Published 2008-03-04 · Federal Register document E8-3749
Airworthiness Directives; Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -300, 747SP, and 747SR Series Airplanes Powered by General Electric (GE) CF6-45/50 and Pratt & Whitney (P&W) JT9D-70, JT9D-3 or JT9D-7 Series Engines
Publication summary
We are adopting a new airworthiness directive (AD) for certain Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -300, 747SP, and 747SR series airplanes powered by General Electric (GE) CF6- 45/50 and Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series engines. This AD requires repetitive inspections to find cracks and broken fasteners of the rear engine mount bulkhead of the inboard and outboard nacelle struts, and repair if necessary. For certain airplanes, this AD mandates a terminating modification for certain inspections of the inboard and outboard nacelle struts. This AD results from reports of web and frame cracks and sheared attachment fasteners on the inboard and outboard nacelle struts. We are issuing this AD to detect and correct cracks and broken fasteners of the inboard and outboard nacelle struts, which could result in possible loss of the rear engine mount bulkhead load path and consequent separation of the engine from the airplane.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:26.953736+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2008-e9cf118935fdae82
- Source row
- results[88]
- Raw source SHA-256
- e9cf118935fdae82a000e2c01764c770bd79679c1dd4c2b00fdcd3b030f92fe5
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2008-05-03
- Effective date printed in this edition
- 2008-04-08
Read 11 complete recorded clauses
Effective Date
Effective Date
(a) This airworthiness directive (AD) is effective April 8,
2008.
Exact source excerpt. Text positions 7994–8082, end exclusive, in the original decoded publication. SHA-256: bac9654c0464ac3a58356fca8fce93b5956841f1b6c8d460ab3626196366d01d
Affected ADs
Affected ADs
(b) None.
Exact source excerpt. Text positions 8082–8111, end exclusive, in the original decoded publication. SHA-256: 027fbc44617399472b6ac4741da3aee18448654374228bcf4fe3f01df6b1539b
Applicability wording · Applicability
Applicability
(c) This AD applies to Model 747-100, -100B, -100B SUD,--200B,--
200C, -200F, -300, 747SP, and 747SR series airplanes; certificated
in any category; powered by General Electric (GE) CF6-45/50 and
Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series engines; as
identified in Boeing Alert Service Bulletin 747-54A2202, Revision 1,
dated June 22, 2006.
Exact source excerpt. Text positions 8111–8489, end exclusive, in the original decoded publication. SHA-256: 3e5c04787ca7298be08551d7b8b56c673b0864eaccb39f3a6e65b4b92ec52654
Unsafe Condition
Unsafe Condition
(d) This AD results from reports of web and frame cracks and
sheared attachment fasteners on the inboard and outboard nacelle
strut. We are issuing this AD to detect and correct cracks and
broken fasteners of the inboard and outboard nacelle struts, which
could result in possible loss of the rear engine mount bulkhead load
path and consequent separation of the engine from the airplane.
Exact source excerpt. Text positions 8489–8906, end exclusive, in the original decoded publication. SHA-256: 98a062e2289f40fbecd367f098785caf3cc1932d922973e1aa4b0bd14681f31e
Compliance
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Exact source excerpt. Text positions 8906–9084, end exclusive, in the original decoded publication. SHA-256: 64a7a1579f37f56eafecd0aeb3c528e7c89f6292ed0cb53091423917642d5847
Compliance Times
Compliance Times
(f) Do all applicable actions specified in paragraphs (g), (h),
and (i) of this AD at the applicable times specified in paragraph
1.E., ``Compliance,'' of Boeing Alert Service Bulletin 747-54A2202,
Revision 1, dated June 22, 2006, except that where paragraph 1.E. of
the service bulletin specifies starting the compliance time from ``*
* * the release date of Revision 1 of this service bulletin,'' this
AD requires starting the compliance time from the effective date of
this AD.
Exact source excerpt. Text positions 9084–9595, end exclusive, in the original decoded publication. SHA-256: 8684bf68b79a2efea510b442fa707957560632c2a464f757b46b1ea2e82e91ad
Initial and Repetitive Inspections/Corrective Actions
Initial and Repetitive Inspections/Corrective Actions
(g) For all airplanes: Perform detailed and high frequency eddy
current inspections for cracks and broken fasteners of the rear
engine mount bulkhead of the inboard and outboard nacelle struts,
and do all applicable related investigative and corrective actions,
in accordance with the Accomplishment Instructions of Boeing Alert
Service Bulletin 747-54A2202, Revision 1, dated June 22, 2006.
Repeat the applicable inspection and actions thereafter at the
applicable interval specified in paragraph 1.E., ``Compliance,'' of
the service bulletin. Accomplishing the applicable repair (Repair 1,
2, 3, or 4, or repair per the Boeing 747 Structural Repair Manual,
Section 54-11-03 or 54-12-03) terminates the requirements in this
paragraph for that nacelle strut only.
Exact source excerpt. Text positions 9595–10430, end exclusive, in the original decoded publication. SHA-256: 2317c27f0437e61cd859c3d101ca2b4e3c6f3553a778b9ee3b664aca09e3a9fb
Modification
Modification
(h) For Groups 1, 2, and 5 airplanes: Do the applicable
modification (Repair 2, 3, or 4) of the rear engine mount bulkhead
of the inboard and outboard nacelle struts, and all the applicable
related investigative and corrective actions, in accordance with the
Accomplishment Instructions of Boeing Alert Service Bulletin 747-
54A2202, Revision 1, dated June 22, 2006. Accomplishing this
modification terminates the requirements in paragraph (g) of this AD
for that nacelle strut only.
Exact source excerpt. Text positions 10430–10939, end exclusive, in the original decoded publication. SHA-256: 43eb6a70d92ffb1d44e6c6cf6764142cc1e8766f3fd88337f2b9970533136b37
Post-Modification Inspection/Corrective Actions
Post-Modification Inspection/Corrective Actions
(i) For Groups 1, 2, and 5 airplanes on which the applicable
corrective actions (Repair 1, 2, 3, or 4) required by paragraph (g)
of this AD have been accomplished; or the applicable modification
(Repair 2, 3, or 4) required by paragraph (h) of this AD has been
accomplished: At the applicable time specified in paragraph 1.E.,
``Compliance,'' of Boeing Alert Service Bulletin 747-54A2202,
Revision 1, dated June 22, 2006, or within 6 months after the
effective date of this AD, whichever occurs later, perform detailed
and high frequency eddy current inspections for cracks and broken
fasteners of the rear engine mount bulkhead of the inboard and
outboard nacelle struts, and do all applicable related investigative
and corrective actions, in accordance with the Accomplishment
Instructions of Boeing Alert Service Bulletin 747-54A2202, Revision
1, dated June 22, 2006. Repeat the applicable inspections and
actions thereafter at the applicable interval specified in paragraph
1.E., ``Compliance,'' of the service bulletin.
Exact source excerpt. Text positions 10939–12033, end exclusive, in the original decoded publication. SHA-256: 6971464876df37b2ecbc5af73e1221823162e21f8ef6b8a34e873108a956a292
Exception to Service Bulletin
Exception to Service Bulletin
(j) If any crack or any broken fastener is found during any
inspection required by this AD, and Boeing Alert Service Bulletin
747-54A2202, Revision 1, dated June 22, 2006, specifies to contact
Boeing for appropriate action: Before further flight, repair the
discrepancy using a method approved in accordance with the
procedures specified in paragraph (k) of this AD.
Alternative Methods of Compliance (AMOCs)
(k)(1) The Manager, Seattle Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested in
accordance with the procedures found in 14 CFR 39.19.
(2) To request a different method of compliance or a different
compliance time
[[Page 11536]]
for this AD, follow the procedures in 14 CFR 39.19. Before using any
approved AMOC on any airplane to which the AMOC applies, notify your
appropriate principal inspector (PI) in the FAA Flight Standards
District Office (FSDO), or lacking a PI, your local FSDO.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair required by this AD, if it is approved by an
Authorized Representative for the Boeing Commercial Airplanes
Delegation Option Authorization Organization who has been authorized
by the Manager, Seattle ACO, to make those findings. For a repair
method to be approved, the repair must meet the certification basis
of the airplane, and the approval must specifically refer to this
AD.
Exact source excerpt. Text positions 12033–13518, end exclusive, in the original decoded publication. SHA-256: 490d5dda00f5b6d4502f4d1b1059cdd25b0a8c9e03a58912cd20e20b837a4b3c
Material Incorporated by Reference
Material Incorporated by Reference
(l) You must use Boeing Alert Service Bulletin 747-54A2202,
Revision 1, dated June 22, 2006, to do the actions required by this
AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register approved the
incorporation by reference of this service information under 5
U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact
Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington
98124-2207.
(3) You may review copies of the service information
incorporated by reference at the FAA, Transport Airplane
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the
National Archives and Records Administration (NARA). For information
on the availability of this material at NARA, call 202-741-6030, or
go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Exact source excerpt. Text positions 13518–14442, end exclusive, in the original decoded publication. SHA-256: 1c704e10823544124274c294c4a7e7f0bb616760861e18ab99ba3f8b7dd6bc54
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2008-05-03 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 8a6815d7771a157a608a9d8d899b37d6e093757c9dbd3c5f628ad11a65754bce. Source manifest: 1592c2a8ba579f296df87037ec0aa177d7d799433e84ba1635ce6e16322d7fd9.
Official source · 2008-03-04
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 73, Number 43 (Tuesday, March 4, 2008)]
[Rules and Regulations]
[Pages 11534-11536]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E8-3749]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2007-0204; Directorate Identifier 2007-NM-083-AD;
Amendment 39-15397; AD 2008-05-03]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 747-100, -100B, -100B SUD,
-200B, -200C, -200F, -300, 747SP, and 747SR Series Airplanes Powered by
General Electric (GE) CF6-45/50 and Pratt & Whitney (P&W) JT9D-70,
JT9D-3 or JT9D-7 Series Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for certain
Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -300,
747SP, and 747SR series airplanes powered by General Electric (GE) CF6-
45/50 and Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series
engines. This AD requires repetitive inspections to find cracks and
broken fasteners of the rear engine mount bulkhead of the inboard and
outboard nacelle struts, and repair if necessary. For certain
airplanes, this AD mandates a terminating modification for certain
inspections of the inboard and outboard nacelle struts. This AD results
from reports of web and frame cracks and sheared attachment fasteners
on the inboard and outboard nacelle struts. We are issuing this AD to
detect and correct cracks and broken fasteners of the inboard and
outboard nacelle struts, which could result in possible loss of the
rear engine mount bulkhead load path and consequent separation of the
engine from the airplane.
DATES: This AD is effective April 8, 2008.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of April 8,
2008.
ADDRESSES: For service information identified in this AD, contact
Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-
2207.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Management Facility
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The address for the
Docket Office (telephone 800-647-5527) is the Document Management
Facility, U.S. Department of Transportation, Docket Operations, M-30,
West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Tamara Anderson, Aerospace Engineer,
Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office,
1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425)
917-6421; fax (425) 917-6590.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to include an airworthiness directive (AD) that would apply to
certain Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -
300, 747SP, and 747SR series airplanes powered by General Electric (GE)
CF6-45/50 and Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series
engines. That NPRM was published in the Federal Register on November
19, 2007 (72 FR 64961). That NPRM proposed to require repetitive
inspections to find cracks and broken fasteners of the rear engine
mount bulkhead of the inboard and outboard nacelle struts, and repair
if necessary. For certain airplanes, that NPRM proposed to mandate a
terminating modification for certain inspections of the inboard and
outboard nacelle struts.
Comments
We gave the public the opportunity to participate in developing
this AD. We considered the comment received. Boeing supports the NPRM.
Conclusion
We reviewed the relevant data, considered the comment received, and
determined that air safety and the public interest require adopting the
AD as proposed.
Costs of Compliance
There are about 460 airplanes of the affected design in the
worldwide fleet. This AD affects about 135 airplanes of U.S. registry.
It takes about 4 work hours per airplane to accomplish the required
detailed inspection, at an average labor rate of $80 per work hour.
Based on these figures, the estimated cost of the required inspection
is $43,200, or $320 per airplane, per inspection cycle.
It takes about 32 work hours per airplane to accomplish the
required high frequency eddy current inspection, at an average labor
rate of $80 per work hour. Based on these figures, the estimated cost
of the required high frequency eddy current inspection is $345,600, or
$2,560 per airplane, per inspection cycle.
For Groups 1, 2, and 5 airplanes, it takes between approximately 10
and 95 work hours per strut (four struts per airplane) to accomplish
the required modification, depending on airplane configuration, at an
average labor rate of $80 per work hour. Parts cost for the
[[Page 11535]]
fasteners is between $269 and $897 per strut. Based on these figures,
the cost impact of the required modification is between $4,276 and
$33,988 per airplane. We are unable to provide specific information as
to the cost of the actual parts other than the fasteners that are
required to accomplish the required modification since the parts will
be supplied from operator stock.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866, (2) Is not a ``significant rule'' under DOT Regulatory
Policies and Procedures (44 FR 11034, February 26, 1979), and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
You can find our regulatory evaluation and the estimated costs of
compliance in the AD Docket.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
Reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new AD:
2008-05-03 Boeing: Amendment 39-15397. Docket No. FAA-2007-0204;
Directorate Identifier 2007-NM-083-AD.
Effective Date
(a) This airworthiness directive (AD) is effective April 8,
2008.
Affected ADs
(b) None.
Applicability
(c) This AD applies to Model 747-100, -100B, -100B SUD,--200B,--
200C, -200F, -300, 747SP, and 747SR series airplanes; certificated
in any category; powered by General Electric (GE) CF6-45/50 and
Pratt & Whitney (P&W) JT9D-70, JT9D-3, or JT9D-7 series engines; as
identified in Boeing Alert Service Bulletin 747-54A2202, Revision 1,
dated June 22, 2006.
Unsafe Condition
(d) This AD results from reports of web and frame cracks and
sheared attachment fasteners on the inboard and outboard nacelle
strut. We are issuing this AD to detect and correct cracks and
broken fasteners of the inboard and outboard nacelle struts, which
could result in possible loss of the rear engine mount bulkhead load
path and consequent separation of the engine from the airplane.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Compliance Times
(f) Do all applicable actions specified in paragraphs (g), (h),
and (i) of this AD at the applicable times specified in paragraph
1.E., ``Compliance,'' of Boeing Alert Service Bulletin 747-54A2202,
Revision 1, dated June 22, 2006, except that where paragraph 1.E. of
the service bulletin specifies starting the compliance time from ``*
* * the release date of Revision 1 of this service bulletin,'' this
AD requires starting the compliance time from the effective date of
this AD.
Initial and Repetitive Inspections/Corrective Actions
(g) For all airplanes: Perform detailed and high frequency eddy
current inspections for cracks and broken fasteners of the rear
engine mount bulkhead of the inboard and outboard nacelle struts,
and do all applicable related investigative and corrective actions,
in accordance with the Accomplishment Instructions of Boeing Alert
Service Bulletin 747-54A2202, Revision 1, dated June 22, 2006.
Repeat the applicable inspection and actions thereafter at the
applicable interval specified in paragraph 1.E., ``Compliance,'' of
the service bulletin. Accomplishing the applicable repair (Repair 1,
2, 3, or 4, or repair per the Boeing 747 Structural Repair Manual,
Section 54-11-03 or 54-12-03) terminates the requirements in this
paragraph for that nacelle strut only.
Modification
(h) For Groups 1, 2, and 5 airplanes: Do the applicable
modification (Repair 2, 3, or 4) of the rear engine mount bulkhead
of the inboard and outboard nacelle struts, and all the applicable
related investigative and corrective actions, in accordance with the
Accomplishment Instructions of Boeing Alert Service Bulletin 747-
54A2202, Revision 1, dated June 22, 2006. Accomplishing this
modification terminates the requirements in paragraph (g) of this AD
for that nacelle strut only.
Post-Modification Inspection/Corrective Actions
(i) For Groups 1, 2, and 5 airplanes on which the applicable
corrective actions (Repair 1, 2, 3, or 4) required by paragraph (g)
of this AD have been accomplished; or the applicable modification
(Repair 2, 3, or 4) required by paragraph (h) of this AD has been
accomplished: At the applicable time specified in paragraph 1.E.,
``Compliance,'' of Boeing Alert Service Bulletin 747-54A2202,
Revision 1, dated June 22, 2006, or within 6 months after the
effective date of this AD, whichever occurs later, perform detailed
and high frequency eddy current inspections for cracks and broken
fasteners of the rear engine mount bulkhead of the inboard and
outboard nacelle struts, and do all applicable related investigative
and corrective actions, in accordance with the Accomplishment
Instructions of Boeing Alert Service Bulletin 747-54A2202, Revision
1, dated June 22, 2006. Repeat the applicable inspections and
actions thereafter at the applicable interval specified in paragraph
1.E., ``Compliance,'' of the service bulletin.
Exception to Service Bulletin
(j) If any crack or any broken fastener is found during any
inspection required by this AD, and Boeing Alert Service Bulletin
747-54A2202, Revision 1, dated June 22, 2006, specifies to contact
Boeing for appropriate action: Before further flight, repair the
discrepancy using a method approved in accordance with the
procedures specified in paragraph (k) of this AD.
Alternative Methods of Compliance (AMOCs)
(k)(1) The Manager, Seattle Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested in
accordance with the procedures found in 14 CFR 39.19.
(2) To request a different method of compliance or a different
compliance time
[[Page 11536]]
for this AD, follow the procedures in 14 CFR 39.19. Before using any
approved AMOC on any airplane to which the AMOC applies, notify your
appropriate principal inspector (PI) in the FAA Flight Standards
District Office (FSDO), or lacking a PI, your local FSDO.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair required by this AD, if it is approved by an
Authorized Representative for the Boeing Commercial Airplanes
Delegation Option Authorization Organization who has been authorized
by the Manager, Seattle ACO, to make those findings. For a repair
method to be approved, the repair must meet the certification basis
of the airplane, and the approval must specifically refer to this
AD.
Material Incorporated by Reference
(l) You must use Boeing Alert Service Bulletin 747-54A2202,
Revision 1, dated June 22, 2006, to do the actions required by this
AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register approved the
incorporation by reference of this service information under 5
U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact
Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington
98124-2207.
(3) You may review copies of the service information
incorporated by reference at the FAA, Transport Airplane
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the
National Archives and Records Administration (NARA). For information
on the availability of this material at NARA, call 202-741-6030, or
go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Issued in Renton, Washington, on February 20, 2008.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. E8-3749 Filed 3-3-08; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:32:35.732534+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 233b09cbff764d8958ee573cf6de5d3720ef72ade4401840e4b594fbc86ae12a
- Text SHA-256
- 8a6815d7771a157a608a9d8d899b37d6e093757c9dbd3c5f628ad11a65754bce
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.