Published 2022-09-15 · Federal Register document 2022-19900
Airworthiness Directives; The Boeing Company Airplanes
Publication summary
The FAA is adopting a new airworthiness directive (AD) for all The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747SR, and 747SP series airplanes. This AD was prompted by significant changes, including new or more restrictive requirements, made to the airworthiness limitations (AWLs) related to fuel tank ignition prevention. This AD requires revising the existing maintenance or inspection program, as applicable, to incorporate the latest revision of the AWLs. The FAA is issuing this AD to address the unsafe condition on these products.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:24:11.345539+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2022-c0cc5a172b1306fa
- Source row
- results[295]
- Raw source SHA-256
- c0cc5a172b1306fa2cd8dc66863122ada13332e685d87687bd0becf2dab37a5e
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2022-17-03
- Effective date printed in this edition
- 2022-10-20
Read 14 complete recorded clauses
Effective Date
(a) Effective Date
This airworthiness directive (AD) is effective October 20, 2022.
Exact source excerpt. Text positions 7923–8013, end exclusive, in the original decoded publication. SHA-256: 5bf50176d95577518fd6aa8ec6ac9ab8881040156a84b2b327dec8e724198570
Affected ADs
(b) Affected ADs
This AD affects the ADs specified in paragraphs (b)(1) through
(7) of this AD.
(1) AD 2008-10-07 R1, Amendment 39-16070 (74 FR 56098, October
30, 2009) (AD 2008-10-07 R1).
(2) AD 2008-18-09, Amendment 39-15666 (73 FR 52911, September
12, 2008) (AD 2008-18-09).
(3) AD 2010-13-12, Amendment 39-16343 (75 FR 37997, July 1,
2010) (AD 2010-13-12).
(4) AD 2010-24-13, Amendment 39-16532 (75 FR 78591, December 16,
2010; corrected May 25, 2011 (76 FR 30253)) (AD 2010-24-13).
(5) AD 2011-06-03, Amendment 39-16627 (76 FR 15814, March 22,
2011) (AD 2011-06-03).
(6) AD 2014-15-14, Amendment 39-17916 (79 FR 45324, August 5,
2014) (AD 2014-15-14).
(7) AD 2016-19-03, Amendment 39-18652 (81 FR 65872, September
26, 2016) (AD 2016-19-03).
Exact source excerpt. Text positions 8013–8801, end exclusive, in the original decoded publication. SHA-256: a705ebf074cf41e6160110c17b388ee88ab77bce4b43aee557b3a0ec669a2709
Applicability wording · Applicability
(c) Applicability
This AD applies to all The Boeing Company Model 747-100, 747-
100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747SR,
and 747SP series airplanes, certificated in any category.
Exact source excerpt. Text positions 8801–9012, end exclusive, in the original decoded publication. SHA-256: d05d3263f011ebdd452b1bed45edf32f4335c26c9ca82607c80552d3cea91d49
Subject
(d) Subject
Air Transport Association (ATA) of America Code 28, Fuel.
Exact source excerpt. Text positions 9012–9088, end exclusive, in the original decoded publication. SHA-256: 6111602521633281b663b982f9d7970bbd75c93ea6c799bbb174e2608c77dd8a
Unsafe Condition
(e) Unsafe Condition
This AD was prompted by significant changes, including new or
more restrictive requirements, made to the airworthiness limitations
(AWLs) related to fuel tank ignition prevention. The FAA is issuing
this AD to address the potential for ignition sources inside fuel
tanks caused by latent failures, alterations, repairs, or
maintenance actions, which, in combination with flammable fuel
vapors, could result in a fuel tank explosion and consequent loss of
the airplane.
Exact source excerpt. Text positions 9088–9591, end exclusive, in the original decoded publication. SHA-256: bb7040b912b337bb4d8c3190f221b8c964c0b88027c42d6c9ea09b33b7eac777
Compliance
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
Exact source excerpt. Text positions 9591–9693, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3
Maintenance or Inspection Program Revision
(g) Maintenance or Inspection Program Revision
Within 60 days after the effective date of this AD, revise the
existing maintenance or inspection program, as applicable, to
incorporate the information specified in Boeing 747-100/200/300/SP/
SR Airworthiness Limitations (AWLs) and Certification Maintenance
Requirements (CMRs), D6-13747-CMR, dated September 2020, except as
specified in paragraphs (h) and (i) of this AD. The initial
compliance times for the airworthiness limitation instruction (ALI)
tasks are within the applicable compliance times for each AWL number
specified in paragraphs (g)(1) through (8) of this AD:
(1) For AWL No. 28-AWL-01, ``External Wires Over Center Fuel
Tank'': At the applicable time specified in paragraph (g)(1)(i) or
(ii) of this AD.
[[Page 56575]]
(i) For airplanes that did not have any version of AWL No. 28-
AWL-01 in the existing maintenance or inspection program before the
effective date of this AD: Within 144 months since issuance of the
original airworthiness certificate or original export certificate,
or within 12 months after the effective date of this AD, whichever
occurs later.
(ii) For airplanes not identified in paragraph (g)(1)(i) of this
AD: Within 144 months since AWL No. 28-AWL-01 was incorporated into
the existing maintenance or inspection program, or within 144 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-01, whichever occurs later.
(2) For 28-AWL-03, ``Fuel Quantity Indicating System (FQIS)--Out
Tank Wiring Lightning Shield to Ground Termination'': At the
applicable time specified in paragraph (g)(2)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-03 in the existing maintenance or inspection program before the
effective date of this AD: Within 144 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 12 months after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(2)(i) of this
AD: Within 144 months since AWL No. 28-AWL-03 was incorporated into
the existing maintenance or inspection program, or within 144 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-03, whichever occurs later.
(3) For 28-AWL-09, ``Over-Current and Arcing Protection
Electrical Design Features Operation--Fault Current Detector for
Center Tank Override/Jettison (O/J) Pumps'': At the applicable time
specified in paragraph (g)(3)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-09 in the existing maintenance or inspection program before the
effective date of this AD: Within 18 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 90 days after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(3)(i) of this
AD: Within 18 months since AWL No. 28-AWL-09 was incorporated into
the existing maintenance or inspection program, or within 18 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-09, whichever occurs later.
(4) For AWL No. 28-AWL-13, ``Main Tank, Center Wing Tank, Body
Tank (if installed), and Auxiliary Tank (if installed) Refuel Valve
Installation--Fault Current Bond'': At the applicable time specified
in paragraph (g)(4)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-13 in the existing maintenance or inspection program before the
effective date of this AD: Within 144 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 12 months after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(4)(i) of this
AD: Within 144 months since AWL No. 28-AWL-13 was incorporated into
the existing maintenance or inspection program, or within 144 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-13, whichever occurs later.
(5) For AWL No. 28-AWL-22, ``Center Tank Override/Jettison Fuel
Pump Inlet Protection and Power Failed On Protection System'': At
the applicable time specified in paragraph (g)(5)(i) or (ii) of this
AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-22 in the existing maintenance or inspection program before the
effective date of this AD: Within 12 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 90 days after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(5)(i) of this
AD: Within 12 months since AWL No. 28-AWL-22 was incorporated into
the existing maintenance or inspection program, or within 12 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-22, whichever occurs later.
(6) For AWL No. 28-AWL-23, ``Over-Current and Arcing Protection
Electrical Design Features Operation--Main Tank AC Fuel Pump and
Center Tank Scavenge AC Fuel Pump Ground Fault Interrupter (GFI)'':
At the applicable time specified in paragraph (g)(6)(i) or (ii) of
this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-23 in the existing maintenance or inspection program before the
effective date of this AD: Within 12 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, within 12 months since Boeing Service Bulletin 747-
28A2261 was incorporated, or within 90 days after the effective date
of this AD, whichever occurs latest.
(ii) For airplanes not identified in paragraph (g)(6)(i) of this
AD: Within 12 months since AWL No. 28-AWL-23 was incorporated into
the existing maintenance or inspection program, or within 12 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-23, whichever occurs later.
(7) For AWL No. 28-AWL-25, ``Cushion Clamps and Teflon Sleeving
Installed on Out-of-Tank Wire Bundles Installed on Brackets that are
Mounted Directly on the Fuel Tanks'': At the applicable time
specified in paragraph (g)(7)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-25 in the existing maintenance or inspection program before the
effective date of this AD: Within 144 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 12 months after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(7)(i) of this
AD: Within 144 months since AWL No. 28-AWL-25 was incorporated into
the existing maintenance or inspection program, within 144 months
since Boeing Special Attention Service Bulletin 747-57-2327 was
incorporated, or within 144 months after the most recent inspection
was performed as specified in AWL No. 28-AWL-25, whichever occurs
latest.
(8) For AWL No. 28-AWL-31, ``Reserve Tank Refuel Valve
Installation--Lightning Protection Electrical Bond'': At the
applicable time specified in paragraph (g)(8)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-31 in the existing maintenance or inspection program before the
effective date of this AD: Within 72 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 6 months after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(8)(i) of this
AD: Within 72 months since AWL No. 28-AWL-31 was incorporated into
the existing maintenance or inspection program, or within 72 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-31, whichever occurs later.
Exact source excerpt. Text positions 9693–17773, end exclusive, in the original decoded publication. SHA-256: d0dd2999c3db5cf13dbb09f7af7ea8822f40c235e9bd723c18dd9ebf5bbc8682
Differences From the Required Service Information
(h) Differences From the Required Service Information
(1) Where the ``Applicability'' column of AWL Nos. 28-AWL-25 and
28-AWL-27 specifies ``ALL'' and ``NOTE,'' replace that text with
``Airplanes L/N 645 and on.''
(2) In the ``Description'' column of AWL Nos. 28-AWL-25 and 28-
AWL-27, remove the Applicability Note.
Exact source excerpt. Text positions 17773–18102, end exclusive, in the original decoded publication. SHA-256: dded9674ea346b808a6d045fa3966bf5b5622e854bc51eee72f6e5b7e3ce8051
Additional Acceptable Wire Types and Sleeving
(i) Additional Acceptable Wire Types and Sleeving
(1) Where AWL No. 28-AWL-11 identifies wire types BMS 13-48, BMS
13-58, and BMS 13-60, the following wire types are acceptable: MIL-
W-22759/16, SAE AS22759/16 (M22759/16), MIL-W-22759/32, SAE AS22759/
32 (M22759/32), MIL-W-22759/34, SAE AS22759/34 (M22759/34), MIL-W-
22759/41, SAE AS22759/41 (M22759/41), MIL-W-22759/86, SAE AS22759/86
(M22759/86), MIL-W-22759/87, SAE AS22759/87 (M22759/87), MIL-W-
22759/92, and SAE AS22759/92 (M22759/92); and MIL-C-27500 and NEMA
WC 27500 cables constructed from these military or SAE specification
wire types, as applicable.
(2) Where AWL No. 28-AWL-11 identifies TFE-2X Standard wall for
wire sleeving, the following sleeving materials are acceptable:
Roundit 2000NX and Varglas Type HO, HP, or HM.
Exact source excerpt. Text positions 18102–18908, end exclusive, in the original decoded publication. SHA-256: b90612ba2e265e3db68dbcc0aa17e20563803bec5cf462af18221d5bd2f9817e
No Alternative Actions, Intervals, or Critical Design Configuration Control Limitations (CDCCLs)
(j) No Alternative Actions, Intervals, or Critical Design Configuration
Control Limitations (CDCCLs)
After the existing maintenance or inspection program has been
revised as required by paragraph (g) of this AD, no alternative
actions (e.g., inspections), intervals, or CDCCLs may be used unless
the actions, intervals, and CDCCLs are approved as an alternative
method of compliance (AMOC) in accordance with the procedures
specified in paragraph (l) of this AD.
Exact source excerpt. Text positions 18908–19383, end exclusive, in the original decoded publication. SHA-256: 3a558fde3e40a84cb736e6b4e612d02ae660e438c3fece486b093198b4afd1a5
Terminating Action for Certain ADs
(k) Terminating Action for Certain ADs
Accomplishment of the revision required by paragraph (g) of this
AD terminates the
[[Page 56576]]
requirements specified in paragraphs (k)(1) through (7) of this AD
for that airplane:
(1) The revision required by paragraphs (g) and (h) of AD 2008-
10-07 R1.
(2) The revision required by paragraph (g)(1) of AD 2008-18-09.
(3) The revision required by paragraph (h)(2) of AD 2010-13-12.
(4) The revision required by paragraph (h) of AD 2010-24-13.
(5) The revision required by paragraph (k) of AD 2011-06-03.
(6) The revision required by paragraph (h)(2) of AD 2014-15-14.
(7) The revision required by paragraph (h) of AD 2016-19-03.
Exact source excerpt. Text positions 19383–20093, end exclusive, in the original decoded publication. SHA-256: 4d1430a6f754f6793951a8a767ed0f8241b2660edcf1da61da005b6b4f3b447d
Alternative Methods of Compliance (AMOCs)
(l) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Seattle ACO Branch, FAA, has the authority to
approve AMOCs for this AD, if requested using the procedures found
in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request
to your principal inspector or responsible Flight Standards Office,
as appropriate. If sending information directly to the manager of
the certification office, send it to the attention of the person
identified in paragraph (m) of this AD. Information may be emailed
to: [email protected].
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the responsible Flight Standards Office.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair, modification, or alteration required by this AD
if it is approved by The Boeing Company Organization Designation
Authorization (ODA) that has been authorized by the Manager, Seattle
ACO Branch, FAA, to make those findings. To be approved, the repair
method, modification deviation, or alteration deviation must meet
the certification basis of the airplane, and the approval must
specifically refer to this AD.
Exact source excerpt. Text positions 20093–21321, end exclusive, in the original decoded publication. SHA-256: ee214530a161fca8ecc759b9b1f61894c8ff35a1acc39b8a6b27d468b2c58f3e
Related Information
(m) Related Information
For more information about this AD, contact Samuel Dorsey,
Aerospace Engineer, Propulsion Section, FAA, Seattle ACO Branch,
2200 South 216th St., Des Moines, WA 98198; phone and fax: 206-231-
3415; email: [email protected].
Exact source excerpt. Text positions 21321–21577, end exclusive, in the original decoded publication. SHA-256: 84b4ed3b455cf5e354fc793898fe83cc1cb210f7f9c913d65c747b0ed3d214dd
Material Incorporated by Reference
(n) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Boeing 747-100/200/300/SP/SR Airworthiness Limitations
(AWLs) and Certification Maintenance Requirements (CMRs), D6-13747-
CMR, dated September 2020.
(ii) [Reserved]
(3) For service information identified in this AD, contact
Boeing Commercial Airplanes, Attention: Contractual & Data Services
(C&DS), 2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 90740-
5600; phone: 562-797-1717; internet: https://www.myboeingfleet.com.
(4) You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200
South 216th St., Des Moines, WA. For information on the availability
of this material at the FAA, call 206-231-3195.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, [email protected], or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html.
Exact source excerpt. Text positions 21577–22928, end exclusive, in the original decoded publication. SHA-256: aad0ccf40436a9919b54213e6c57518e54a7b0a196d3c0045156667a481ac0bf
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2022-17-03 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 1e156637d04ab51491af6957450672336f4d4a3545b921d174cfa6b63b4d114d. Source manifest: e9e5c3f20e25236dbdab552504bffaf3c1b7fd544a107032d7141b04fb4f1df1.
Official source · 2022-09-15
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 87, Number 178 (Thursday, September 15, 2022)]
[Rules and Regulations]
[Pages 56573-56576]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-19900]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2022-0520; Project Identifier AD-2021-00683-T;
Amendment 39-22141; AD 2022-17-03]
RIN 2120-AA64
Airworthiness Directives; The Boeing Company Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for all
The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B,
747-200C, 747-200F, 747-300, 747SR, and 747SP series airplanes. This AD
was prompted by significant changes, including new or more restrictive
requirements, made to the airworthiness limitations (AWLs) related to
fuel tank ignition prevention. This AD requires revising the existing
maintenance or inspection program, as applicable, to incorporate the
latest revision of the AWLs. The FAA is issuing this AD to address the
unsafe condition on these products.
DATES: This AD is effective October 20, 2022.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of October 20,
2022.
ADDRESSES: For service information identified in this final rule,
contact Boeing Commercial Airplanes, Attention: Contractual & Data
Services (C&DS), 2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA
90740-5600; phone: 562-797-1717; internet: https://www.myboeingfleet.com. You may view this service information at the
FAA, Airworthiness Products Section, Operational Safety Branch, 2200
South 216th St., Des Moines, WA. For information on the availability of
this material at the FAA, call 206-231-3195. It is also available at
https://www.regulations.gov by searching for and locating Docket No.
FAA-2022-0520.
Examining the AD Docket
You may examine the AD docket at https://www.regulations.gov by
searching for and locating Docket No. FAA-2022-0520; or in person at
Docket Operations between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays. The AD docket contains this final rule, any
comments received, and other information. The address for Docket
Operations is U.S. Department of Transportation, Docket Operations, M-
30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue
SE, Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Samuel Dorsey, Aerospace Engineer,
Propulsion Section, FAA, Seattle ACO Branch, 2200 South 216th St., Des
Moines, WA 98198; phone and fax: 206-231-3415; email:
[email protected].
SUPPLEMENTARY INFORMATION:
Background
The FAA issued a notice of proposed rulemaking (NPRM) to amend 14
CFR part 39 by adding an AD that would apply to all The Boeing Company
Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F,
747-300, 747SR, and 747SP series airplanes. The NPRM published in the
Federal Register on June 2, 2022 (87 FR 33451). The NPRM was prompted
by significant changes, including new or more restrictive requirements,
made to the AWLs related to fuel tank ignition prevention. In the NPRM,
the FAA proposed to require revising the existing maintenance or
inspection program, as applicable, to incorporate the latest revision
of the AWLs. The FAA is issuing this AD to address the potential for
ignition sources inside fuel tanks caused by latent failures,
alterations, repairs, or maintenance actions, which, in combination
with flammable fuel vapors, could result in a fuel tank explosion and
consequent loss of the airplane.
[[Page 56574]]
Discussion of Final Airworthiness Directive
Comments
The FAA received comments from the Air Line Pilots Association,
International (ALPA) and Boeing who supported the NPRM without change.
Conclusion
The FAA reviewed the relevant data, considered the comments
received, and determined that air safety requires adopting this AD as
proposed. Except for minor editorial changes, this AD is adopted as
proposed in the NPRM. None of the changes will increase the economic
burden on any operator.
Related Service Information Under 1 CFR Part 51
The FAA reviewed Boeing 747-100/200/300/SP/SR Airworthiness
Limitations (AWLs) and Certification Maintenance Requirements (CMRs),
D6-13747-CMR, dated September 2020. This service information describes
AWLs that include airworthiness limitation instructions (ALIs) and
critical design configuration control limitations (CDCCLs) tasks
related to fuel tank ignition prevention. This service information is
reasonably available because the interested parties have access to it
through their normal course of business or by the means identified in
ADDRESSES.
Costs of Compliance
The FAA estimates that this AD affects 39 airplanes of U.S.
registry. The FAA estimates the following costs to comply with this AD:
The FAA has determined that revising the existing maintenance or
inspection program takes an average of 90 work-hours per operator,
although the agency recognizes that this number may vary from operator
to operator. Since operators incorporate maintenance or inspection
program changes for their affected fleet(s), the FAA has determined
that a per-operator estimate is more accurate than a per-airplane
estimate. Therefore, the FAA estimates the average total cost per
operator to be $7,650 (90 work-hours x $85 per work-hour).
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
The FAA is issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: General requirements.
Under that section, Congress charges the FAA with promoting safe flight
of civil aircraft in air commerce by prescribing regulations for
practices, methods, and procedures the Administrator finds necessary
for safety in air commerce. This regulation is within the scope of that
authority because it addresses an unsafe condition that is likely to
exist or develop on products identified in this rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Will not affect intrastate aviation in Alaska, and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
The Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive:
2022-17-03 The Boeing Company: Amendment 39-22141; Docket No. FAA-
2022-0520; Project Identifier AD-2021-00683-T.
(a) Effective Date
This airworthiness directive (AD) is effective October 20, 2022.
(b) Affected ADs
This AD affects the ADs specified in paragraphs (b)(1) through
(7) of this AD.
(1) AD 2008-10-07 R1, Amendment 39-16070 (74 FR 56098, October
30, 2009) (AD 2008-10-07 R1).
(2) AD 2008-18-09, Amendment 39-15666 (73 FR 52911, September
12, 2008) (AD 2008-18-09).
(3) AD 2010-13-12, Amendment 39-16343 (75 FR 37997, July 1,
2010) (AD 2010-13-12).
(4) AD 2010-24-13, Amendment 39-16532 (75 FR 78591, December 16,
2010; corrected May 25, 2011 (76 FR 30253)) (AD 2010-24-13).
(5) AD 2011-06-03, Amendment 39-16627 (76 FR 15814, March 22,
2011) (AD 2011-06-03).
(6) AD 2014-15-14, Amendment 39-17916 (79 FR 45324, August 5,
2014) (AD 2014-15-14).
(7) AD 2016-19-03, Amendment 39-18652 (81 FR 65872, September
26, 2016) (AD 2016-19-03).
(c) Applicability
This AD applies to all The Boeing Company Model 747-100, 747-
100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747SR,
and 747SP series airplanes, certificated in any category.
(d) Subject
Air Transport Association (ATA) of America Code 28, Fuel.
(e) Unsafe Condition
This AD was prompted by significant changes, including new or
more restrictive requirements, made to the airworthiness limitations
(AWLs) related to fuel tank ignition prevention. The FAA is issuing
this AD to address the potential for ignition sources inside fuel
tanks caused by latent failures, alterations, repairs, or
maintenance actions, which, in combination with flammable fuel
vapors, could result in a fuel tank explosion and consequent loss of
the airplane.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Maintenance or Inspection Program Revision
Within 60 days after the effective date of this AD, revise the
existing maintenance or inspection program, as applicable, to
incorporate the information specified in Boeing 747-100/200/300/SP/
SR Airworthiness Limitations (AWLs) and Certification Maintenance
Requirements (CMRs), D6-13747-CMR, dated September 2020, except as
specified in paragraphs (h) and (i) of this AD. The initial
compliance times for the airworthiness limitation instruction (ALI)
tasks are within the applicable compliance times for each AWL number
specified in paragraphs (g)(1) through (8) of this AD:
(1) For AWL No. 28-AWL-01, ``External Wires Over Center Fuel
Tank'': At the applicable time specified in paragraph (g)(1)(i) or
(ii) of this AD.
[[Page 56575]]
(i) For airplanes that did not have any version of AWL No. 28-
AWL-01 in the existing maintenance or inspection program before the
effective date of this AD: Within 144 months since issuance of the
original airworthiness certificate or original export certificate,
or within 12 months after the effective date of this AD, whichever
occurs later.
(ii) For airplanes not identified in paragraph (g)(1)(i) of this
AD: Within 144 months since AWL No. 28-AWL-01 was incorporated into
the existing maintenance or inspection program, or within 144 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-01, whichever occurs later.
(2) For 28-AWL-03, ``Fuel Quantity Indicating System (FQIS)--Out
Tank Wiring Lightning Shield to Ground Termination'': At the
applicable time specified in paragraph (g)(2)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-03 in the existing maintenance or inspection program before the
effective date of this AD: Within 144 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 12 months after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(2)(i) of this
AD: Within 144 months since AWL No. 28-AWL-03 was incorporated into
the existing maintenance or inspection program, or within 144 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-03, whichever occurs later.
(3) For 28-AWL-09, ``Over-Current and Arcing Protection
Electrical Design Features Operation--Fault Current Detector for
Center Tank Override/Jettison (O/J) Pumps'': At the applicable time
specified in paragraph (g)(3)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-09 in the existing maintenance or inspection program before the
effective date of this AD: Within 18 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 90 days after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(3)(i) of this
AD: Within 18 months since AWL No. 28-AWL-09 was incorporated into
the existing maintenance or inspection program, or within 18 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-09, whichever occurs later.
(4) For AWL No. 28-AWL-13, ``Main Tank, Center Wing Tank, Body
Tank (if installed), and Auxiliary Tank (if installed) Refuel Valve
Installation--Fault Current Bond'': At the applicable time specified
in paragraph (g)(4)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-13 in the existing maintenance or inspection program before the
effective date of this AD: Within 144 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 12 months after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(4)(i) of this
AD: Within 144 months since AWL No. 28-AWL-13 was incorporated into
the existing maintenance or inspection program, or within 144 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-13, whichever occurs later.
(5) For AWL No. 28-AWL-22, ``Center Tank Override/Jettison Fuel
Pump Inlet Protection and Power Failed On Protection System'': At
the applicable time specified in paragraph (g)(5)(i) or (ii) of this
AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-22 in the existing maintenance or inspection program before the
effective date of this AD: Within 12 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 90 days after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(5)(i) of this
AD: Within 12 months since AWL No. 28-AWL-22 was incorporated into
the existing maintenance or inspection program, or within 12 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-22, whichever occurs later.
(6) For AWL No. 28-AWL-23, ``Over-Current and Arcing Protection
Electrical Design Features Operation--Main Tank AC Fuel Pump and
Center Tank Scavenge AC Fuel Pump Ground Fault Interrupter (GFI)'':
At the applicable time specified in paragraph (g)(6)(i) or (ii) of
this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-23 in the existing maintenance or inspection program before the
effective date of this AD: Within 12 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, within 12 months since Boeing Service Bulletin 747-
28A2261 was incorporated, or within 90 days after the effective date
of this AD, whichever occurs latest.
(ii) For airplanes not identified in paragraph (g)(6)(i) of this
AD: Within 12 months since AWL No. 28-AWL-23 was incorporated into
the existing maintenance or inspection program, or within 12 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-23, whichever occurs later.
(7) For AWL No. 28-AWL-25, ``Cushion Clamps and Teflon Sleeving
Installed on Out-of-Tank Wire Bundles Installed on Brackets that are
Mounted Directly on the Fuel Tanks'': At the applicable time
specified in paragraph (g)(7)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-25 in the existing maintenance or inspection program before the
effective date of this AD: Within 144 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 12 months after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(7)(i) of this
AD: Within 144 months since AWL No. 28-AWL-25 was incorporated into
the existing maintenance or inspection program, within 144 months
since Boeing Special Attention Service Bulletin 747-57-2327 was
incorporated, or within 144 months after the most recent inspection
was performed as specified in AWL No. 28-AWL-25, whichever occurs
latest.
(8) For AWL No. 28-AWL-31, ``Reserve Tank Refuel Valve
Installation--Lightning Protection Electrical Bond'': At the
applicable time specified in paragraph (g)(8)(i) or (ii) of this AD.
(i) For airplanes that did not have any version of AWL No. 28-
AWL-31 in the existing maintenance or inspection program before the
effective date of this AD: Within 72 months since issuance of the
original airworthiness certificate or original export certificate of
airworthiness, or within 6 months after the effective date of this
AD, whichever occurs later.
(ii) For airplanes not identified in paragraph (g)(8)(i) of this
AD: Within 72 months since AWL No. 28-AWL-31 was incorporated into
the existing maintenance or inspection program, or within 72 months
after the most recent inspection was performed as specified in AWL
No. 28-AWL-31, whichever occurs later.
(h) Differences From the Required Service Information
(1) Where the ``Applicability'' column of AWL Nos. 28-AWL-25 and
28-AWL-27 specifies ``ALL'' and ``NOTE,'' replace that text with
``Airplanes L/N 645 and on.''
(2) In the ``Description'' column of AWL Nos. 28-AWL-25 and 28-
AWL-27, remove the Applicability Note.
(i) Additional Acceptable Wire Types and Sleeving
(1) Where AWL No. 28-AWL-11 identifies wire types BMS 13-48, BMS
13-58, and BMS 13-60, the following wire types are acceptable: MIL-
W-22759/16, SAE AS22759/16 (M22759/16), MIL-W-22759/32, SAE AS22759/
32 (M22759/32), MIL-W-22759/34, SAE AS22759/34 (M22759/34), MIL-W-
22759/41, SAE AS22759/41 (M22759/41), MIL-W-22759/86, SAE AS22759/86
(M22759/86), MIL-W-22759/87, SAE AS22759/87 (M22759/87), MIL-W-
22759/92, and SAE AS22759/92 (M22759/92); and MIL-C-27500 and NEMA
WC 27500 cables constructed from these military or SAE specification
wire types, as applicable.
(2) Where AWL No. 28-AWL-11 identifies TFE-2X Standard wall for
wire sleeving, the following sleeving materials are acceptable:
Roundit 2000NX and Varglas Type HO, HP, or HM.
(j) No Alternative Actions, Intervals, or Critical Design Configuration
Control Limitations (CDCCLs)
After the existing maintenance or inspection program has been
revised as required by paragraph (g) of this AD, no alternative
actions (e.g., inspections), intervals, or CDCCLs may be used unless
the actions, intervals, and CDCCLs are approved as an alternative
method of compliance (AMOC) in accordance with the procedures
specified in paragraph (l) of this AD.
(k) Terminating Action for Certain ADs
Accomplishment of the revision required by paragraph (g) of this
AD terminates the
[[Page 56576]]
requirements specified in paragraphs (k)(1) through (7) of this AD
for that airplane:
(1) The revision required by paragraphs (g) and (h) of AD 2008-
10-07 R1.
(2) The revision required by paragraph (g)(1) of AD 2008-18-09.
(3) The revision required by paragraph (h)(2) of AD 2010-13-12.
(4) The revision required by paragraph (h) of AD 2010-24-13.
(5) The revision required by paragraph (k) of AD 2011-06-03.
(6) The revision required by paragraph (h)(2) of AD 2014-15-14.
(7) The revision required by paragraph (h) of AD 2016-19-03.
(l) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Seattle ACO Branch, FAA, has the authority to
approve AMOCs for this AD, if requested using the procedures found
in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request
to your principal inspector or responsible Flight Standards Office,
as appropriate. If sending information directly to the manager of
the certification office, send it to the attention of the person
identified in paragraph (m) of this AD. Information may be emailed
to: [email protected].
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the responsible Flight Standards Office.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair, modification, or alteration required by this AD
if it is approved by The Boeing Company Organization Designation
Authorization (ODA) that has been authorized by the Manager, Seattle
ACO Branch, FAA, to make those findings. To be approved, the repair
method, modification deviation, or alteration deviation must meet
the certification basis of the airplane, and the approval must
specifically refer to this AD.
(m) Related Information
For more information about this AD, contact Samuel Dorsey,
Aerospace Engineer, Propulsion Section, FAA, Seattle ACO Branch,
2200 South 216th St., Des Moines, WA 98198; phone and fax: 206-231-
3415; email: [email protected].
(n) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Boeing 747-100/200/300/SP/SR Airworthiness Limitations
(AWLs) and Certification Maintenance Requirements (CMRs), D6-13747-
CMR, dated September 2020.
(ii) [Reserved]
(3) For service information identified in this AD, contact
Boeing Commercial Airplanes, Attention: Contractual & Data Services
(C&DS), 2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 90740-
5600; phone: 562-797-1717; internet: https://www.myboeingfleet.com.
(4) You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200
South 216th St., Des Moines, WA. For information on the availability
of this material at the FAA, call 206-231-3195.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, [email protected], or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued on August 4, 2022.
Christina Underwood,
Acting Director, Compliance & Airworthiness Division, Aircraft
Certification Service.
[FR Doc. 2022-19900 Filed 9-14-22; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T01:40:18.371867+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 791511d4432001ed3c083d84a63777b8afd90e9af885c5d980c104afeccec911
- Text SHA-256
- 1e156637d04ab51491af6957450672336f4d4a3545b921d174cfa6b63b4d114d
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.