Back to publication catalog

Published 2008-03-04 · Federal Register document E8-3749

Airworthiness Directives; Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -300, 747SP, and 747SR Series Airplanes Powered by General Electric (GE) CF6-45/50 and Pratt & Whitney (P&W) JT9D-70, JT9D-3 or JT9D-7 Series Engines

Publication summary

We are adopting a new airworthiness directive (AD) for certain Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -300, 747SP, and 747SR series airplanes powered by General Electric (GE) CF6- 45/50 and Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series engines. This AD requires repetitive inspections to find cracks and broken fasteners of the rear engine mount bulkhead of the inboard and outboard nacelle struts, and repair if necessary. For certain airplanes, this AD mandates a terminating modification for certain inspections of the inboard and outboard nacelle struts. This AD results from reports of web and frame cracks and sheared attachment fasteners on the inboard and outboard nacelle struts. We are issuing this AD to detect and correct cracks and broken fasteners of the inboard and outboard nacelle struts, which could result in possible loss of the rear engine mount bulkhead load path and consequent separation of the engine from the airplane.

Why this record is shown

Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:26.953736+00:00. The title, summary and date are source facts.

Source revision
federal_register_ad_metadata_2008-e9cf118935fdae82
Source row
results[88]
Raw source SHA-256
e9cf118935fdae82a000e2c01764c770bd79679c1dd4c2b00fdcd3b030f92fe5

Final-rule publication

Recorded publication clauses

AD identifier printed in this edition
2008-05-03
Effective date printed in this edition
2008-04-08
Read 11 complete recorded clauses
Effective Date
Effective Date

    (a) This airworthiness directive (AD) is effective April 8, 
2008.

Exact source excerpt. Text positions 7994–8082, end exclusive, in the original decoded publication. SHA-256: bac9654c0464ac3a58356fca8fce93b5956841f1b6c8d460ab3626196366d01d

Affected ADs
Affected ADs

    (b) None.

Exact source excerpt. Text positions 8082–8111, end exclusive, in the original decoded publication. SHA-256: 027fbc44617399472b6ac4741da3aee18448654374228bcf4fe3f01df6b1539b

Applicability wording · Applicability
Applicability

    (c) This AD applies to Model 747-100, -100B, -100B SUD,--200B,--
200C, -200F, -300, 747SP, and 747SR series airplanes; certificated 
in any category; powered by General Electric (GE) CF6-45/50 and 
Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series engines; as 
identified in Boeing Alert Service Bulletin 747-54A2202, Revision 1, 
dated June 22, 2006.

Exact source excerpt. Text positions 8111–8489, end exclusive, in the original decoded publication. SHA-256: 3e5c04787ca7298be08551d7b8b56c673b0864eaccb39f3a6e65b4b92ec52654

Unsafe Condition
Unsafe Condition

    (d) This AD results from reports of web and frame cracks and 
sheared attachment fasteners on the inboard and outboard nacelle 
strut. We are issuing this AD to detect and correct cracks and 
broken fasteners of the inboard and outboard nacelle struts, which 
could result in possible loss of the rear engine mount bulkhead load 
path and consequent separation of the engine from the airplane.

Exact source excerpt. Text positions 8489–8906, end exclusive, in the original decoded publication. SHA-256: 98a062e2289f40fbecd367f098785caf3cc1932d922973e1aa4b0bd14681f31e

Compliance
Compliance

    (e) You are responsible for having the actions required by this 
AD performed within the compliance times specified, unless the 
actions have already been done.

Exact source excerpt. Text positions 8906–9084, end exclusive, in the original decoded publication. SHA-256: 64a7a1579f37f56eafecd0aeb3c528e7c89f6292ed0cb53091423917642d5847

Compliance Times
Compliance Times

    (f) Do all applicable actions specified in paragraphs (g), (h), 
and (i) of this AD at the applicable times specified in paragraph 
1.E., ``Compliance,'' of Boeing Alert Service Bulletin 747-54A2202, 
Revision 1, dated June 22, 2006, except that where paragraph 1.E. of 
the service bulletin specifies starting the compliance time from ``* 
* * the release date of Revision 1 of this service bulletin,'' this 
AD requires starting the compliance time from the effective date of 
this AD.

Exact source excerpt. Text positions 9084–9595, end exclusive, in the original decoded publication. SHA-256: 8684bf68b79a2efea510b442fa707957560632c2a464f757b46b1ea2e82e91ad

Initial and Repetitive Inspections/Corrective Actions
Initial and Repetitive Inspections/Corrective Actions

    (g) For all airplanes: Perform detailed and high frequency eddy 
current inspections for cracks and broken fasteners of the rear 
engine mount bulkhead of the inboard and outboard nacelle struts, 
and do all applicable related investigative and corrective actions, 
in accordance with the Accomplishment Instructions of Boeing Alert 
Service Bulletin 747-54A2202, Revision 1, dated June 22, 2006. 
Repeat the applicable inspection and actions thereafter at the 
applicable interval specified in paragraph 1.E., ``Compliance,'' of 
the service bulletin. Accomplishing the applicable repair (Repair 1, 
2, 3, or 4, or repair per the Boeing 747 Structural Repair Manual, 
Section 54-11-03 or 54-12-03) terminates the requirements in this 
paragraph for that nacelle strut only.

Exact source excerpt. Text positions 9595–10430, end exclusive, in the original decoded publication. SHA-256: 2317c27f0437e61cd859c3d101ca2b4e3c6f3553a778b9ee3b664aca09e3a9fb

Modification
Modification

    (h) For Groups 1, 2, and 5 airplanes: Do the applicable 
modification (Repair 2, 3, or 4) of the rear engine mount bulkhead 
of the inboard and outboard nacelle struts, and all the applicable 
related investigative and corrective actions, in accordance with the 
Accomplishment Instructions of Boeing Alert Service Bulletin 747-
54A2202, Revision 1, dated June 22, 2006. Accomplishing this 
modification terminates the requirements in paragraph (g) of this AD 
for that nacelle strut only.

Exact source excerpt. Text positions 10430–10939, end exclusive, in the original decoded publication. SHA-256: 43eb6a70d92ffb1d44e6c6cf6764142cc1e8766f3fd88337f2b9970533136b37

Post-Modification Inspection/Corrective Actions
Post-Modification Inspection/Corrective Actions

    (i) For Groups 1, 2, and 5 airplanes on which the applicable 
corrective actions (Repair 1, 2, 3, or 4) required by paragraph (g) 
of this AD have been accomplished; or the applicable modification 
(Repair 2, 3, or 4) required by paragraph (h) of this AD has been 
accomplished: At the applicable time specified in paragraph 1.E., 
``Compliance,'' of Boeing Alert Service Bulletin 747-54A2202, 
Revision 1, dated June 22, 2006, or within 6 months after the 
effective date of this AD, whichever occurs later, perform detailed 
and high frequency eddy current inspections for cracks and broken 
fasteners of the rear engine mount bulkhead of the inboard and 
outboard nacelle struts, and do all applicable related investigative 
and corrective actions, in accordance with the Accomplishment 
Instructions of Boeing Alert Service Bulletin 747-54A2202, Revision 
1, dated June 22, 2006. Repeat the applicable inspections and 
actions thereafter at the applicable interval specified in paragraph 
1.E., ``Compliance,'' of the service bulletin.

Exact source excerpt. Text positions 10939–12033, end exclusive, in the original decoded publication. SHA-256: 6971464876df37b2ecbc5af73e1221823162e21f8ef6b8a34e873108a956a292

Exception to Service Bulletin
Exception to Service Bulletin

    (j) If any crack or any broken fastener is found during any 
inspection required by this AD, and Boeing Alert Service Bulletin 
747-54A2202, Revision 1, dated June 22, 2006, specifies to contact 
Boeing for appropriate action: Before further flight, repair the 
discrepancy using a method approved in accordance with the 
procedures specified in paragraph (k) of this AD.

Alternative Methods of Compliance (AMOCs)

    (k)(1) The Manager, Seattle Aircraft Certification Office (ACO), 
FAA, has the authority to approve AMOCs for this AD, if requested in 
accordance with the procedures found in 14 CFR 39.19.
    (2) To request a different method of compliance or a different 
compliance time

[[Page 11536]]

for this AD, follow the procedures in 14 CFR 39.19. Before using any 
approved AMOC on any airplane to which the AMOC applies, notify your 
appropriate principal inspector (PI) in the FAA Flight Standards 
District Office (FSDO), or lacking a PI, your local FSDO.
    (3) An AMOC that provides an acceptable level of safety may be 
used for any repair required by this AD, if it is approved by an 
Authorized Representative for the Boeing Commercial Airplanes 
Delegation Option Authorization Organization who has been authorized 
by the Manager, Seattle ACO, to make those findings. For a repair 
method to be approved, the repair must meet the certification basis 
of the airplane, and the approval must specifically refer to this 
AD.

Exact source excerpt. Text positions 12033–13518, end exclusive, in the original decoded publication. SHA-256: 490d5dda00f5b6d4502f4d1b1059cdd25b0a8c9e03a58912cd20e20b837a4b3c

Material Incorporated by Reference
Material Incorporated by Reference

    (l) You must use Boeing Alert Service Bulletin 747-54A2202, 
Revision 1, dated June 22, 2006, to do the actions required by this 
AD, unless the AD specifies otherwise.
    (1) The Director of the Federal Register approved the 
incorporation by reference of this service information under 5 
U.S.C. 552(a) and 1 CFR part 51.
    (2) For service information identified in this AD, contact 
Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 
98124-2207.
    (3) You may review copies of the service information 
incorporated by reference at the FAA, Transport Airplane 
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the 
National Archives and Records Administration (NARA). For information 
on the availability of this material at NARA, call 202-741-6030, or 
go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

Exact source excerpt. Text positions 13518–14442, end exclusive, in the original decoded publication. SHA-256: 1c704e10823544124274c294c4a7e7f0bb616760861e18ab99ba3f8b7dd6bc54

No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.

Find all recorded historical references to AD 2008-05-03 · 0 printed reference observations in this pinned collection.

These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.

Why these observations are shown

They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.

Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 8a6815d7771a157a608a9d8d899b37d6e093757c9dbd3c5f628ad11a65754bce. Source manifest: 1592c2a8ba579f296df87037ec0aa177d7d799433e84ba1635ce6e16322d7fd9.

Official source · 2008-03-04

Publication text

This is the complete recorded text of this dated publication.

Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.

Read the complete official publication text
[Federal Register Volume 73, Number 43 (Tuesday, March 4, 2008)]
[Rules and Regulations]
[Pages 11534-11536]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E8-3749]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2007-0204; Directorate Identifier 2007-NM-083-AD; 
Amendment 39-15397; AD 2008-05-03]
RIN 2120-AA64


Airworthiness Directives; Boeing Model 747-100, -100B, -100B SUD, 
-200B, -200C, -200F, -300, 747SP, and 747SR Series Airplanes Powered by 
General Electric (GE) CF6-45/50 and Pratt & Whitney (P&W) JT9D-70, 
JT9D-3 or JT9D-7 Series Engines

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: We are adopting a new airworthiness directive (AD) for certain 
Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -300, 
747SP, and 747SR series airplanes powered by General Electric (GE) CF6-
45/50 and Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series 
engines. This AD requires repetitive inspections to find cracks and 
broken fasteners of the rear engine mount bulkhead of the inboard and 
outboard nacelle struts, and repair if necessary. For certain 
airplanes, this AD mandates a terminating modification for certain 
inspections of the inboard and outboard nacelle struts. This AD results 
from reports of web and frame cracks and sheared attachment fasteners 
on the inboard and outboard nacelle struts. We are issuing this AD to 
detect and correct cracks and broken fasteners of the inboard and 
outboard nacelle struts, which could result in possible loss of the 
rear engine mount bulkhead load path and consequent separation of the 
engine from the airplane.

DATES: This AD is effective April 8, 2008.
    The Director of the Federal Register approved the incorporation by 
reference of a certain publication listed in this AD as of April 8, 
2008.

ADDRESSES: For service information identified in this AD, contact 
Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-
2207.

Examining the AD Docket

    You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Management Facility 
between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays. The AD docket contains this AD, the regulatory evaluation, 
any comments received, and other information. The address for the 
Docket Office (telephone 800-647-5527) is the Document Management 
Facility, U.S. Department of Transportation, Docket Operations, M-30, 
West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., 
Washington, DC 20590.

FOR FURTHER INFORMATION CONTACT: Tamara Anderson, Aerospace Engineer, 
Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office, 
1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 
917-6421; fax (425) 917-6590.

SUPPLEMENTARY INFORMATION: 

Discussion

    We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR 
part 39 to include an airworthiness directive (AD) that would apply to 
certain Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -
300, 747SP, and 747SR series airplanes powered by General Electric (GE) 
CF6-45/50 and Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series 
engines. That NPRM was published in the Federal Register on November 
19, 2007 (72 FR 64961). That NPRM proposed to require repetitive 
inspections to find cracks and broken fasteners of the rear engine 
mount bulkhead of the inboard and outboard nacelle struts, and repair 
if necessary. For certain airplanes, that NPRM proposed to mandate a 
terminating modification for certain inspections of the inboard and 
outboard nacelle struts.

Comments

    We gave the public the opportunity to participate in developing 
this AD. We considered the comment received. Boeing supports the NPRM.

Conclusion

    We reviewed the relevant data, considered the comment received, and 
determined that air safety and the public interest require adopting the 
AD as proposed.

Costs of Compliance

    There are about 460 airplanes of the affected design in the 
worldwide fleet. This AD affects about 135 airplanes of U.S. registry.
    It takes about 4 work hours per airplane to accomplish the required 
detailed inspection, at an average labor rate of $80 per work hour. 
Based on these figures, the estimated cost of the required inspection 
is $43,200, or $320 per airplane, per inspection cycle.
    It takes about 32 work hours per airplane to accomplish the 
required high frequency eddy current inspection, at an average labor 
rate of $80 per work hour. Based on these figures, the estimated cost 
of the required high frequency eddy current inspection is $345,600, or 
$2,560 per airplane, per inspection cycle.
    For Groups 1, 2, and 5 airplanes, it takes between approximately 10 
and 95 work hours per strut (four struts per airplane) to accomplish 
the required modification, depending on airplane configuration, at an 
average labor rate of $80 per work hour. Parts cost for the

[[Page 11535]]

fasteners is between $269 and $897 per strut. Based on these figures, 
the cost impact of the required modification is between $4,276 and 
$33,988 per airplane. We are unable to provide specific information as 
to the cost of the actual parts other than the fasteners that are 
required to accomplish the required modification since the parts will 
be supplied from operator stock.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. ``Subtitle VII: Aviation 
Programs,'' describes in more detail the scope of the Agency's 
authority.
    We are issuing this rulemaking under the authority described in 
``Subtitle VII, Part A, Subpart III, Section 44701: General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    This AD will not have federalism implications under Executive Order 
13132. This AD will not have a substantial direct effect on the States, 
on the relationship between the national government and the States, or 
on the distribution of power and responsibilities among the various 
levels of government.
    For the reasons discussed above, I certify that this AD:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866, (2) Is not a ``significant rule'' under DOT Regulatory 
Policies and Procedures (44 FR 11034, February 26, 1979), and
    (3) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.
    You can find our regulatory evaluation and the estimated costs of 
compliance in the AD Docket.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
Reference, Safety.

Adoption of the Amendment

0
Accordingly, under the authority delegated to me by the Administrator, 
the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new AD:

2008-05-03 Boeing: Amendment 39-15397. Docket No. FAA-2007-0204; 
Directorate Identifier 2007-NM-083-AD.

Effective Date

    (a) This airworthiness directive (AD) is effective April 8, 
2008.

Affected ADs

    (b) None.

Applicability

    (c) This AD applies to Model 747-100, -100B, -100B SUD,--200B,--
200C, -200F, -300, 747SP, and 747SR series airplanes; certificated 
in any category; powered by General Electric (GE) CF6-45/50 and 
Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series engines; as 
identified in Boeing Alert Service Bulletin 747-54A2202, Revision 1, 
dated June 22, 2006.

Unsafe Condition

    (d) This AD results from reports of web and frame cracks and 
sheared attachment fasteners on the inboard and outboard nacelle 
strut. We are issuing this AD to detect and correct cracks and 
broken fasteners of the inboard and outboard nacelle struts, which 
could result in possible loss of the rear engine mount bulkhead load 
path and consequent separation of the engine from the airplane.

Compliance

    (e) You are responsible for having the actions required by this 
AD performed within the compliance times specified, unless the 
actions have already been done.

Compliance Times

    (f) Do all applicable actions specified in paragraphs (g), (h), 
and (i) of this AD at the applicable times specified in paragraph 
1.E., ``Compliance,'' of Boeing Alert Service Bulletin 747-54A2202, 
Revision 1, dated June 22, 2006, except that where paragraph 1.E. of 
the service bulletin specifies starting the compliance time from ``* 
* * the release date of Revision 1 of this service bulletin,'' this 
AD requires starting the compliance time from the effective date of 
this AD.

Initial and Repetitive Inspections/Corrective Actions

    (g) For all airplanes: Perform detailed and high frequency eddy 
current inspections for cracks and broken fasteners of the rear 
engine mount bulkhead of the inboard and outboard nacelle struts, 
and do all applicable related investigative and corrective actions, 
in accordance with the Accomplishment Instructions of Boeing Alert 
Service Bulletin 747-54A2202, Revision 1, dated June 22, 2006. 
Repeat the applicable inspection and actions thereafter at the 
applicable interval specified in paragraph 1.E., ``Compliance,'' of 
the service bulletin. Accomplishing the applicable repair (Repair 1, 
2, 3, or 4, or repair per the Boeing 747 Structural Repair Manual, 
Section 54-11-03 or 54-12-03) terminates the requirements in this 
paragraph for that nacelle strut only.

Modification

    (h) For Groups 1, 2, and 5 airplanes: Do the applicable 
modification (Repair 2, 3, or 4) of the rear engine mount bulkhead 
of the inboard and outboard nacelle struts, and all the applicable 
related investigative and corrective actions, in accordance with the 
Accomplishment Instructions of Boeing Alert Service Bulletin 747-
54A2202, Revision 1, dated June 22, 2006. Accomplishing this 
modification terminates the requirements in paragraph (g) of this AD 
for that nacelle strut only.

Post-Modification Inspection/Corrective Actions

    (i) For Groups 1, 2, and 5 airplanes on which the applicable 
corrective actions (Repair 1, 2, 3, or 4) required by paragraph (g) 
of this AD have been accomplished; or the applicable modification 
(Repair 2, 3, or 4) required by paragraph (h) of this AD has been 
accomplished: At the applicable time specified in paragraph 1.E., 
``Compliance,'' of Boeing Alert Service Bulletin 747-54A2202, 
Revision 1, dated June 22, 2006, or within 6 months after the 
effective date of this AD, whichever occurs later, perform detailed 
and high frequency eddy current inspections for cracks and broken 
fasteners of the rear engine mount bulkhead of the inboard and 
outboard nacelle struts, and do all applicable related investigative 
and corrective actions, in accordance with the Accomplishment 
Instructions of Boeing Alert Service Bulletin 747-54A2202, Revision 
1, dated June 22, 2006. Repeat the applicable inspections and 
actions thereafter at the applicable interval specified in paragraph 
1.E., ``Compliance,'' of the service bulletin.

Exception to Service Bulletin

    (j) If any crack or any broken fastener is found during any 
inspection required by this AD, and Boeing Alert Service Bulletin 
747-54A2202, Revision 1, dated June 22, 2006, specifies to contact 
Boeing for appropriate action: Before further flight, repair the 
discrepancy using a method approved in accordance with the 
procedures specified in paragraph (k) of this AD.

Alternative Methods of Compliance (AMOCs)

    (k)(1) The Manager, Seattle Aircraft Certification Office (ACO), 
FAA, has the authority to approve AMOCs for this AD, if requested in 
accordance with the procedures found in 14 CFR 39.19.
    (2) To request a different method of compliance or a different 
compliance time

[[Page 11536]]

for this AD, follow the procedures in 14 CFR 39.19. Before using any 
approved AMOC on any airplane to which the AMOC applies, notify your 
appropriate principal inspector (PI) in the FAA Flight Standards 
District Office (FSDO), or lacking a PI, your local FSDO.
    (3) An AMOC that provides an acceptable level of safety may be 
used for any repair required by this AD, if it is approved by an 
Authorized Representative for the Boeing Commercial Airplanes 
Delegation Option Authorization Organization who has been authorized 
by the Manager, Seattle ACO, to make those findings. For a repair 
method to be approved, the repair must meet the certification basis 
of the airplane, and the approval must specifically refer to this 
AD.

Material Incorporated by Reference

    (l) You must use Boeing Alert Service Bulletin 747-54A2202, 
Revision 1, dated June 22, 2006, to do the actions required by this 
AD, unless the AD specifies otherwise.
    (1) The Director of the Federal Register approved the 
incorporation by reference of this service information under 5 
U.S.C. 552(a) and 1 CFR part 51.
    (2) For service information identified in this AD, contact 
Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 
98124-2207.
    (3) You may review copies of the service information 
incorporated by reference at the FAA, Transport Airplane 
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the 
National Archives and Records Administration (NARA). For information 
on the availability of this material at NARA, call 202-741-6030, or 
go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

    Issued in Renton, Washington, on February 20, 2008.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
 [FR Doc. E8-3749 Filed 3-3-08; 8:45 am]
BILLING CODE 4910-13-P


Why this text is shown

The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:32:35.732534+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.

Open the captured official edition

Source SHA-256
233b09cbff764d8958ee573cf6de5d3720ef72ade4401840e4b594fbc86ae12a
Text SHA-256
8a6815d7771a157a608a9d8d899b37d6e093757c9dbd3c5f628ad11a65754bce

Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence

Coverage and limits

These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.

The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.