Published 2023-11-20 · Federal Register document 2023-25494
Airworthiness Directives; MHI RJ Aviation ULC (Type Certificate Previously Held by Bombardier, Inc.) Airplanes
Publication summary
The FAA is adopting a new airworthiness directive (AD) for all MHI RJ Aviation ULC Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes. This AD was prompted by a report of missing insulation in the engine pylon area. This AD requires, for certain airplanes, inspecting the engine pylon structure for discrepancies and repair if necessary. This AD also requires revising the existing maintenance or inspection program, as applicable, to incorporate a new certification maintenance requirement (CMR) task. The FAA is issuing this AD to address the unsafe condition on these products.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:24:14.395624+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2023-81e907e5105d0f2c
- Source row
- results[301]
- Raw source SHA-256
- 81e907e5105d0f2c522e15b6fa8c7277117367b7f70b363862619549836b75e8
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2023-21-12
- Effective date printed in this edition
- 2023-12-26
Read 13 complete recorded clauses
Effective Date
(a) Effective Date
This airworthiness directive (AD) is effective December 26,
2023.
Exact source excerpt. Text positions 14413–14505, end exclusive, in the original decoded publication. SHA-256: ed70fd1ba8c445cc62696c35c68a96aae88142b107342b8f2a7ab5427ecaeec9
Affected ADs
(b) Affected ADs
None.
Exact source excerpt. Text positions 14505–14534, end exclusive, in the original decoded publication. SHA-256: 871a4afc60ceeae06e8010585055188633d616078500c45937092bfe892239c0
Applicability wording · Applicability
(c) Applicability
This AD applies to all MHI RJ Aviation ULC (Type Certificate
previously held by Bombardier, Inc.) Model CL-600-2B19 (Regional Jet
Series 100 & 440) airplanes, certificated in any category.
Exact source excerpt. Text positions 14534–14749, end exclusive, in the original decoded publication. SHA-256: cbb5a3fda0b5ac66fe687b79a2af60719315e27419f677625760a208c0e73bf1
Subject
(d) Subject
Air Transport Association (ATA) of America Code: 36, Pneumatic.
Exact source excerpt. Text positions 14749–14831, end exclusive, in the original decoded publication. SHA-256: 819b6c504fe4bc257b426dd58cdcd05c4abd73afdffefc267193db30bd40824b
Unsafe Condition
(e) Unsafe Condition
This AD was prompted by a report of missing insulation in the
engine pylon area. The FAA is issuing this AD to address missing or
damaged insulation in the engine pylon area. The unsafe condition,
if not addressed, could result in the bleed duct to radiate heat to
the surrounding structure and, if not corrected, could lead to the
loss of the structural integrity of the engine pylon and possible
loss of the engine.
Exact source excerpt. Text positions 14831–15282, end exclusive, in the original decoded publication. SHA-256: 6b2782f840d556e9c845ccd35def96bac26c17f413ca81682db71801ed8dfbc1
Compliance
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
Exact source excerpt. Text positions 15282–15384, end exclusive, in the original decoded publication. SHA-256: 00fbfa31932483f627d0ce0a11cbd2e35e15d9231842b91ac85623ce533912d3
Detailed Visual Inspection
(g) Detailed Visual Inspection
For airplanes having serial numbers 7031, 7045, 7069, 7078,
7089, 7102, 7110, 7168, 7188, 7203, 7212, 7217, 7229, 7231, 7236,
7243, 7257, 7258, 7269, 7271, 7276, 7284, 7290, 7302, 7304, 7306,
7310, 7328, 7339, 7342, 7355, 7358, 7360, 7401, 7404, 7437, 7441,
7448, 7458, 7474, 7476, 7479, 7495, 7502, 7503, 7517, 7527, 7530,
7532, 7548, 7551, 7574, 7575, 7579, 7582, 7586, 7588, 7599, 7600,
7606, 7609, 7623, 7632, 7648, 7657, 7658, 7664, 7667, 7674, 7681,
7682, 7683, 7687, 7715, 7727, 7743, 7748, 7749, 7750, 7758, 7760,
7769, 7780, 7810, 7817, 7818, 7821, 7822, 7857, 7859, 7871, 7873,
7889, 7892, 7895, 7909, 7912, 7913, 7920, 7922, 7923, 7926, 7929,
7932, 7935, 7937, 7954, 7961, 7964, and 8011: Within 48 months or
6,600 flight hours, whichever occurs first after the effective date
of this AD, do a detailed visual inspection for discrepancies of
spar FS654.50, spar FS672.20, and the firewall, in accordance with
Section 2.B. of the Accomplishment Instructions of MHI RJ Service
Bulletin 601R-54-006, Revision A, dated May 24, 2023. If any
discrepancies are found, before further flight, repair using a
method approved by the Manager, International Validation Branch,
FAA; or Transport Canada or MHI RJ Aviation ULC's Transport Canada
Design Approval Organization (DAO). If approved by the DAO, the
approval must include the DAO-authorized signature.
Exact source excerpt. Text positions 15384–16799, end exclusive, in the original decoded publication. SHA-256: 4763e0e23e2d2027940fde48f0f9481e294f040f21a098864c3ff365e3968ae7
Maintenance or Inspection Program Revision
(h) Maintenance or Inspection Program Revision
Within 60 days after the effective date of this AD, revise the
existing maintenance or
[[Page 80582]]
inspection program, as applicable, to incorporate the information
specified in MHI RJ Temporary Revision 2A-77, dated May 8, 2023, for
certification maintenance requirements task number C36-12-133-01.
The initial compliance time for doing the task is within 48 months
or 6,600 flight hours, whichever occurs first after the effective
date of this AD.
Exact source excerpt. Text positions 16799–17313, end exclusive, in the original decoded publication. SHA-256: 0d146dd3904a7804721dc0296e98d39c950e3d771c4fe8d8429580a321a60b96
No Alternative Actions or Intervals
(i) No Alternative Actions or Intervals
After the existing maintenance or inspection program has been
revised as required by paragraph (h) of this AD, no alternative
actions (e.g., inspections) or intervals may be used unless the
actions and intervals are approved as an alternative method of
compliance (AMOC) in accordance with the procedures specified in
paragraph (k)(1) of this AD.
Exact source excerpt. Text positions 17313–17711, end exclusive, in the original decoded publication. SHA-256: f743f9f896d213872eb052b2ad51b1574467cbc8a5aa8254b9b28464748d30d4
Credit for Previous Actions
(j) Credit for Previous Actions
(1) This paragraph provides credit for actions required by
paragraph (g) of this AD, if those actions were performed before the
effective date of this AD using MHI RJ Service Bulletin 601R-54-006,
dated September 13, 2022.
(2) This paragraph provides credit for actions required by
paragraph (h) of this AD, if those actions were performed before the
effective date of this AD using MHI RJ Temporary Revision 2A-76,
dated September 29, 2022.
Exact source excerpt. Text positions 17711–18201, end exclusive, in the original decoded publication. SHA-256: 70d1682ca36acd504bcb343f81e3760beb4435bb2f401e8f672b0c4266ac0d90
Additional AD Provisions
(k) Additional AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Validation Branch, FAA, has the authority to approve
AMOCs for this AD, if requested using the procedures found in 14 CFR
39.19. In accordance with 14 CFR 39.19, send your request to your
principal inspector or responsible Flight Standards Office, as
appropriate. If sending information directly to the manager,
International Validation Branch, mail it to the address identified
in paragraph (l)(2) of this AD or email to: [email protected]. Before using any approved AMOC, notify your
appropriate principal inspector, or lacking a principal inspector,
the manager of the responsible Flight Standards Office.
(2) Contacting the Manufacturer: For any requirement in this AD
to obtain instructions from a manufacturer, the instructions must be
accomplished using a method approved by the Manager, International
Validation Branch, FAA; or Transport Canada or MHI RJ Aviation ULC's
Transport Canada DAO. If approved by the DAO, the approval must
include the DAO-authorized signature.
Exact source excerpt. Text positions 18201–19360, end exclusive, in the original decoded publication. SHA-256: 0ed6b83746f799782aa92badc55bd1f9254ab1ffd5b4d4511bc38506c392b726
Additional Information
(l) Additional Information
(1) Refer to Transport Canada AD CF-2023-19, dated March 13,
2023, for related information. This Transport Canada AD may be found
in the AD docket at regulations.gov under Docket No. FAA-2023-1404.
(2) For more information about this AD, contact Fatin Saumik,
Aviation Safety Engineer, FAA, 1600 Stewart Avenue, Suite 410,
Westbury, NY 11590; telephone 516-228-7300; email [email protected].
Exact source excerpt. Text positions 19360–19793, end exclusive, in the original decoded publication. SHA-256: 79691fe2136ac7146082d57943029444f3eaba5f94f3bb3285a96b005767327b
Material Incorporated by Reference
(m) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference of the service information listed in this
paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(i) MHI RJ Service Bulletin 601R-54-006, Revision A, dated May
24, 2023.
(ii) MHI RJ Temporary Revision 2A-77, dated May 8, 2023.
(3) For service information identified in this AD, contact MHI
RJ Aviation Group, Customer Response Center, 3655 Ave. des Grandes-
Tourelles, Suite 110, Boisbriand, Qu[eacute]bec J7H 0E2 Canada;
North America toll-free telephone 833-990-7272 or direct-dial
telephone 450-990-7272; email: mhirj.com">thd.crj@mhirj.com; website:
mhirj.com.
(4) You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200
South 216th Street, Des Moines, WA. For information on the
availability of this material at the FAA, call 206-231-3195.
(5) You may view this material at the National Archives and
Records Administration (NARA). For information on the availability
of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email [email protected].
Exact source excerpt. Text positions 19793–21125, end exclusive, in the original decoded publication. SHA-256: 555da56530e4e7e038b3b6628d499b50d1265a3c1b85cea0e5f056c1afde860b
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2023-21-12 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 4f09ed763d9aed577b2275b0e79b2706bec5553186365bc334ab1ba306d58be6. Source manifest: b7612578ff3e5d6e2cd2f68fc733acee3b88321eb2056b6c855b44478a27a724.
Official source · 2023-11-20
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 88, Number 222 (Monday, November 20, 2023)]
[Rules and Regulations]
[Pages 80579-80582]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-25494]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2023-1404; Project Identifier MCAI-2023-00451-T;
Amendment 39-22584; AD 2023-21-12]
RIN 2120-AA64
Airworthiness Directives; MHI RJ Aviation ULC (Type Certificate
Previously Held by Bombardier, Inc.) Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for all
MHI RJ Aviation ULC Model CL-600-2B19 (Regional Jet Series 100 & 440)
airplanes. This AD was prompted by a report of missing insulation in
the engine pylon area. This AD requires, for certain airplanes,
inspecting the engine pylon structure for discrepancies and repair if
necessary. This AD also requires revising the existing maintenance or
inspection program, as applicable, to incorporate a new certification
maintenance requirement (CMR) task. The FAA is issuing this AD to
address the unsafe condition on these products.
DATES: This AD is effective December 26, 2023.
The Director of the Federal Register approved the incorporation by
reference of certain publications listed in this AD as of December 26,
2023.
ADDRESSES:
AD Docket: You may examine the AD docket at regulations.gov under
Docket No. FAA-2023-1404; or in person at Docket Operations between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD
docket contains this final rule, the mandatory continuing airworthiness
information (MCAI), any comments received, and other information. The
address for Docket Operations is U.S. Department of Transportation,
Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200
New Jersey Avenue SE, Washington, DC 20590.
Material Incorporated by Reference:
<bullet> For service information identified in this final rule,
contact MHI RJ Aviation Group, Customer Response Center, 3655 Ave. des
Grandes-Tourelles, Suite 110, Boisbriand, Qu[eacute]bec J7H 0E2 Canada;
North America toll-free telephone 833-990-7272 or direct-dial telephone
450-990-7272; email: mhirj.com">thd.crj@mhirj.com; website: mhirj.com.
<bullet> You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200 South
216th St., Des Moines, WA. For information on the availability of this
material at the FAA, call 206-231-3195. It is also available at
regulations.gov under Docket No. FAA-2023-1404.
FOR FURTHER INFORMATION CONTACT: Fatin Saumik, Aviation Safety
Engineer, FAA, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590;
telephone 516-228-7300; email [email protected].
SUPPLEMENTARY INFORMATION:
[[Page 80580]]
Background
The FAA issued a notice of proposed rulemaking (NPRM) to amend 14
CFR part 39 by adding an AD that would apply to all MHI RJ Aviation ULC
Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes. The NPRM
published in the Federal Register on July 12, 2023 (88 FR 44226). The
NPRM was prompted by AD CF-2023-19, dated March 13, 2023 (Transport
Canada AD CF-2023-19) (also referred to after this as the MCAI), issued
by Transport Canada, which is the aviation authority for Canada. The
MCAI states there was a report of a missing 12-inch piece of insulation
in the 14th stage bleed ducts installed in both left hand (LH) and
right hand (RH) engine pylon areas.
In the NPRM, the FAA proposed to require, for certain airplanes,
inspecting the engine pylon structure for discrepancies and repair if
necessary. The NPRM also proposed to require revising the existing
maintenance or inspection program, as applicable, to incorporate a new
CMR task.
The FAA is issuing this AD to address missing or damaged insulation
in the engine pylon area. The unsafe condition, if not addressed, could
result in the bleed duct to radiate heat to the surrounding structure
and, if not corrected, could lead to the loss of the structural
integrity of the engine pylon and possible loss of the engine.
You may examine the MCAI in the AD docket at regulations.gov under
Docket No. FAA-2023-1404.
Discussion of Final Airworthiness Directive
Comments
The FAA received comments from Air Line Pilots Association,
International (ALPA) who supported the NPRM without change.
The FAA received additional comments from Air Wisconsin Airlines
and MHI RJ Aviation ULC (MHI RJ). The following presents the comments
received on the NPRM and the FAA's response to each comment.
Request To Refer New Temporary Revision
MHI RJ requested that the FAA revise the proposed AD to refer to
MHI RJ Temporary Revision 2A-77, dated May 8, 2023, which was issued to
revise the phase-in (initial) compliance time in MHI RJ Temporary
Revision 2A-76, dated September 29, 2022, from 40 months to 48 months.
The FAA concurs with the request and has revised paragraph (h) of
this AD to refer to MHI RJ Temporary Revision 2A-77, dated May 8, 2023,
for the new CMR task. The FAA has also provided credit for using MHI RJ
Temporary Revision 2A-76, dated September 29, 2022, in paragraph (j)(2)
of this AD. The CMR task and interval is the same in both temporary
revisions. In addition, there is no change to initial compliance time
because paragraph (j) of the proposed AD did not refer to MHI RJ
Temporary Revision 2A-76, dated September 29, 2022, for the initial
compliance time and instead specified ``The initial compliance time for
doing the task is within 48 months or 6,600 flight hours, whichever
occurs first after the effective date of this AD.'' The compliance time
change in MHI RJ Temporary Revision 2A-77, dated May 8, 2023, is within
the initial compliance time specified in this AD.
Request To Revise Compliance Time
MHI RJ stated it noticed that the FAA is re-starting the clock in
paragraph (h) of the proposed AD from the effective date of the AD
rather than the issue date of the temporary revision: MHI RJ states
that the task interval should start from September 29, 2022, which is
the issue date of MHI RJ Temporary Revision 2A-76. MHI RJ stated that,
in this particular case, the start of the compliance from September 29,
2022, is critical for safety. The FAA infers that MHI RJ is requesting
that the agency reduce the initial compliance time specified in
paragraph (h) of this AD by referring to the September 29, 2022, date
instead of the effective date of this AD.
The FAA acknowledges MHI RJ's concern. However, reducing the
compliance time in paragraph (h) of this AD would result in a more
restrictive compliance time that would necessitate issuing a
supplemental NPRM, delaying the issuance of the final rule. Since the
detailed visual inspection of spar FS654.50, spar FS672.20, and the
firewall for discrepancies specified in paragraph (g) of this AD would
be delayed if a supplemental NPRM is issued, any increase in the level
of safety by reducing the compliance time in paragraph of (h) of this
AD may be offset by delaying the inspections in paragraph (g) of this
AD. The FAA has determined to delay this action is not appropriate in
this case as the compliance times in this AD will ensure an acceptable
level of safety.
Request To Clarify Compliance Time
Air Wisconsin Airlines asked if the ``40 months'' specified in MHI
RJ Temporary Revision 2A-76, dated September 29, 2022, is in error. Air
Wisconsin Airlines noted that both paragraphs (g) and (h) of the
proposed AD mention ``within 48 months.''
The FAA agrees to clarify. As stated previously, MHI RJ Temporary
Revision 2A-76, dated September 29, 2022, was revised by MHI RJ
Temporary Revision 2A-77, dated May 8, 2023, to correct the ``40
months'' and change it to ``48 months.'' The FAA has not changed this
AD in this regard.
Request To Revise Language in Paragraph (e) of the Proposed AD
MHI RJ requested that the proposed AD should not only mention
missing insulation but damaged insulation as well and stated the
sentence in paragraph (e) of the proposed AD should read: ``The FAA is
issuing this AD to address missing or damaged insulation in the engine
pylon area.''
The FAA concurs and has revised paragraph (e) of this AD
accordingly. The tasks associated with the new CMR task specifies
inspecting for damaged insulation as well as missing insulation.
Therefore, it is accurate to state that the FAA is issuing this AD to
address both conditions.
Conclusion
This product has been approved by the aviation authority of another
country and is approved for operation in the United States. Pursuant to
the FAA's bilateral agreement with this State of Design Authority, it
has notified the FAA of the unsafe condition described in the MCAI
referenced above. The FAA reviewed the relevant data, considered the
comments received, and determined that air safety requires adopting
this AD as proposed. Accordingly, the FAA is issuing this AD to address
the unsafe condition on this product. Except for minor editorial
changes, and any other changes described previously, this AD is adopted
as proposed in the NPRM. None of the changes will increase the economic
burden on any operator.
Related Service Information Under 1 CFR Part 51
The FAA reviewed MHI RJ Service Bulletin 601R-54-006, Revision A,
dated May 24, 2023. This service information specifies procedures for
doing a detailed visual inspection of spar FS654.50, spar FS672.20, and
the firewall for discrepancies, including corrosion, cracks, web
waviness or flatness and damaged fasteners.
The FAA reviewed MHI RJ Temporary Revision 2A-77, dated May 8,
2023. This service information specifies a new CMR task, number C36-12-
133-01, ``Detailed Visual Inspection for missing insulation/heat shield
on the 14th stage bleed duct, running through the pylon area between
FS654 and FS672.''
[[Page 80581]]
This service information is reasonably available because the
interested parties have access to it through their normal course of
business or by the means identified in the ADDRESSES section.
Costs of Compliance
The FAA estimates that this AD affects 338 airplanes of U.S.
registry. The FAA estimates the following costs to comply with this AD:
Estimated Costs for Required Actions *
----------------------------------------------------------------------------------------------------------------
Cost per Cost on U.S.
Labor cost Parts cost product operators
----------------------------------------------------------------------------------------------------------------
6 work-hours x $85 per hour = $510........................... $0 $510 $172,380
----------------------------------------------------------------------------------------------------------------
* This table does not include the cost of revising the existing maintenance or inspection program.
The FAA has determined that revising the existing maintenance or
inspection program takes an average of 90 work-hours per operator,
although the agency recognizes that this number may vary from operator
to operator. Since operators incorporate maintenance or inspection
program changes for their affected fleet(s), the FAA has determined
that a per-operator estimate is more accurate than a per-airplane
estimate. Therefore, the agency estimates the average total cost per
operator to be $7,650 (90 work-hours x $85 per work-hour).
The FAA has received no definitive data on which to base the cost
estimates for the on-condition repairs specified in this AD.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
The FAA is issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: General requirements.
Under that section, Congress charges the FAA with promoting safe flight
of civil aircraft in air commerce by prescribing regulations for
practices, methods, and procedures the Administrator finds necessary
for safety in air commerce. This regulation is within the scope of that
authority because it addresses an unsafe condition that is likely to
exist or develop on products identified in this rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Will not affect intrastate aviation in Alaska, and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
The Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive:
2023-21-12 MHI RJ Aviation ULC (Type Certificate Previously Held by
Bombardier, Inc.): Amendment 39-22584; Docket No. FAA-2023-1404;
Project Identifier MCAI-2023-00451-T.
(a) Effective Date
This airworthiness directive (AD) is effective December 26,
2023.
(b) Affected ADs
None.
(c) Applicability
This AD applies to all MHI RJ Aviation ULC (Type Certificate
previously held by Bombardier, Inc.) Model CL-600-2B19 (Regional Jet
Series 100 & 440) airplanes, certificated in any category.
(d) Subject
Air Transport Association (ATA) of America Code: 36, Pneumatic.
(e) Unsafe Condition
This AD was prompted by a report of missing insulation in the
engine pylon area. The FAA is issuing this AD to address missing or
damaged insulation in the engine pylon area. The unsafe condition,
if not addressed, could result in the bleed duct to radiate heat to
the surrounding structure and, if not corrected, could lead to the
loss of the structural integrity of the engine pylon and possible
loss of the engine.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Detailed Visual Inspection
For airplanes having serial numbers 7031, 7045, 7069, 7078,
7089, 7102, 7110, 7168, 7188, 7203, 7212, 7217, 7229, 7231, 7236,
7243, 7257, 7258, 7269, 7271, 7276, 7284, 7290, 7302, 7304, 7306,
7310, 7328, 7339, 7342, 7355, 7358, 7360, 7401, 7404, 7437, 7441,
7448, 7458, 7474, 7476, 7479, 7495, 7502, 7503, 7517, 7527, 7530,
7532, 7548, 7551, 7574, 7575, 7579, 7582, 7586, 7588, 7599, 7600,
7606, 7609, 7623, 7632, 7648, 7657, 7658, 7664, 7667, 7674, 7681,
7682, 7683, 7687, 7715, 7727, 7743, 7748, 7749, 7750, 7758, 7760,
7769, 7780, 7810, 7817, 7818, 7821, 7822, 7857, 7859, 7871, 7873,
7889, 7892, 7895, 7909, 7912, 7913, 7920, 7922, 7923, 7926, 7929,
7932, 7935, 7937, 7954, 7961, 7964, and 8011: Within 48 months or
6,600 flight hours, whichever occurs first after the effective date
of this AD, do a detailed visual inspection for discrepancies of
spar FS654.50, spar FS672.20, and the firewall, in accordance with
Section 2.B. of the Accomplishment Instructions of MHI RJ Service
Bulletin 601R-54-006, Revision A, dated May 24, 2023. If any
discrepancies are found, before further flight, repair using a
method approved by the Manager, International Validation Branch,
FAA; or Transport Canada or MHI RJ Aviation ULC's Transport Canada
Design Approval Organization (DAO). If approved by the DAO, the
approval must include the DAO-authorized signature.
(h) Maintenance or Inspection Program Revision
Within 60 days after the effective date of this AD, revise the
existing maintenance or
[[Page 80582]]
inspection program, as applicable, to incorporate the information
specified in MHI RJ Temporary Revision 2A-77, dated May 8, 2023, for
certification maintenance requirements task number C36-12-133-01.
The initial compliance time for doing the task is within 48 months
or 6,600 flight hours, whichever occurs first after the effective
date of this AD.
(i) No Alternative Actions or Intervals
After the existing maintenance or inspection program has been
revised as required by paragraph (h) of this AD, no alternative
actions (e.g., inspections) or intervals may be used unless the
actions and intervals are approved as an alternative method of
compliance (AMOC) in accordance with the procedures specified in
paragraph (k)(1) of this AD.
(j) Credit for Previous Actions
(1) This paragraph provides credit for actions required by
paragraph (g) of this AD, if those actions were performed before the
effective date of this AD using MHI RJ Service Bulletin 601R-54-006,
dated September 13, 2022.
(2) This paragraph provides credit for actions required by
paragraph (h) of this AD, if those actions were performed before the
effective date of this AD using MHI RJ Temporary Revision 2A-76,
dated September 29, 2022.
(k) Additional AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Validation Branch, FAA, has the authority to approve
AMOCs for this AD, if requested using the procedures found in 14 CFR
39.19. In accordance with 14 CFR 39.19, send your request to your
principal inspector or responsible Flight Standards Office, as
appropriate. If sending information directly to the manager,
International Validation Branch, mail it to the address identified
in paragraph (l)(2) of this AD or email to: [email protected]. Before using any approved AMOC, notify your
appropriate principal inspector, or lacking a principal inspector,
the manager of the responsible Flight Standards Office.
(2) Contacting the Manufacturer: For any requirement in this AD
to obtain instructions from a manufacturer, the instructions must be
accomplished using a method approved by the Manager, International
Validation Branch, FAA; or Transport Canada or MHI RJ Aviation ULC's
Transport Canada DAO. If approved by the DAO, the approval must
include the DAO-authorized signature.
(l) Additional Information
(1) Refer to Transport Canada AD CF-2023-19, dated March 13,
2023, for related information. This Transport Canada AD may be found
in the AD docket at regulations.gov under Docket No. FAA-2023-1404.
(2) For more information about this AD, contact Fatin Saumik,
Aviation Safety Engineer, FAA, 1600 Stewart Avenue, Suite 410,
Westbury, NY 11590; telephone 516-228-7300; email [email protected].
(m) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference of the service information listed in this
paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(i) MHI RJ Service Bulletin 601R-54-006, Revision A, dated May
24, 2023.
(ii) MHI RJ Temporary Revision 2A-77, dated May 8, 2023.
(3) For service information identified in this AD, contact MHI
RJ Aviation Group, Customer Response Center, 3655 Ave. des Grandes-
Tourelles, Suite 110, Boisbriand, Qu[eacute]bec J7H 0E2 Canada;
North America toll-free telephone 833-990-7272 or direct-dial
telephone 450-990-7272; email: mhirj.com">thd.crj@mhirj.com; website:
mhirj.com.
(4) You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200
South 216th Street, Des Moines, WA. For information on the
availability of this material at the FAA, call 206-231-3195.
(5) You may view this material at the National Archives and
Records Administration (NARA). For information on the availability
of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email [email protected].
Issued on October 20, 2023.
Ross Landes,
Deputy Director for Regulatory Operations, Compliance & Airworthiness
Division, Aircraft Certification Service.
[FR Doc. 2023-25494 Filed 11-17-23; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T01:32:26.933981+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- d37791786ede39967b9697d8d9f36709b803e8de51362ea5c10a7020be3c9d76
- Text SHA-256
- 4f09ed763d9aed577b2275b0e79b2706bec5553186365bc334ab1ba306d58be6
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.