Published 2009-12-04 · Federal Register document E9-28797
Airworthiness Directives; Airbus Model A300 B2-1C, A300 B2-203, A300 B2K-3C, A300 B4-103, A300 B4-203, and A300 B4-2C Airplanes
Publication summary
We are superseding an existing airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:30.011257+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2009-cb57e588bd107238
- Source row
- results[352]
- Raw source SHA-256
- cb57e588bd10723805ef0ea28ddc0685de14711012023c7e7d12178879efaeed
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2009-25-06
- Effective date printed in this edition
- 2010-01-08
Read 10 complete recorded clauses
Effective Date
Effective Date
(a) This airworthiness directive (AD) becomes effective January
8, 2010.
Exact source excerpt. Text positions 13018–13113, end exclusive, in the original decoded publication. SHA-256: f7ae1df5a7ab4a54398ce76560a56e2a407c1644458c05101314a58ea88312da
Affected ADs
Affected ADs
(b) This AD supersedes AD 2007-18-02, Amendment 39-15182.
Exact source excerpt. Text positions 13113–13190, end exclusive, in the original decoded publication. SHA-256: fe2cd5549aee68c98c8541b4d64ca0017864f60d99eaaacaf3f327ad23c2c329
Applicability wording · Applicability
Applicability
(c) This AD applies to Airbus Model A300 B2-1C, A300 B2-203,
A300 B2K-3C, A300 B4-103, A300 B4-203, and A300 B4-2C airplanes,
certificated in any category, as identified in Airbus Mandatory
Service Bulletin A300-24-0103, Revision 03, dated February 18, 2009.
Exact source excerpt. Text positions 13190–13472, end exclusive, in the original decoded publication. SHA-256: 13e426af79a7c850e118bdc0d82b48e1f0d871e6ad59114e116b142e3202e8be
Subject
Subject
(d) Air Transport Association (ATA) of America Code 24:
Electrical power.
Exact source excerpt. Text positions 13472–13561, end exclusive, in the original decoded publication. SHA-256: 6dd3d01e0cbd13cffe58f231a80193c626bd382c74e03966749a81ed0e34f716
Reason
Reason
(e) The mandatory continuing airworthiness information (MCAI)
states:
Further to the accident of a Boeing 747-131 (flight TWA800), the
FAA has published SFAR 88 (Special Federal Aviation Regulation 88).
Subsequently, the Joint Aviation Authorities (JAA) recommended the
application of a similar regulation to the National Aviation
Authorities (NAA) of its member countries. Under this regulation,
all holders of type certificates for passenger transport aeroplane
with either a passenger capacity of 30 or more, or a payload
capacity of 3 402 kg (7,500 lbs) or more which have received their
certification after 01 January 1958, are required to conduct a
design review against explosion risks.
One of the consequences of the Airbus design review is the
modification of the fuel
[[Page 63578]]
pump wiring to provide protection against chafing of the fuel pump
cables. This condition, if not corrected, could generate short
circuits leading to fuel pump failure and arcing. These could become
a potential ignition source inside the fuel tank which, in
combination with flammable fuel vapours (if present), could result
in a fuel tank explosion and consequent loss of the aeroplane.
To address this unsafe condition, EASA [European Aviation Safety
Agency] issued AD 2007-0066 that required this modification in
accordance with Airbus Service Bulletin (SB) A300-24-0103 Revision
01. Airbus subsequently introduced an additional modification of the
electrical wiring of the outer fuel pump and the landing lights of
the left (LH) and the right (RH) side in Revision 02 of the SB A300-
24-0103, leading to the issuance of EASA AD 2008-0188 which
superseded EASA AD 2007-0066 and required the additional work.
More recently, Airbus introduced some additional protection to
routes 1P and 2P harnesses in zone 571 and 671 of the aeroplane.
For the reason described above, this new AD retains the
requirements of EASA AD 2008-0188, which is superseded, and requires
the additional work as specified in Revision 03 of Airbus SB A300-
24-0103.
The additional modification will provide additional protection
from chafing and will prevent intermittent operation of the fuel
pump and landing lights, as well as failure of the power supply. The
modification of the wiring of the outer fuel pump and the landing
light on the LH side route 1P harness and RH side route 2P harness
includes additional mechanical protection that includes procedures
for installing new splicing on the wires, a new cable type, shrink
sleeve installation on the new wiring, and an additional braided
conduit sleeve (Halar), as applicable, for the fuel pumps and the
landing lights.
Exact source excerpt. Text positions 13561–16280, end exclusive, in the original decoded publication. SHA-256: cc4f794bbdf2aa777439297e4e39dd8c7782c173cbbfb83b87411e40a773c2be
Restatement of Requirements of AD 2007-18-02, With Revised Service Information
Restatement of Requirements of AD 2007-18-02, With Revised Service
Information
(f) Within 31 months after October 2, 2007 (the effective date
of AD 2007-18-02), unless already done, modify the inner and outer
fuel pump wiring, route 1P and 2P harnesses in the LH (left-hand)
wing and in the RH (right-hand) wing, in accordance with the
Accomplishment Instructions of Airbus Service Bulletin A300-24-0103,
Revision 01, dated January 11, 2007; or Airbus Mandatory Service
Bulletin A300-24-0103, Revision 03, dated February 18, 2009. After
the effective date of this AD, use only Airbus Mandatory Service
Bulletin A300-24-0103, Revision 03, dated February 18, 2009. Actions
done before October 2, 2007, in accordance with Airbus Service
Bulletin A300-24-0103, dated March 15, 2006, for airplanes under
configuration 1 as defined in Airbus Service Bulletin A300-24-0103,
Revision 01, dated January 11, 2007; Revision 02, dated April 4,
2008; or Revision 03, dated February 18, 2009; are acceptable for
compliance with the requirements of this paragraph.
New Requirements of This AD
Exact source excerpt. Text positions 16280–17380, end exclusive, in the original decoded publication. SHA-256: b991c4f659ee3e51ad7215dc4ede98cda4d2980de952b65a606bcab1e8cbfa83
Actions and Compliance
Actions and Compliance
(g) Unless already done, within 12 months after the effective
date of this AD, modify the wiring of the outer fuel pump and the
landing light on the LH side route 1P harness and RH side route 2P
harness in accordance with the Accomplishment Instructions of Airbus
Mandatory Service Bulletin A300-24-0103, Revision 03, dated February
18, 2009.
FAA AD Differences
Note 1: This AD differs from the MCAI and/or service information
as follows: No differences.
Exact source excerpt. Text positions 17380–17876, end exclusive, in the original decoded publication. SHA-256: 999fd41e899fcab7f426b0c2d3c938ab620bcf1730dc5fd9a066a5bea63f0bb3
Other FAA AD Provisions
Other FAA AD Provisions
(h) The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
has the authority to approve AMOCs for this AD, if requested using
the procedures found in 14 CFR 39.19. Send information to ATTN: Dan
Rodina, Aerospace Engineer, International Branch, ANM-116, Transport
Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington
98057-3356; telephone (425) 227-2125; fax (425) 227-1149. Before
using any approved AMOC on any airplane to which the AMOC applies,
notify your appropriate principal inspector (PI) in the FAA Flight
Standards District Office (FSDO), or lacking a PI, your local FSDO.
AMOCs approved previously in accordance with AD 2007-18-02, are
approved as AMOCs for the corresponding provisions of this AD.
(2) Airworthy Product: For any requirement in this AD to obtain
corrective actions from a manufacturer or other source, use these
actions if they are FAA-approved. Corrective actions are considered
FAA-approved if they are approved by the State of Design Authority
(or their delegated agent). You are required to assure the product
is airworthy before it is returned to service.
(3) Reporting Requirements: For any reporting requirement in
this AD, under the provisions of the Paperwork Reduction Act, the
Office of Management and Budget (OMB) has approved the information
collection requirements and has assigned OMB Control Number 2120-
0056.
Exact source excerpt. Text positions 17876–19429, end exclusive, in the original decoded publication. SHA-256: 5401e1e88dc648d43fb97c6b29d00bd59cc11be3b00bc0deb06719f0ecb5d38d
Related Information
Related Information
(i) Refer to MCAI EASA Airworthiness Directive 2009-0157, dated
July 17, 2009; Airbus Service Bulletin A300-24-0103, Revision 01,
dated January 11, 2007; and Airbus Mandatory Service Bulletin A300-
24-0103, Revision 03, dated February 18, 2009; for related
information.
Exact source excerpt. Text positions 19429–19728, end exclusive, in the original decoded publication. SHA-256: 87992548e17b084488e30aa5358ffc083f5e373762d7ad5f6b39ece45345208a
Material Incorporated by Reference
Material Incorporated by Reference
(j) You must use Airbus Mandatory Service Bulletin A300-24-0103,
Revision 03, dated February 18, 2009, to do the actions required by
this AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register approved the
incorporation by reference of this service information under 5
U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact
Airbus SAS--EAW (Airworthiness Office), 1 Rond Point Maurice
Bellonte, 31707 Blagnac Cedex, France; telephone +33 5 61 93 36 96;
fax +33 5 61 93 44 51; e-mail: [email protected];
Internet http://www.airbus.com.
(3) You may review copies of the service information at the FAA,
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton,
Washington. For information on the availability of this material at
the FAA, call 425-227-1221 or 425-227-1152.
(4) You may also review copies of the service information that
is incorporated by reference at the National Archives and Records
Administration (NARA). For information on the availability of this
material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Exact source excerpt. Text positions 19728–20967, end exclusive, in the original decoded publication. SHA-256: a15fb76df35d437397771df217e8f775eb15162dcd9bd6b4a40332a04e20bf6c
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2009-25-06 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 43cbf1382d0c537aa40d04dac2295d13608d7a21cb5ed405a73910b5d3714b5c. Source manifest: 82c97671378b6991fcac9a41eb8fd032919a88757f9b60df811be07a4232c4c3.
Official source · 2009-12-04
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 74, Number 232 (Friday, December 4, 2009)]
[Rules and Regulations]
[Pages 63576-63578]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E9-28797]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2009-0055; Directorate Identifier 2008-NM-194-AD;
Amendment 39-16125; AD 2009-25-06]
RIN 2120-AA64
Airworthiness Directives; Airbus Model A300 B2-1C, A300 B2-203,
A300 B2K-3C, A300 B4-103, A300 B4-203, and A300 B4-2C Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are superseding an existing airworthiness directive (AD)
for the products listed above. This AD results from mandatory
continuing airworthiness information (MCAI) originated by an aviation
authority of another country to identify and correct an unsafe
condition on an aviation product. The MCAI describes the unsafe
condition as:
* * * [T]he FAA has published SFAR 88 (Special Federal Aviation
Regulation 88). * * * Under this regulation, all holders of type
certificates for passenger transport aeroplane * * * are required to
conduct a design review against explosion risks.
One of the consequences of the Airbus design review is the
modification of the fuel pump wiring to provide protection against
chafing of the fuel pump cables. This condition, if not corrected,
could generate short circuits leading to fuel pump failure and
arcing. These could become a potential ignition source inside the
fuel tank which, in combination with flammable fuel vapours (if
present), could result in a fuel tank explosion and consequent loss
of the aeroplane.
To address this unsafe condition, EASA [European Aviation Safety
Agency] issued AD 2007-0066 that required this modification [of the
fuel pump against short circuit] in accordance with Airbus Service
Bulletin (SB) A300-24-0103 Revision 01. Airbus subsequently
introduced an additional modification of the electrical wiring of
the outer fuel pump and the landing lights of the left (LH) and the
right (RH) side in Revision 02 of the SB A300-24-0103, leading to
the issuance of EASA AD 2008-0188 which superseded EASA AD 2007-0066
and required the additional work.
More recently, Airbus introduced some additional protection to
routes 1P and 2P harnesses in zone 571 and 671 of the aeroplane.
* * * * *
We are issuing this AD to require actions to correct the unsafe
condition on these products.
DATES: This AD becomes effective January 8, 2010.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of January 8,
2010.
ADDRESSES: You may examine the AD docket on the Internet at http://www.regulations.gov or in person at the U.S. Department of
Transportation, Docket Operations, M-30, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC.
FOR FURTHER INFORMATION CONTACT: Dan Rodina, Aerospace Engineer,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425)
227-2125; fax (425) 227-1149.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a supplemental notice of proposed rulemaking (NPRM) to
amend 14 CFR part 39 to include an AD that would apply to the specified
products. That supplemental NPRM was published in the Federal Register
on July 6, 2009 (74 FR 31896), and proposed to supersede AD 2007-18-02,
Amendment 39-15182 (72 FR 49175, August 28, 2007). That supplemental
NPRM proposed to correct an unsafe condition for the specified
products. The MCAI states:
Further to the accident of a Boeing 747-131 (flight TWA800), the
FAA has published SFAR 88 (Special Federal Aviation Regulation 88).
Subsequently, the Joint Aviation Authorities (JAA) recommended the
application of a similar regulation to the National Aviation
Authorities (NAA) of its member countries. Under this regulation,
all holders of type certificates for passenger transport aeroplane
with either a passenger capacity of 30 or more, or a payload
capacity of 3,402 kg (7,500 lbs) or more which have received their
certification after 01 January 1958, are required to conduct a
design review against explosion risks.
One of the consequences of the Airbus design review is the
modification of the fuel pump wiring to provide protection against
chafing of the fuel pump cables. This condition, if not corrected,
could generate short circuits leading to fuel pump failure and
arcing. These could become a potential ignition source inside the
fuel tank which, in combination with flammable fuel vapours (if
present), could result in a fuel tank explosion and consequent loss
of the aeroplane.
To address this unsafe condition, EASA [European Aviation Safety
Agency] issued AD 2007-0066 that required this modification in
accordance with Airbus Service Bulletin (SB) A300-24-0103 Revision
01. Airbus subsequently introduced an additional modification of the
electrical wiring of the outer fuel pump and the landing lights of
the left (LH) and the right (RH) side in Revision 02 of the SB A300-
24-0103, leading to the issuance of EASA AD 2008-0188 which
superseded EASA AD 2007-0066 and required the additional work.
More recently, Airbus introduced some additional protection to
routes 1P and 2P harnesses in zone 571 and 671 of the aeroplane.
For the reason described above, this new AD retains the
requirements of EASA AD 2008-0188, which is superseded, and requires
the additional work as specified in Revision 03 of Airbus SB A300-
24-0103.
The additional modification will provide additional protection from
chafing and will prevent intermittent operation of the fuel pump and
landing lights, as well as failure of the power supply. The
modification of the wiring of the outer fuel pump and the landing light
on the LH side route 1P harness and RH side route 2P harness includes
additional mechanical protection that includes procedures for
installing new splicing on the wires, a new cable type, shrink sleeve
installation on the new wiring, and an additional braided conduit
sleeve (Halar), as applicable, for the fuel pumps and the landing
lights. You may obtain further information by examining the MCAI in the
AD docket.
Comments
We gave the public the opportunity to participate in developing
this AD. We considered the comment received.
Request To Refer to Updated MCAI
Airbus requests that we refer to the latest EASA AD 2009-0157,
dated July 17, 2009 (which was issued after the FAA supplemental NPRM
was published), to require the additional work provided in Airbus
Mandatory Service Bulletin A300-24-0103, Revision 03, dated February
18, 2009. The supplemental NPRM referred to Airbus Mandatory Service
Bulletin A300-24-0103, Revision 03, dated February 18, 2009, as the
appropriate source of service information for the required actions.
Airbus further requests that we review the supplemental NPRM in light
of the new EASA AD to qualify current requirements depending on the
[[Page 63577]]
airplane configuration, as specified in the latest EASA AD.
We agree to refer to the latest EASA AD because it refers to the
revised service information. However, we do not agree that it is
necessary to revise the supplemental NPRM to qualify the requirements
based on different configurations. Paragraph (g) of this AD requires
that work be accomplished in accordance with Airbus Mandatory Service
Bulletin A300-24-0103, Revision 03, dated February 18, 2009. The
service bulletin specifies the different configurations and
corresponding actions so there is no need to change the AD. Therefore,
we have not changed the AD in regard to this issue.
Conclusion
We reviewed the available data, including the comment received, and
determined that air safety and the public interest require adopting the
AD with the changes described previously. We determined that these
changes will not increase the economic burden on any operator or
increase the scope of the AD.
Differences Between This AD and the MCAI or Service Information
We have reviewed the MCAI and related service information and, in
general, agree with their substance. But we might have found it
necessary to use different words from those in the MCAI to ensure the
AD is clear for U.S. operators and is enforceable. In making these
changes, we do not intend to differ substantively from the information
provided in the MCAI and related service information.
We might also have required different actions in this AD from those
in the MCAI in order to follow our FAA policies. Any such differences
are highlighted in a NOTE within the AD.
Costs of Compliance
We estimate that this AD will affect about 13 products of U.S.
registry.
The actions that are required by AD 2007-18-02 and retained in this
AD take about 72 work-hours per product, at an average labor rate of
$80 per work hour. Required parts cost about $5,050 per product. Based
on these figures, the estimated cost of the currently required actions
is $10,810 per product.
We estimate that it will take about 42 work-hours per product to
comply with the new basic requirements of this AD. The average labor
rate is $80 per work-hour. Required parts will cost about $4,100 per
product. Where the service information lists required parts costs that
are covered under warranty, we have assumed that there will be no
charge for these costs. As we do not control warranty coverage for
affected parties, some parties may incur costs higher than estimated
here. Based on these figures, we estimate the cost of this AD to the
U.S. operators to be $96,980, or $7,460 per product.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We determined that this AD will not have federalism implications
under Executive Order 13132. This AD will not have a substantial direct
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government.
For the reasons discussed above, I certify this AD:
1. Is not a ``significant regulatory action'' under Executive Order
12866;
2. Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979); and
3. Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to
comply with this AD and placed it in the AD docket.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Operations office
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains the NPRM, the regulatory evaluation,
any comments received, and other information. The street address for
the Docket Operations office (telephone (800) 647-5527) is in the
ADDRESSES section. Comments will be available in the AD docket shortly
after receipt.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing Amendment 39-15182 (72 FR
49175, August 28, 2007) and adding the following new AD:
2009-25-06 Airbus: Amendment 39-16125. Docket No. FAA-2009-0055;
Directorate Identifier 2008-NM-194-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective January
8, 2010.
Affected ADs
(b) This AD supersedes AD 2007-18-02, Amendment 39-15182.
Applicability
(c) This AD applies to Airbus Model A300 B2-1C, A300 B2-203,
A300 B2K-3C, A300 B4-103, A300 B4-203, and A300 B4-2C airplanes,
certificated in any category, as identified in Airbus Mandatory
Service Bulletin A300-24-0103, Revision 03, dated February 18, 2009.
Subject
(d) Air Transport Association (ATA) of America Code 24:
Electrical power.
Reason
(e) The mandatory continuing airworthiness information (MCAI)
states:
Further to the accident of a Boeing 747-131 (flight TWA800), the
FAA has published SFAR 88 (Special Federal Aviation Regulation 88).
Subsequently, the Joint Aviation Authorities (JAA) recommended the
application of a similar regulation to the National Aviation
Authorities (NAA) of its member countries. Under this regulation,
all holders of type certificates for passenger transport aeroplane
with either a passenger capacity of 30 or more, or a payload
capacity of 3 402 kg (7,500 lbs) or more which have received their
certification after 01 January 1958, are required to conduct a
design review against explosion risks.
One of the consequences of the Airbus design review is the
modification of the fuel
[[Page 63578]]
pump wiring to provide protection against chafing of the fuel pump
cables. This condition, if not corrected, could generate short
circuits leading to fuel pump failure and arcing. These could become
a potential ignition source inside the fuel tank which, in
combination with flammable fuel vapours (if present), could result
in a fuel tank explosion and consequent loss of the aeroplane.
To address this unsafe condition, EASA [European Aviation Safety
Agency] issued AD 2007-0066 that required this modification in
accordance with Airbus Service Bulletin (SB) A300-24-0103 Revision
01. Airbus subsequently introduced an additional modification of the
electrical wiring of the outer fuel pump and the landing lights of
the left (LH) and the right (RH) side in Revision 02 of the SB A300-
24-0103, leading to the issuance of EASA AD 2008-0188 which
superseded EASA AD 2007-0066 and required the additional work.
More recently, Airbus introduced some additional protection to
routes 1P and 2P harnesses in zone 571 and 671 of the aeroplane.
For the reason described above, this new AD retains the
requirements of EASA AD 2008-0188, which is superseded, and requires
the additional work as specified in Revision 03 of Airbus SB A300-
24-0103.
The additional modification will provide additional protection
from chafing and will prevent intermittent operation of the fuel
pump and landing lights, as well as failure of the power supply. The
modification of the wiring of the outer fuel pump and the landing
light on the LH side route 1P harness and RH side route 2P harness
includes additional mechanical protection that includes procedures
for installing new splicing on the wires, a new cable type, shrink
sleeve installation on the new wiring, and an additional braided
conduit sleeve (Halar), as applicable, for the fuel pumps and the
landing lights.
Restatement of Requirements of AD 2007-18-02, With Revised Service
Information
(f) Within 31 months after October 2, 2007 (the effective date
of AD 2007-18-02), unless already done, modify the inner and outer
fuel pump wiring, route 1P and 2P harnesses in the LH (left-hand)
wing and in the RH (right-hand) wing, in accordance with the
Accomplishment Instructions of Airbus Service Bulletin A300-24-0103,
Revision 01, dated January 11, 2007; or Airbus Mandatory Service
Bulletin A300-24-0103, Revision 03, dated February 18, 2009. After
the effective date of this AD, use only Airbus Mandatory Service
Bulletin A300-24-0103, Revision 03, dated February 18, 2009. Actions
done before October 2, 2007, in accordance with Airbus Service
Bulletin A300-24-0103, dated March 15, 2006, for airplanes under
configuration 1 as defined in Airbus Service Bulletin A300-24-0103,
Revision 01, dated January 11, 2007; Revision 02, dated April 4,
2008; or Revision 03, dated February 18, 2009; are acceptable for
compliance with the requirements of this paragraph.
New Requirements of This AD
Actions and Compliance
(g) Unless already done, within 12 months after the effective
date of this AD, modify the wiring of the outer fuel pump and the
landing light on the LH side route 1P harness and RH side route 2P
harness in accordance with the Accomplishment Instructions of Airbus
Mandatory Service Bulletin A300-24-0103, Revision 03, dated February
18, 2009.
FAA AD Differences
Note 1: This AD differs from the MCAI and/or service information
as follows: No differences.
Other FAA AD Provisions
(h) The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
has the authority to approve AMOCs for this AD, if requested using
the procedures found in 14 CFR 39.19. Send information to ATTN: Dan
Rodina, Aerospace Engineer, International Branch, ANM-116, Transport
Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington
98057-3356; telephone (425) 227-2125; fax (425) 227-1149. Before
using any approved AMOC on any airplane to which the AMOC applies,
notify your appropriate principal inspector (PI) in the FAA Flight
Standards District Office (FSDO), or lacking a PI, your local FSDO.
AMOCs approved previously in accordance with AD 2007-18-02, are
approved as AMOCs for the corresponding provisions of this AD.
(2) Airworthy Product: For any requirement in this AD to obtain
corrective actions from a manufacturer or other source, use these
actions if they are FAA-approved. Corrective actions are considered
FAA-approved if they are approved by the State of Design Authority
(or their delegated agent). You are required to assure the product
is airworthy before it is returned to service.
(3) Reporting Requirements: For any reporting requirement in
this AD, under the provisions of the Paperwork Reduction Act, the
Office of Management and Budget (OMB) has approved the information
collection requirements and has assigned OMB Control Number 2120-
0056.
Related Information
(i) Refer to MCAI EASA Airworthiness Directive 2009-0157, dated
July 17, 2009; Airbus Service Bulletin A300-24-0103, Revision 01,
dated January 11, 2007; and Airbus Mandatory Service Bulletin A300-
24-0103, Revision 03, dated February 18, 2009; for related
information.
Material Incorporated by Reference
(j) You must use Airbus Mandatory Service Bulletin A300-24-0103,
Revision 03, dated February 18, 2009, to do the actions required by
this AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register approved the
incorporation by reference of this service information under 5
U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact
Airbus SAS--EAW (Airworthiness Office), 1 Rond Point Maurice
Bellonte, 31707 Blagnac Cedex, France; telephone +33 5 61 93 36 96;
fax +33 5 61 93 44 51; e-mail: [email protected];
Internet http://www.airbus.com.
(3) You may review copies of the service information at the FAA,
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton,
Washington. For information on the availability of this material at
the FAA, call 425-227-1221 or 425-227-1152.
(4) You may also review copies of the service information that
is incorporated by reference at the National Archives and Records
Administration (NARA). For information on the availability of this
material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Issued in Renton, Washington, on November 23, 2009.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. E9-28797 Filed 12-3-09; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:19:02.310163+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- 1156d43796f4a81d51208f1fe601e3384b23a712837be63ae273d1db26f69feb
- Text SHA-256
- 43cbf1382d0c537aa40d04dac2295d13608d7a21cb5ed405a73910b5d3714b5c
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.