Published 2007-06-11 · Federal Register document E7-10982
Airworthiness Directives; Boeing Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-300, 747-400, 747-400D, 747SR, and 747SP Series Airplanes
Publication summary
The FAA is superseding an existing airworthiness directive (AD), which applies to certain Boeing Model 747 airplanes. That AD currently requires repetitive inspections to detect cracks and/or corrosion of the girt bar support fitting at certain main entry doors (MED), and repair or replacement of the support fitting. The existing AD also provides for various terminating actions for the repetitive inspections. This new AD requires the following additional actions: An inspection, for certain airplanes, for correct installation of square and conical washers in the girt bar support fitting; an inspection, for certain other airplanes, to determine if the washers are installed; and related investigative and corrective action if necessary. This AD results from a report that the square and conical washers may be installed incorrectly in the girt bar support fitting on airplanes on which the support fitting was repaired or replaced in accordance with the requirements of the existing AD. We are issuing this AD to detect and correct corrosion of the girt bar support fitting, which could result in separation of the escape slide from the lower door sill during deployment, and subsequently prevent proper operation of the escape slides at the main entry doors during an emergency. We are also issuing this AD to detect and correct incorrect installation of the square and conical washers in the girt bar support fitting, which could result in failure of the escape slide when deployed.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:23.906952+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2007-daaa03e810180273
- Source row
- results[226]
- Raw source SHA-256
- daaa03e81018027354d93b79e2a5f918dd4e1ce116086c5ab24f0dfd782528aa
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2007-12-11
- Effective date printed in this edition
- 2007-07-16
Read 11 complete recorded clauses
Effective Date
Effective Date
(a) This AD becomes effective July 16, 2007.
Exact source excerpt. Text positions 9924–9990, end exclusive, in the original decoded publication. SHA-256: b08221c6663eddf739eddb8cfcd7545ed29cc872a79c1eafd7be696bdd878df7
Affected ADs
Affected ADs
(b) This AD supersedes AD 96-23-05.
[[Page 31986]]
Exact source excerpt. Text positions 9990–10061, end exclusive, in the original decoded publication. SHA-256: d0e65cebd0a1778b7802a0ff0fefd318699ee9df45b0fb3dfa7ea9f34a89a565
Applicability wording · Applicability
Applicability
(c) This AD applies to Boeing Model 747-100, 747-100B, 747-100B
SUD, 747-200B, 747-200C, 747-300, 747-400, 747-400D, 747SR, and
747SP series airplanes, certificated in any category, line numbers 1
through 868 inclusive.
Exact source excerpt. Text positions 10061–10304, end exclusive, in the original decoded publication. SHA-256: 68bd00696aedef6ab25a099b682cbc4ba573f5d24b2061a3a18f7b78a8e544e6
Unsafe Condition
Unsafe Condition
(d) This AD results from reports that, during scheduled
deployment tests of main entry door slides, corrosion was found on
the floor structure supports for the escape slides of the main deck
entry doors on these airplanes. This AD also results from a report
that the square and conical washers may be installed incorrectly in
the girt bar support fitting on airplanes on which the support
fitting was repaired or replaced in accordance with the requirements
of AD 96-23-05. We are issuing this AD to detect and correct
corrosion of the girt bar support fitting, which could result in
separation of the escape slide from the lower door sill during
deployment, and subsequently prevent proper operation of the escape
slides at the main entry doors during an emergency. We are also
issuing this AD to detect and correct incorrect installation of the
square and conical washers in the girt bar support fitting, which
could result in failure of the escape slide when deployed.
Exact source excerpt. Text positions 10304–11313, end exclusive, in the original decoded publication. SHA-256: 4e7d7bf7dbb3589234396e6d43245e9f95e0cea398e9846dc9052db5cabb65d0
Compliance
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Restatement of Requirements of AD 96-23-05 With New Service Information
Exact source excerpt. Text positions 11313–11564, end exclusive, in the original decoded publication. SHA-256: 361a007a47d2f04427474875b8783d14433f4a8f69f6005ea0f638379f8055ba
Doors Exempt From/Affected by This AD
Doors Exempt From/Affected by This AD
(f) The requirements of this AD are not applicable to doors
where an escape slide or slide/raft is not installed or is not used
for passenger egress (such as a deactivated door 3, at doors 4 and/
or 5 of an airplane being operated in the ``combi'' configuration,
or any door not used for passenger egress in a ``convertible'' (an
airplane configured for quick change from passenger to cargo)). The
requirements of this AD are also not applicable to doors on
airplanes converted to an all-cargo configuration. The requirements
of this AD become applicable at the time when an escape slide or
slide/raft is installed on such doors, or when such doors are
activated and/or converted for passenger use. The requirements also
become applicable at the time an airplane operating in an all-cargo
configuration is converted to a passenger or passenger/cargo
configuration.
Exact source excerpt. Text positions 11564–12485, end exclusive, in the original decoded publication. SHA-256: 1c3a4cf23b7ec06f65824f64f5a071eec951521abce84f723685eefe3bb27fc9
Inspections and Corrective Actions for Airplanes Equipped With Main Entry Door (MED) 1
Inspections and Corrective Actions for Airplanes Equipped With Main
Entry Door (MED) 1
(g) For airplanes equipped with MED 1: Prior to the accumulation
of 16 years of service since date of manufacture of the airplane, or
within 18 months after December 16, 1996 (the effective date of AD
96-23-05), whichever occurs later, perform a detailed inspection to
detect cracking and/or corrosion of the girt bar support fitting at
the left and right MED 1, in accordance with Boeing Service Bulletin
747-53A2378, Revision 1, dated March 10, 1994; or Boeing Service
Bulletin 747-53A2378, Revision 3, dated August 11, 2005. After the
effective date of this AD, only Revision 3 may be used.
(h) If no cracking or corrosion is found during the inspection
required by paragraph (g) of this AD, prior to further flight,
accomplish either paragraph (h)(1) or (h)(2) of this AD, in
accordance with the applicable instructions specified in Boeing
Service Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or
Boeing Service Bulletin 747-53A2378, Revision 3, dated August 11,
2005. After the effective date of this AD, only Revision 3 may be
used.
(1) Install a new fitting with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners, in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by paragraph (h) of this
AD; or
(2) Reinstall the threshold assembly with corrosion-resistant
fasteners, in accordance with the service bulletin. Thereafter,
repeat the inspection required by paragraph (g) of this AD at
intervals not to exceed 6 years.
(i) If any cracking is found during the inspection required by
paragraph (g) or (h)(2) of this AD, prior to further flight, install
a new fitting with new fasteners, and reinstall the threshold
assembly with new corrosion-resistant fasteners, in accordance with
Boeing Service Bulletin 747-53A2378, Revision 1, dated March 10,
1994; or Boeing Service Bulletin 747-53A2378, Revision 3, dated
August 11, 2005. After the effective date of this AD, only Revision
3 may be used. After these actions are accomplished, no further
action is required by this paragraph.
(j) If any corrosion is found during the inspection required by
paragraph (g) or (h)(2) of this AD, prior to further flight,
accomplish either paragraph (j)(1) or (j)(2) of this AD, in
accordance with Boeing Service Bulletin 747-53A2378, Revision 1,
dated March 10, 1994; or Boeing Service Bulletin 747-53A2378,
Revision 3, dated August 11, 2005. After the effective date of this
AD, only Revision 3 may be used.
(1) Install a new fitting with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by this paragraph; or
(2) Blend out corrosion in accordance with the service bulletin.
(i) If blend out of corrosion is beyond 10 percent of original
thickness or any crack is found during accomplishment of the blend
out procedures, install a new fitting with new fasteners, and
reinstall the threshold assembly with new corrosion-resistant
fasteners, in accordance with the service bulletin. After these
actions are accomplished, no further action is required by this
paragraph.
(ii) If blend out of corrosion does not exceed 10 percent of
original material thickness, accomplish either paragraph
(j)(2)(ii)(A) or (j)(2)(ii)(B) of this AD:
(A) Install a new fitting with new fasteners, and reinstall
threshold assembly with new corrosion-resistant fasteners, in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by this paragraph; or
(B) Install the repaired fitting with new fasteners and
reinstall the threshold assembly with corrosion-resistant fasteners,
in accordance with the service bulletin. Thereafter, repeat the
inspection and applicable corrective actions required by paragraph
(g) of this AD at intervals not to exceed 6 years.
Exact source excerpt. Text positions 12485–16614, end exclusive, in the original decoded publication. SHA-256: 83f005c0629f6d98f8e66c45208e223e97f6325b7872aad4fb26f78e23f55e14
Inspections and Corrective Actions for Airplanes Equipped With MED 2, 4, and/or 5 (MED 2, 3, and/or 4 on Model 747SP Series Airplanes)
Inspections and Corrective Actions for Airplanes Equipped With MED
2, 4, and/or 5 (MED 2, 3, and/or 4 on Model 747SP Series Airplanes)
(k) For airplanes equipped with MED 2, 4, and/or 5 (MED 2, 3,
and/or 4 on Model 747SP series airplanes): Prior to the accumulation
of 10 years of service since date of manufacture of the airplane, or
within 18 months after December 16, 1996, whichever occurs later,
perform a detailed inspection to detect cracking and/or corrosion of
the girt bar support fitting at the left and right MED 2, 4, and 5
(MED 2, 3, and 4 on Model 747SP series airplanes), in accordance
with Boeing Service Bulletin 747-53A2378, Revision 1, dated March
10, 1994; or Boeing Service Bulletin 747-53A2378, Revision 3, dated
August 11, 2005. After the effective date of this AD, only Revision
3 may be used.
(l) If no cracking or corrosion is found during the inspection
required by paragraph (k) of this AD, prior to further flight,
accomplish either paragraph (l)(1) or (l)(2) of this AD, in
accordance with the applicable instructions in Boeing Service
Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005.
After the effective date of this AD, only Revision 3 may be used.
(1) Remove the inspected fitting and reinstall it with a new
coat of primer and new fasteners; and reinstall the threshold
assembly with new corrosion-resistant fasteners; in accordance with
the service bulletin. After these actions are accomplished, no
further action is required by this paragraph; or
(2) Reinstall the serrated plate assembly and the girt bar floor
fitting with corrosion-resistant fasteners, in accordance with the
service bulletin. Thereafter, repeat the inspection required by
paragraph (k) of this AD at intervals not to exceed 6 years.
(m) If any cracking is found during the inspection required by
paragraph (k) or (l)(2) of this AD, prior to further flight, install
a new fitting with new fasteners, and reinstall the threshold
assembly with new corrosion-resistant fasteners, in accordance with
Boeing Service Bulletin 747-53A2378, Revision 1, dated March 10,
1994; or Boeing Service Bulletin 747-53A2378, Revision 3, dated
August 11, 2005. After the effective date of this AD, only Revision
3 may be used. After these actions are accomplished, no further
action is required by this paragraph.
(n) If any corrosion is found during the inspection required by
paragraph (k) or (l)(2) of this AD, prior to further flight,
accomplish either paragraph (n)(1) or (n)(2) of this AD, in
accordance with Boeing Service Bulletin 747-53A2378, Revision 1,
dated March 10, 1994; or Boeing Service Bulletin 747-
[[Page 31987]]
53A2378, Revision 3, dated August 11, 2005. After the effective date
of this AD, only Revision 3 may be used.
(1) Install a new fitting with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners, in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by this paragraph; or
(2) Blend out corrosion in accordance with the service bulletin.
(i) If blend out of corrosion is beyond 10 percent of original
thickness or any crack is found during accomplishment of the blend
out procedures, install a new fitting with new fasteners, and
reinstall the threshold assembly with new corrosion-resistant
fasteners, in accordance with the service bulletin. After these
actions are accomplished, no further action is required by this
paragraph.
(ii) If blend out of corrosion does not exceed 10 percent of
original material thickness, install the repaired fitting with new
fasteners, and reinstall the threshold assembly with new corrosion-
resistant fasteners, in accordance with the service bulletin. After
these actions are accomplished, no further action is required by
this paragraph.
(o) For airplanes equipped with main entry door (MED) 3 (this
paragraph does not apply to Model 747SP series airplanes): Prior to
the accumulation of 16 years of service since date of manufacture of
the airplane, or within 18 months after December 16, 1996, whichever
occurs later, perform a detailed inspection to detect cracking and/
or corrosion of the girt bar support angles at the left and right
MED 3, in accordance with Boeing Service Bulletin 747-53A2378,
Revision 1, dated March 10, 1994; or Boeing Service Bulletin 747-
53A2378, Revision 3, dated August 11, 2005. After the effective date
of this AD, only Revision 3 may be used.
(p) If no cracking or corrosion is found during the inspection
required by paragraph (o) of this AD, prior to further flight,
accomplish either paragraph (p)(1) or (p)(2) of this AD in
accordance with the applicable instructions in Boeing Service
Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005.
After the effective date of this AD, only Revision 3 may be used.
(1) Remove the inspected angle and reinstall it with a new coat
of primer and new fasteners; and reinstall the threshold assembly
with new corrosion-resistant fasteners; in accordance with the
service bulletin. After these actions are accomplished, no further
action is required by this paragraph; or
(2) Reinstall the corner scuff plate and the threshold apron
with corrosion-resistant fasteners, in accordance with the service
bulletin. Thereafter, repeat the inspection required by paragraph
(o) of this AD at intervals not to exceed 6 years.
(q) If any crack common to the support angles is found during
the inspection required by paragraph (o) or (p)(2) of this AD, prior
to further flight, accomplish the actions specified in paragraph
(q)(1) or (q)(2), as applicable, in accordance with Boeing Service
Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005.
After the effective date of this AD, only Revision 3 may be used:
(1) Install the new angles with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners. After
these actions are accomplished, no further action is required by
this paragraph of this AD; or
(2) For any cracking found only in the corner casting as
specified in the service bulletin, accomplish either paragraph
(q)(2)(i) or (q)(2)(ii) prior to further flight:
(i) Replace the corner casting in accordance with the service
bulletin; or
(ii) Repair the cracked part in accordance with a method
approved by the Manager, Seattle Aircraft Certification Office
(ACO), FAA, Transport Airplane Directorate. Refer to paragraph (w)
of this AD for the appropriate procedure for seeking such an
approval. (This option is provided in order to give operators time
to obtain a replacement corner casing without grounding an
airplane.) This repair is considered temporary action only;
replacement of the corner casting eventually must be accomplished in
accordance with a schedule prescribed by the Manager, Seattle ACO.
(r) If any corrosion is found during the inspection required by
paragraph (o) of this AD, prior to further flight, accomplish either
paragraph (r)(1) or (r)(2) of this AD, in accordance with Boeing
Service Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or
Boeing Service Bulletin 747-53A2378, Revision 3, dated August 11,
2005. After the effective date of this AD, only Revision 3 may be
used.
(1) Install the new angles with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners, in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by this paragraph; or
(2) Blend out corrosion in accordance with the service bulletin.
(i) If blend out of corrosion is beyond 10 percent of original
thickness, or if any crack common to the support angles is found
during accomplishment of the blend out procedures, install the new
angles with new fasteners, and reinstall the threshold assembly with
new corrosion-resistant fasteners, in accordance with the service
bulletin. After these actions are accomplished, no further action is
required by this paragraph.
(ii) If blend out of corrosion does not exceed 10 percent of
original material thickness, install the repaired angles with new
fasteners, and reinstall the threshold assembly with new corrosion-
resistant fasteners, in accordance with the service bulletin. After
these actions are accomplished, no further action is required by
this paragraph.
Exact source excerpt. Text positions 16614–25318, end exclusive, in the original decoded publication. SHA-256: 4eeb5dbe41e9b8d4d74e0fa102205acc05e334e367e9ac2f29525ec97100112f
Actions Accomplished According to Previous Issue of Service Bulletin
Actions Accomplished According to Previous Issue of Service
Bulletin
(s) Installation of a girt bar support fitting in accordance
with Boeing Service Bulletin 747-25A2831, dated August 29, 1991,
before the effective date of this AD, is considered acceptable for
compliance with the corresponding requirements of paragraphs (h),
(i), (j), (l), (m), and (n) of this AD for each affected fitting
location.
New Requirements of This AD
Exact source excerpt. Text positions 25318–25762, end exclusive, in the original decoded publication. SHA-256: 6f7963837ad4383aee43b04d3ec16b7c29a2dcd941c0b082ffdc36b87dec8c1f
Inspections for the Washers and Related Investigative/Corrective Actions
Inspections for the Washers and Related Investigative/Corrective
Actions
(t) For Groups 7, 8, and 9 airplanes identified in Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005, on
which the support fitting was replaced or repaired in accordance
with Boeing Service Bulletin 747-53A2378, dated June 24, 1993;
Revision 1, dated March 10, 1994; or Revision 2, dated July 24,
2003; or Boeing Service Bulletin 747-25A2831, dated August 29, 1991:
Within 18 months after the effective date of this AD, do a general
visual inspection for correct installation of square and conical
washers in the girt bar floor fittings, and, before further flight,
do all applicable related investigative and corrective actions. Do
all actions in accordance with Figure 18 and the applicable steps
specified on page 52 in the Accomplishment Instructions of Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005,
except as provided by paragraph (v) of this AD.
(u) For Groups 1 through 6 airplanes identified in Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005, on
which the support fitting was replaced or repaired in accordance
with Boeing Service Bulletin 747-53A2378, dated June 24, 1993;
Revision 1, dated March 10, 1994; or Revision 2, dated July 24,
2003; or with Boeing Service Bulletin 747-25A2831, dated August 29,
1991: Within 18 months after the effective date of this AD, do a
general visual inspection to determine if square and conical washers
are installed in the girt bar floor fittings, and before further
flight, do all applicable related investigative and corrective
actions. Do all actions in accordance with Figure 18 and the
applicable steps specified on pages 52 and 53 in the Accomplishment
Instructions of Boeing Service Bulletin 747-53A2378, Revision 3,
dated August 11, 2005, except as provided by paragraph (v) of this
AD.
(v) If any damage is found during any inspection required by
paragraphs (t) and (u) of this AD, and Boeing Service Bulletin 747-
53A2378, Revision 3, dated August 11, 2005, specifies contacting
Boeing for appropriate action: Before further flight, do the repair
using a method approved by the Manager, Seattle ACO, or in
accordance with data meeting the certification basis of the airplane
approved by an Authorized Representative for the Boeing Commercial
Airplanes Delegation Option Authorization who has been authorized by
the Manager, Seattle ACO, to make those findings. For a repair
method to be approved, the repair must meet the certification basis
of the airplane, and the approval must specifically refer to this
AD.
Alternative Methods of Compliance (AMOCs)
(w)(1) The Manager, Seattle ACO, has the authority to approve
AMOCs for this AD, if requested in accordance with the procedures
found in 14 CFR 39.19.
[[Page 31988]]
(2) To request a different method of compliance or a different
compliance time for this AD, follow the procedures in 14 CFR 39.19.
Before using any approved AMOC on any airplane to which the AMOC
applies, notify your appropriate principal inspector (PI) in the FAA
Flight Standards District Office (FSDO), or lacking a PI, your local
FSDO.
(3) AMOCs approved previously in accordance with AD 96-23-05,
are approved as AMOCs for the corresponding provisions of this AD.
Exact source excerpt. Text positions 25762–29127, end exclusive, in the original decoded publication. SHA-256: 3a2dfc4101920f82c6373eff39a06cec7884827663a589d9c942c7cb7b50d5bc
Material Incorporated by Reference
Material Incorporated by Reference
(x) You must use Boeing Service Bulletin 747-53A2378, Revision
1, dated March 10, 1994; or Boeing Service Bulletin 747-53A2378,
Revision 3, dated August 11, 2005; as applicable, to perform the
actions that are required by this AD, unless the AD specifies
otherwise.
(1) The Director of the Federal Register approved the
incorporation by reference of Boeing Service Bulletin 747-53A2378,
Revision 3, dated August 11, 2005, in accordance with 5 U.S.C.
552(a) and 1 CFR part 51.
(2) On December 16, 1996 (61 FR 58318, November 14, 1996), the
Director of the Federal Register approved the incorporation by
reference of Boeing Service Bulletin 747-53A2378, Revision 1, dated
March 10, 1994.
(3) Contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207, for a copy of this service information. You
may review copies at the FAA, Transport Airplane Directorate, 1601
Lind Avenue, SW., Renton, Washington; or at the National Archives
and Records Administration (NARA). For information on the
availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Exact source excerpt. Text positions 29127–30337, end exclusive, in the original decoded publication. SHA-256: 408df1c71bf88f56af7e834b85b5f3c95f4fa5b21c3e8835fdce92028f4c6a86
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2007-12-11 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 539188c335032dd1564c7bf044fdbc335d0fdc1674f9246c420e141e764c1116. Source manifest: ea84ea524fae5a20c6a7a834f778622813e82c4301c6affc2416fd04a2ffcb42.
Official source · 2007-06-11
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 72, Number 111 (Monday, June 11, 2007)]
[Rules and Regulations]
[Pages 31984-31988]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E7-10982]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2007-27525; Directorate Identifier 2006-NM-159-AD;
Amendment 39-15089; AD 2007-12-11]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 747-100, 747-100B, 747-
100B SUD, 747-200B, 747-200C, 747-300, 747-400, 747-400D, 747SR, and
747SP Series Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is superseding an existing airworthiness directive
(AD), which applies to certain Boeing Model 747 airplanes. That AD
currently requires repetitive inspections to detect cracks and/or
corrosion of the girt bar support fitting at certain main entry doors
(MED), and repair or replacement of the support fitting. The existing
AD also provides for various terminating actions for the repetitive
inspections. This new AD requires the following additional actions: An
inspection, for certain airplanes, for correct installation of square
and conical washers in the girt bar support fitting; an inspection, for
certain other airplanes, to determine if the washers are installed; and
related investigative and corrective action if necessary. This AD
results from a report that the square and conical washers may be
installed incorrectly in the girt bar support fitting on airplanes on
which the support fitting was repaired or replaced in accordance with
the requirements of the existing AD. We are issuing this AD to detect
and correct corrosion of the girt bar support fitting, which could
result in separation of the escape slide from the lower door sill
during deployment, and subsequently prevent proper operation of the
escape slides at the main entry doors during an emergency. We are also
issuing this AD to detect and correct incorrect installation of the
square and conical washers in the girt bar support fitting, which could
result in failure of the escape slide when deployed.
DATES: This AD becomes effective July 16, 2007.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in the AD as of July 16,
2007.
On December 16, 1996 (61 FR 58318, November 14, 1996), the Director
of the Federal Register approved the incorporation by reference of
Boeing Service Bulletin 747-53A2378, Revision 1, dated March 10, 1994.
ADDRESSES: You may examine the AD docket on the Internet at http://dms.dot.gov or in person at the Docket Management Facility, U.S.
Department of Transportation, 400 Seventh Street, SW., Nassif Building,
Room PL-401, Washington, DC.
Contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207, for service information identified in this AD.
FOR FURTHER INFORMATION CONTACT: Patrick Gillespie, Aerospace Engineer,
Cabin Safety and Environmental Systems Branch, ANM-150S, FAA, Seattle
Aircraft Certification Office, 1601 Lind Avenue, SW., Renton,
Washington 98057-3356; telephone (425) 917-6429; fax (425) 917-6590.
SUPPLEMENTARY INFORMATION:
Examining the Docket
You may examine the airworthiness directive (AD) docket on the
Internet at http://dms.dot.gov or in person at the
[[Page 31985]]
Docket Management Facility office between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays. The Docket Management Facility
office (telephone (800) 647-5227) is located on the plaza level of the
Nassif Building at the street address stated in the ADDRESSES section.
Discussion
The FAA issued a notice of proposed rulemaking (NPRM) to amend 14
CFR part 39 to include an AD that supersedes AD 96-23-05, amendment 39-
9810 (61 FR 58318, November 14, 1996). The existing AD applies to
certain Boeing Model 747 airplanes. That NPRM was published in the
Federal Register on March 15, 2007 (72 FR 12136). That NPRM proposed to
continue to require repetitive inspections to detect cracks and/or
corrosion of the girt bar support fitting at certain main entry doors
(MED), and repair or replacement of the support fitting. The existing
AD also provides for various terminating actions for the repetitive
inspections. The NPRM also proposed to require the following additional
actions: An inspection, for certain airplanes, for correct installation
of square and conical washers in the girt bar support fitting; an
inspection, for certain other airplanes, to determine if the washers
are installed; and related investigative and corrective action if
necessary.
Comments
We provided the public the opportunity to participate in the
development of this AD. We have considered the single comment that has
been received on the NPRM. The commenter, Boeing, supports the NPRM.
Clarification of Alternative Method of Compliance (AMOC) Paragraph
We have revised this action to clarify the appropriate procedure
for notifying the principal inspector before using any approved AMOC on
any airplane to which the AMOC applies.
Conclusion
We have carefully reviewed the available data, including the
comment that has been received, and determined that air safety and the
public interest require adopting the AD with the change described
previously. We have determined that this change will neither increase
the economic burden on any operator nor increase the scope of the AD.
Costs of Compliance
There are about 1,012 airplanes of the affected design in the
worldwide fleet. The following table provides the estimated costs for
U.S. operators to comply with this AD. The average labor rate per work
hour is $80. The cost varies depending on the configuration of the
airplane.
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Number of U.S.-
Action Work hours Cost per airplane registered airplanes Fleet cost
----------------------------------------------------------------------------------------------------------------
Inspection of MEDs (required by Between 88 and 102 Between $7,040 and 169................. Between
AD 96-23-05). $8,160, per $1,189,760 and
inspection cycle. $1,379,040, per
inspection
cycle.
Inspection for correct 6................. $480.............. Up to 169........... Up to $81,120.
installation (new required
action).
----------------------------------------------------------------------------------------------------------------
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, Section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866;
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to
comply with this AD and placed it in the AD docket. See the ADDRESSES
section for a location to examine the regulatory evaluation.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The Federal Aviation Administration (FAA) amends Sec. 39.13 by
removing amendment 39-9810 (61 FR 58318, November 14, 1996) and by
adding the following new airworthiness directive (AD):
2007-12-11 Boeing: Amendment 39-15089. Docket No. FAA-2007-27525;
Directorate Identifier 2006-NM-159-AD.
Effective Date
(a) This AD becomes effective July 16, 2007.
Affected ADs
(b) This AD supersedes AD 96-23-05.
[[Page 31986]]
Applicability
(c) This AD applies to Boeing Model 747-100, 747-100B, 747-100B
SUD, 747-200B, 747-200C, 747-300, 747-400, 747-400D, 747SR, and
747SP series airplanes, certificated in any category, line numbers 1
through 868 inclusive.
Unsafe Condition
(d) This AD results from reports that, during scheduled
deployment tests of main entry door slides, corrosion was found on
the floor structure supports for the escape slides of the main deck
entry doors on these airplanes. This AD also results from a report
that the square and conical washers may be installed incorrectly in
the girt bar support fitting on airplanes on which the support
fitting was repaired or replaced in accordance with the requirements
of AD 96-23-05. We are issuing this AD to detect and correct
corrosion of the girt bar support fitting, which could result in
separation of the escape slide from the lower door sill during
deployment, and subsequently prevent proper operation of the escape
slides at the main entry doors during an emergency. We are also
issuing this AD to detect and correct incorrect installation of the
square and conical washers in the girt bar support fitting, which
could result in failure of the escape slide when deployed.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Restatement of Requirements of AD 96-23-05 With New Service Information
Doors Exempt From/Affected by This AD
(f) The requirements of this AD are not applicable to doors
where an escape slide or slide/raft is not installed or is not used
for passenger egress (such as a deactivated door 3, at doors 4 and/
or 5 of an airplane being operated in the ``combi'' configuration,
or any door not used for passenger egress in a ``convertible'' (an
airplane configured for quick change from passenger to cargo)). The
requirements of this AD are also not applicable to doors on
airplanes converted to an all-cargo configuration. The requirements
of this AD become applicable at the time when an escape slide or
slide/raft is installed on such doors, or when such doors are
activated and/or converted for passenger use. The requirements also
become applicable at the time an airplane operating in an all-cargo
configuration is converted to a passenger or passenger/cargo
configuration.
Inspections and Corrective Actions for Airplanes Equipped With Main
Entry Door (MED) 1
(g) For airplanes equipped with MED 1: Prior to the accumulation
of 16 years of service since date of manufacture of the airplane, or
within 18 months after December 16, 1996 (the effective date of AD
96-23-05), whichever occurs later, perform a detailed inspection to
detect cracking and/or corrosion of the girt bar support fitting at
the left and right MED 1, in accordance with Boeing Service Bulletin
747-53A2378, Revision 1, dated March 10, 1994; or Boeing Service
Bulletin 747-53A2378, Revision 3, dated August 11, 2005. After the
effective date of this AD, only Revision 3 may be used.
(h) If no cracking or corrosion is found during the inspection
required by paragraph (g) of this AD, prior to further flight,
accomplish either paragraph (h)(1) or (h)(2) of this AD, in
accordance with the applicable instructions specified in Boeing
Service Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or
Boeing Service Bulletin 747-53A2378, Revision 3, dated August 11,
2005. After the effective date of this AD, only Revision 3 may be
used.
(1) Install a new fitting with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners, in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by paragraph (h) of this
AD; or
(2) Reinstall the threshold assembly with corrosion-resistant
fasteners, in accordance with the service bulletin. Thereafter,
repeat the inspection required by paragraph (g) of this AD at
intervals not to exceed 6 years.
(i) If any cracking is found during the inspection required by
paragraph (g) or (h)(2) of this AD, prior to further flight, install
a new fitting with new fasteners, and reinstall the threshold
assembly with new corrosion-resistant fasteners, in accordance with
Boeing Service Bulletin 747-53A2378, Revision 1, dated March 10,
1994; or Boeing Service Bulletin 747-53A2378, Revision 3, dated
August 11, 2005. After the effective date of this AD, only Revision
3 may be used. After these actions are accomplished, no further
action is required by this paragraph.
(j) If any corrosion is found during the inspection required by
paragraph (g) or (h)(2) of this AD, prior to further flight,
accomplish either paragraph (j)(1) or (j)(2) of this AD, in
accordance with Boeing Service Bulletin 747-53A2378, Revision 1,
dated March 10, 1994; or Boeing Service Bulletin 747-53A2378,
Revision 3, dated August 11, 2005. After the effective date of this
AD, only Revision 3 may be used.
(1) Install a new fitting with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by this paragraph; or
(2) Blend out corrosion in accordance with the service bulletin.
(i) If blend out of corrosion is beyond 10 percent of original
thickness or any crack is found during accomplishment of the blend
out procedures, install a new fitting with new fasteners, and
reinstall the threshold assembly with new corrosion-resistant
fasteners, in accordance with the service bulletin. After these
actions are accomplished, no further action is required by this
paragraph.
(ii) If blend out of corrosion does not exceed 10 percent of
original material thickness, accomplish either paragraph
(j)(2)(ii)(A) or (j)(2)(ii)(B) of this AD:
(A) Install a new fitting with new fasteners, and reinstall
threshold assembly with new corrosion-resistant fasteners, in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by this paragraph; or
(B) Install the repaired fitting with new fasteners and
reinstall the threshold assembly with corrosion-resistant fasteners,
in accordance with the service bulletin. Thereafter, repeat the
inspection and applicable corrective actions required by paragraph
(g) of this AD at intervals not to exceed 6 years.
Inspections and Corrective Actions for Airplanes Equipped With MED
2, 4, and/or 5 (MED 2, 3, and/or 4 on Model 747SP Series Airplanes)
(k) For airplanes equipped with MED 2, 4, and/or 5 (MED 2, 3,
and/or 4 on Model 747SP series airplanes): Prior to the accumulation
of 10 years of service since date of manufacture of the airplane, or
within 18 months after December 16, 1996, whichever occurs later,
perform a detailed inspection to detect cracking and/or corrosion of
the girt bar support fitting at the left and right MED 2, 4, and 5
(MED 2, 3, and 4 on Model 747SP series airplanes), in accordance
with Boeing Service Bulletin 747-53A2378, Revision 1, dated March
10, 1994; or Boeing Service Bulletin 747-53A2378, Revision 3, dated
August 11, 2005. After the effective date of this AD, only Revision
3 may be used.
(l) If no cracking or corrosion is found during the inspection
required by paragraph (k) of this AD, prior to further flight,
accomplish either paragraph (l)(1) or (l)(2) of this AD, in
accordance with the applicable instructions in Boeing Service
Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005.
After the effective date of this AD, only Revision 3 may be used.
(1) Remove the inspected fitting and reinstall it with a new
coat of primer and new fasteners; and reinstall the threshold
assembly with new corrosion-resistant fasteners; in accordance with
the service bulletin. After these actions are accomplished, no
further action is required by this paragraph; or
(2) Reinstall the serrated plate assembly and the girt bar floor
fitting with corrosion-resistant fasteners, in accordance with the
service bulletin. Thereafter, repeat the inspection required by
paragraph (k) of this AD at intervals not to exceed 6 years.
(m) If any cracking is found during the inspection required by
paragraph (k) or (l)(2) of this AD, prior to further flight, install
a new fitting with new fasteners, and reinstall the threshold
assembly with new corrosion-resistant fasteners, in accordance with
Boeing Service Bulletin 747-53A2378, Revision 1, dated March 10,
1994; or Boeing Service Bulletin 747-53A2378, Revision 3, dated
August 11, 2005. After the effective date of this AD, only Revision
3 may be used. After these actions are accomplished, no further
action is required by this paragraph.
(n) If any corrosion is found during the inspection required by
paragraph (k) or (l)(2) of this AD, prior to further flight,
accomplish either paragraph (n)(1) or (n)(2) of this AD, in
accordance with Boeing Service Bulletin 747-53A2378, Revision 1,
dated March 10, 1994; or Boeing Service Bulletin 747-
[[Page 31987]]
53A2378, Revision 3, dated August 11, 2005. After the effective date
of this AD, only Revision 3 may be used.
(1) Install a new fitting with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners, in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by this paragraph; or
(2) Blend out corrosion in accordance with the service bulletin.
(i) If blend out of corrosion is beyond 10 percent of original
thickness or any crack is found during accomplishment of the blend
out procedures, install a new fitting with new fasteners, and
reinstall the threshold assembly with new corrosion-resistant
fasteners, in accordance with the service bulletin. After these
actions are accomplished, no further action is required by this
paragraph.
(ii) If blend out of corrosion does not exceed 10 percent of
original material thickness, install the repaired fitting with new
fasteners, and reinstall the threshold assembly with new corrosion-
resistant fasteners, in accordance with the service bulletin. After
these actions are accomplished, no further action is required by
this paragraph.
(o) For airplanes equipped with main entry door (MED) 3 (this
paragraph does not apply to Model 747SP series airplanes): Prior to
the accumulation of 16 years of service since date of manufacture of
the airplane, or within 18 months after December 16, 1996, whichever
occurs later, perform a detailed inspection to detect cracking and/
or corrosion of the girt bar support angles at the left and right
MED 3, in accordance with Boeing Service Bulletin 747-53A2378,
Revision 1, dated March 10, 1994; or Boeing Service Bulletin 747-
53A2378, Revision 3, dated August 11, 2005. After the effective date
of this AD, only Revision 3 may be used.
(p) If no cracking or corrosion is found during the inspection
required by paragraph (o) of this AD, prior to further flight,
accomplish either paragraph (p)(1) or (p)(2) of this AD in
accordance with the applicable instructions in Boeing Service
Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005.
After the effective date of this AD, only Revision 3 may be used.
(1) Remove the inspected angle and reinstall it with a new coat
of primer and new fasteners; and reinstall the threshold assembly
with new corrosion-resistant fasteners; in accordance with the
service bulletin. After these actions are accomplished, no further
action is required by this paragraph; or
(2) Reinstall the corner scuff plate and the threshold apron
with corrosion-resistant fasteners, in accordance with the service
bulletin. Thereafter, repeat the inspection required by paragraph
(o) of this AD at intervals not to exceed 6 years.
(q) If any crack common to the support angles is found during
the inspection required by paragraph (o) or (p)(2) of this AD, prior
to further flight, accomplish the actions specified in paragraph
(q)(1) or (q)(2), as applicable, in accordance with Boeing Service
Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005.
After the effective date of this AD, only Revision 3 may be used:
(1) Install the new angles with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners. After
these actions are accomplished, no further action is required by
this paragraph of this AD; or
(2) For any cracking found only in the corner casting as
specified in the service bulletin, accomplish either paragraph
(q)(2)(i) or (q)(2)(ii) prior to further flight:
(i) Replace the corner casting in accordance with the service
bulletin; or
(ii) Repair the cracked part in accordance with a method
approved by the Manager, Seattle Aircraft Certification Office
(ACO), FAA, Transport Airplane Directorate. Refer to paragraph (w)
of this AD for the appropriate procedure for seeking such an
approval. (This option is provided in order to give operators time
to obtain a replacement corner casing without grounding an
airplane.) This repair is considered temporary action only;
replacement of the corner casting eventually must be accomplished in
accordance with a schedule prescribed by the Manager, Seattle ACO.
(r) If any corrosion is found during the inspection required by
paragraph (o) of this AD, prior to further flight, accomplish either
paragraph (r)(1) or (r)(2) of this AD, in accordance with Boeing
Service Bulletin 747-53A2378, Revision 1, dated March 10, 1994; or
Boeing Service Bulletin 747-53A2378, Revision 3, dated August 11,
2005. After the effective date of this AD, only Revision 3 may be
used.
(1) Install the new angles with new fasteners, and reinstall the
threshold assembly with new corrosion-resistant fasteners, in
accordance with the service bulletin. After these actions are
accomplished, no further action is required by this paragraph; or
(2) Blend out corrosion in accordance with the service bulletin.
(i) If blend out of corrosion is beyond 10 percent of original
thickness, or if any crack common to the support angles is found
during accomplishment of the blend out procedures, install the new
angles with new fasteners, and reinstall the threshold assembly with
new corrosion-resistant fasteners, in accordance with the service
bulletin. After these actions are accomplished, no further action is
required by this paragraph.
(ii) If blend out of corrosion does not exceed 10 percent of
original material thickness, install the repaired angles with new
fasteners, and reinstall the threshold assembly with new corrosion-
resistant fasteners, in accordance with the service bulletin. After
these actions are accomplished, no further action is required by
this paragraph.
Actions Accomplished According to Previous Issue of Service
Bulletin
(s) Installation of a girt bar support fitting in accordance
with Boeing Service Bulletin 747-25A2831, dated August 29, 1991,
before the effective date of this AD, is considered acceptable for
compliance with the corresponding requirements of paragraphs (h),
(i), (j), (l), (m), and (n) of this AD for each affected fitting
location.
New Requirements of This AD
Inspections for the Washers and Related Investigative/Corrective
Actions
(t) For Groups 7, 8, and 9 airplanes identified in Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005, on
which the support fitting was replaced or repaired in accordance
with Boeing Service Bulletin 747-53A2378, dated June 24, 1993;
Revision 1, dated March 10, 1994; or Revision 2, dated July 24,
2003; or Boeing Service Bulletin 747-25A2831, dated August 29, 1991:
Within 18 months after the effective date of this AD, do a general
visual inspection for correct installation of square and conical
washers in the girt bar floor fittings, and, before further flight,
do all applicable related investigative and corrective actions. Do
all actions in accordance with Figure 18 and the applicable steps
specified on page 52 in the Accomplishment Instructions of Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005,
except as provided by paragraph (v) of this AD.
(u) For Groups 1 through 6 airplanes identified in Boeing
Service Bulletin 747-53A2378, Revision 3, dated August 11, 2005, on
which the support fitting was replaced or repaired in accordance
with Boeing Service Bulletin 747-53A2378, dated June 24, 1993;
Revision 1, dated March 10, 1994; or Revision 2, dated July 24,
2003; or with Boeing Service Bulletin 747-25A2831, dated August 29,
1991: Within 18 months after the effective date of this AD, do a
general visual inspection to determine if square and conical washers
are installed in the girt bar floor fittings, and before further
flight, do all applicable related investigative and corrective
actions. Do all actions in accordance with Figure 18 and the
applicable steps specified on pages 52 and 53 in the Accomplishment
Instructions of Boeing Service Bulletin 747-53A2378, Revision 3,
dated August 11, 2005, except as provided by paragraph (v) of this
AD.
(v) If any damage is found during any inspection required by
paragraphs (t) and (u) of this AD, and Boeing Service Bulletin 747-
53A2378, Revision 3, dated August 11, 2005, specifies contacting
Boeing for appropriate action: Before further flight, do the repair
using a method approved by the Manager, Seattle ACO, or in
accordance with data meeting the certification basis of the airplane
approved by an Authorized Representative for the Boeing Commercial
Airplanes Delegation Option Authorization who has been authorized by
the Manager, Seattle ACO, to make those findings. For a repair
method to be approved, the repair must meet the certification basis
of the airplane, and the approval must specifically refer to this
AD.
Alternative Methods of Compliance (AMOCs)
(w)(1) The Manager, Seattle ACO, has the authority to approve
AMOCs for this AD, if requested in accordance with the procedures
found in 14 CFR 39.19.
[[Page 31988]]
(2) To request a different method of compliance or a different
compliance time for this AD, follow the procedures in 14 CFR 39.19.
Before using any approved AMOC on any airplane to which the AMOC
applies, notify your appropriate principal inspector (PI) in the FAA
Flight Standards District Office (FSDO), or lacking a PI, your local
FSDO.
(3) AMOCs approved previously in accordance with AD 96-23-05,
are approved as AMOCs for the corresponding provisions of this AD.
Material Incorporated by Reference
(x) You must use Boeing Service Bulletin 747-53A2378, Revision
1, dated March 10, 1994; or Boeing Service Bulletin 747-53A2378,
Revision 3, dated August 11, 2005; as applicable, to perform the
actions that are required by this AD, unless the AD specifies
otherwise.
(1) The Director of the Federal Register approved the
incorporation by reference of Boeing Service Bulletin 747-53A2378,
Revision 3, dated August 11, 2005, in accordance with 5 U.S.C.
552(a) and 1 CFR part 51.
(2) On December 16, 1996 (61 FR 58318, November 14, 1996), the
Director of the Federal Register approved the incorporation by
reference of Boeing Service Bulletin 747-53A2378, Revision 1, dated
March 10, 1994.
(3) Contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207, for a copy of this service information. You
may review copies at the FAA, Transport Airplane Directorate, 1601
Lind Avenue, SW., Renton, Washington; or at the National Archives
and Records Administration (NARA). For information on the
availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued in Renton, Washington, on May 30, 2007.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. E7-10982 Filed 6-8-07; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:38:00.519717+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 409b242fe696b34c5434187f6984aeef73322fbae460b45f55e702bcefc7d43d
- Text SHA-256
- 539188c335032dd1564c7bf044fdbc335d0fdc1674f9246c420e141e764c1116
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.