Avenue,
Burlington, MA 01803. For information on the availability of this
material at the FAA, call (781) 238-7759.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, email: [email protected], or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued on January 8, 2021.
Lance T. Gant,
Director, Compliance & Airworthiness Division, Aircraft Certification
Service.
[FR Doc. 2021-03571 Filed 2-22-21; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T01:53:49.441007+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 3e38cb3241ef41e54f6652e0ad8edf6b1b2c3bda130b03bccaa7ee535591e9ac
- Text SHA-256
- 852bd2822ba610e368368589375396cae47cc190bb40ac4e586603d26c6fab03
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.