Published 2010-01-14 · Federal Register document E9-31043
Airworthiness Directives; CFM International, S.A. CFM56-7B Series Turbofan Engines
Publication summary
The FAA is adopting a new airworthiness directive (AD) for CFM International, S.A. CFM56-7B series turbofan engines. This AD requires initial and repetitive eddy current inspections (ECIs) of certain part number (P/N) low-pressure (LP) turbine rear frames. This AD results from a refined life analysis by the engine manufacturer that shows the need to identify an initial and repetitive inspection threshold for inspecting certain LP turbine rear frames. We are issuing this AD to prevent failure of the LP turbine rear frame from low-cycle-fatigue cracks. Failure of the LP turbine rear frame could result in engine separation from the airplane, possibly leading to loss of control of the airplane.
Why this record is shown
Source: Federal Register annual FAA metadata. Acquired 2026-09-03T22:23:33.146842+00:00. The title, summary and date are source facts.
- Source revision
- federal_register_ad_metadata_2010-a7267cd3a71dbd26
- Source row
- results[18]
- Raw source SHA-256
- a7267cd3a71dbd2645583c8a673df65e4a7fa9360a96e3be0de5b81f9d68c9a0
Final-rule publication
Recorded publication clauses
- AD identifier printed in this edition
- 2010-01-05
- Effective date printed in this edition
- 2010-02-18
Read 10 complete recorded clauses
Effective Date
Effective Date
(a) This airworthiness directive (AD) becomes effective February
18, 2010.
Exact source excerpt. Text positions 11315–11412, end exclusive, in the original decoded publication. SHA-256: 7cb4c825259cc0d831ec29dedd521e245f7b2929f2545b71d380d7ebaa078726
Affected ADs
Affected ADs
(b) None.
Exact source excerpt. Text positions 11412–11441, end exclusive, in the original decoded publication. SHA-256: 027fbc44617399472b6ac4741da3aee18448654374228bcf4fe3f01df6b1539b
Applicability wording · Applicability
Applicability
(c) This AD applies to:
(1) CFM International, S.A. CFM56-7B20; -7B22; -7B24; -7B26; -
7B27; -7B22/B1; -7B24/B1; -7B27/B1; -7B26/B1; -7B20/3; -7B22/3; -
7B24/3; -7B26/3; -7B27/3; -7B22/3B1; -7B24/3B1; -7B27/3B1; -7B26/
3B1; -7B26/3F; -7B27/B3; -7B27/3F; -7B27/3B1F; and -7B27/3B3
turbofan engines assembled with a low-pressure (LP) turbine rear
frame, part number (P/N) 340-166-254-0; 340-166-255-0; 340-166-256-
0; 340-166-257-0; 340-166-258-0; or 340-166-259-0; and
(2) CFM International, S.A. CFM56-7B20/2; -7B22/2; -7B24/2; -
7B26/2; and -7B27/2 turbofan engines assembled with a dual annular
combustor and an LP turbine rear frame, P/N 340-177-551-0; 340-177-
552-0; 340-177-553-0; 340-177-554-0; 340-177-555-0; or 340-177-556-
0.
(3) These engines are installed on, but not limited to, Boeing
737-600, 737-700, 737-800, and 737-900 series airplanes.
Exact source excerpt. Text positions 11441–12333, end exclusive, in the original decoded publication. SHA-256: 022c0485203147eab4c8fe4ec7ad34bc908dc4215f73db7c18cee3f7eeb54e3e
Unsafe Condition
Unsafe Condition
(d) This AD results from a refined life analysis by the engine
manufacturer that shows the need to identify an initial and
repetitive inspection threshold for inspecting certain LP turbine
rear frames. We are issuing this AD to prevent failure of the LP
turbine rear frame from low-cycle-fatigue cracks. Failure of the LP
turbine rear frame could result in engine separation from the
airplane, possibly leading to loss of control of the airplane.
Exact source excerpt. Text positions 12333–12809, end exclusive, in the original decoded publication. SHA-256: b777bca191fc6c56101665ff2113d2d4e4a7aa3614970e0346795d091a2b2e3b
Compliance
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified unless the
actions have already been done.
Exact source excerpt. Text positions 12809–12986, end exclusive, in the original decoded publication. SHA-256: 9b3c9e019fb507cf6548fcccdb7151b3e1278af7078c0a234a67c27b748f31df
Inspections of LP Turbine Rear Frames
Inspections of LP Turbine Rear Frames
(f) For CFM International, S.A. CFM56-7B20; -7B22; -7B24; -7B26;
-7B27; -7B22/B1; -7B24/B1; -7B27/B1; -7B20/3; -7B22/3; -7B24/3; -
7B26/3; -7B27/3; -7B22/3B1; -7B24/3B1; -7B27/3B1; -7B26/3F; -7B27/
3F; and -7B27/3B1F turbofan engines with an LP turbine rear frame,
P/N 340-166-254-0; 340-166-255-0; 340-166-256-0; 340-166-257-0; 340-
166-258-0; or 340-166-259-0, do the following:
(1) Perform an initial eddy current inspection (ECI) of the LP
turbine rear frame within 25,000 cycles-since-new (CSN) on the LP
turbine rear frame.
(2) For engines with unknown LP turbine rear frame CSN, perform
an initial ECI within 300 cycles from the effective date of this AD.
(3) Perform repetitive ECIs of the LP turbine rear frame, using
the inspection intervals in paragraph 3.A. (8) of the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0579,
Revision 5, dated March 30, 2009.
(4) Use paragraphs 3.A. through 3.A. (7)(d) of the
Accomplishment Instructions of CFM International, S.A. Service
Bulletin (SB) No. CFM56-7B S/B 72-0579, Revision 5, dated March 30,
2009, to do the ECIs.
(5) Remove LP turbine rear frames from service that have a total
cumulated crack length at any location, of 0.79 inch (20 mm) or
longer.
(g) For CFM International, S.A. CFM56-7B26/B1; -7B27/B3; -7B26/
3B1; and -7B27/3B3 turbofan engines with an LP turbine rear frame,
P/N 340-166-254-0; 340-166-255-0; 340-166-256-0; 340-166-257-0; 340-
166-258-0; or 340-166-259-0, do the following:
(1) Perform an initial ECI of the LP turbine rear frame within
19,000 CSN on the LP turbine rear frame.
(2) For engines with unknown LP turbine rear frame CSN, perform
an initial ECI within 300 cycles from the effective date of this AD.
(3) Perform repetitive ECIs of the LP turbine rear frame, using
the inspection intervals in paragraph 3.A. (9) of the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0579,
Revision 5, dated March 30, 2009.
(4) Use paragraphs 3.A. through 3.A. (7)(d) of the
Accomplishment Instructions of CFM International, S.A. Service
Bulletin (SB) No. CFM56-7B S/B 72-0579, Revision 5, dated March 30,
2009, to do the ECIs.
(5) Remove LP turbine rear frames from service that have a total
cumulated crack length at any location, of 0.79 inch (20 mm) or
longer.
(h) For CFM International, S.A. CFM56-7B20/2; -7B22/2; -7B24/2;
-7B26/2; and -7B27/2 turbofan engines assembled with a dual annular
combustor and an LP turbine rear frame, P/N 340-177-551-0; 340-177-
552-0; 340-177-553-0; 340-177-554-0; 340-177-555-0; or 340-177-556-
0, do the following:
(1) Perform an initial ECI of the LP turbine rear frame within
16,350 CSN on the LP turbine rear frame.
(2) For engines with unknown LP turbine rear frame CSN, perform
an initial ECI within 300 cycles from the effective date of this AD.
(3) Perform repetitive ECIs of the LP turbine rear frame, using
the inspection intervals in paragraph 3.A. (8) of the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0558,
Revision 3, dated March 30, 2009.
(4) Use paragraphs 3.A. through 3.A. (7)(d) of the
Accomplishment Instructions of CFM International, S.A. SB No. CFM56-
7B S/B 72-0558, Revision 3, dated March 30, 2009, to do the ECIs.
(5) Remove LP turbine rear frames from service that have a total
cumulated crack length at any location, of 0.43 inch (11 mm) or
longer.
[[Page 2067]]
Exact source excerpt. Text positions 12986–16533, end exclusive, in the original decoded publication. SHA-256: f37789835f0fbd7da86e0b781cb23780e3d68f67977df064de9a30fdb01cc66d
Previous Credit
Previous Credit
(i) Initial inspection of LP turbine rear frames before the
effective date of this AD performed using the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0579,
original issue, Revision 1, Revision 2, Revision 3, or Revision 4,
satisfy the requirements of paragraphs (f)(1), (f)(2), (g)(1), and
(g)(2) of this AD.
(j) Initial inspection of LP turbine rear frames before the
effective date of this AD performed using the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0558,
original issue, Revision 1, or Revision 2, satisfy the requirements
of paragraphs (h)(1) and (h)(2) of this AD.
Exact source excerpt. Text positions 16533–17213, end exclusive, in the original decoded publication. SHA-256: c7a2e88f962ffffbaf6a3915d42b197758830acdf99b355be8902df039fa8658
Alternative Methods of Compliance
Alternative Methods of Compliance
(k) The Manager, Engine Certification Office, has the authority
to approve alternative methods of compliance for this AD if
requested using the procedures found in 14 CFR 39.19.
Exact source excerpt. Text positions 17213–17433, end exclusive, in the original decoded publication. SHA-256: 044414beeebdd30820f28f1115d2bbdc02c682375eba48c27712fb2166951acb
Related Information
Related Information
(l) European Aviation Safety Agency AD 2009-0009 (corrected),
dated January 27, 2009, also addresses the subject of this AD.
(m) Contact Antonio Cancelliere, Aerospace Engineer, Engine
Certification Office, FAA, Engine and Propeller Directorate, 12 New
England Executive Park, Burlington, MA 01803; e-mail:
[email protected]; telephone (781) 238-7751; fax (781)
238-7199, for more information about this AD.
Exact source excerpt. Text positions 17433–17876, end exclusive, in the original decoded publication. SHA-256: 0e1a83cf4f1797287dc81224824c3d4ad9b95a58ba777ad541fa019372327da1
Material Incorporated by Reference
Material Incorporated by Reference
(n) You must use the service information specified in the
following Table 1 to perform the inspections required by this AD.
The Director of the Federal Register approved the incorporation by
reference of the documents listed in the following Table 1 in
accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Contact CFM
International, Technical Publications Department, 1 Neumann Way,
Cincinnati, OH 45215; telephone (513) 552-2800; fax (513) 552-2816,
for a copy of this service information. You may review copies at the
FAA, New England Region, 12 New England Executive Park, Burlington,
MA; or at the National Archives and Records Administration (NARA).
For information on the availability of this material at NARA, call
202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Table 1--Incorporation by Reference
----------------------------------------------------------------------------------------------------------------
Service Bulletin No. Page Revision Date
----------------------------------------------------------------------------------------------------------------
CFM56-7B S/B 72-0558........... All............................ 3 March 30, 2009.
Total Pages: 22
CFM56-7B S/B 72-0579........... All............................ 5 March 30, 2009
Total Pages: 23
----------------------------------------------------------------------------------------------------------------
Exact source excerpt. Text positions 17876–19486, end exclusive, in the original decoded publication. SHA-256: 5f7f0664bc5c2a1042d689037cedd12085427b676ccf0db305d3e0b802e7e79f
No replacement link has been established from this edition. The complete historical rule chain and current legal effect remain unknown.
Find all recorded historical references to AD 2010-01-05 · 0 printed reference observations in this pinned collection.
These are observations from one dated publication. Current legal status is unknown; aircraft applicability, installed configuration, compliance and burden require separate evidence. Missing or unparsed conditions remain unknown.
Why these observations are shown
They were extracted offline from the same immutable official HTML source as the complete recorded text. The dated source wording, original text coordinates and exact quote digests are retained. PDF/text agreement and current regulatory effect have not been qualified.
Observation revision: whole-ad-publication-clause-observations-1.0.1. Text SHA-256: 9f282e14e11847bca8ffd89669a8467da960f1f6d363f2c5ad433ea1405cb545. Source manifest: 63665d67082ea7319a7fb329f141bad83e8f8ecdad7310ca94aa9cac553df525.
Official source · 2010-01-14
Publication text
This is the complete recorded text of this dated publication.
Current legal effect is unknown. Aircraft applicability, installed configuration and compliance require separate evidence. PDF/text agreement has not been evaluated.
Read the complete official publication text
[Federal Register Volume 75, Number 9 (Thursday, January 14, 2010)]
[Rules and Regulations]
[Pages 2064-2067]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E9-31043]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2009-0236; Directorate Identifier 2009-NE-06-AD;
Amendment 39-16162; AD 2010-01-05]
RIN 2120-AA64
Airworthiness Directives; CFM International, S.A. CFM56-7B Series
Turbofan Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for CFM
International, S.A. CFM56-7B series turbofan engines. This AD requires
initial and repetitive eddy current inspections (ECIs) of certain part
number (P/N) low-pressure (LP) turbine rear frames. This AD results
from a refined life analysis by the engine manufacturer that shows the
need to identify an initial and repetitive inspection threshold for
inspecting certain LP turbine rear frames. We are issuing this AD to
prevent failure of the LP turbine rear frame from low-cycle-fatigue
cracks. Failure of the LP turbine rear frame could result in engine
separation from the airplane, possibly leading to loss of control of
the airplane.
DATES: This AD becomes effective February 18, 2010. The Director of the
Federal Register approved the incorporation by reference of certain
publications listed in the regulations as of February 18, 2010.
ADDRESSES: You can get the service information identified in this AD
from CFM International, Technical Publications Department, 1 Neumann
Way, Cincinnati, OH 45215; telephone (513) 552-2800; fax (513) 552-
2816.
The Docket Operations office is located at Docket Management
Facility, U.S. Department of Transportation, 1200 New Jersey Avenue,
SE., West Building Ground Floor, Room W12-140, Washington, DC 20590-
0001.
[[Page 2065]]
FOR FURTHER INFORMATION CONTACT: Antonio Cancelliere, Aerospace
Engineer, Engine Certification Office, FAA, Engine and Propeller
Directorate, 12 New England Executive Park, Burlington, MA 01803; e-
mail: [email protected]; telephone (781) 238-7751; fax (781)
238-7199.
SUPPLEMENTARY INFORMATION: The FAA proposed to amend 14 CFR part 39
with a proposed AD. The proposed AD applies to CFM International, S.A.
CFM56-7B series turbofan engines. We published the proposed AD in the
Federal Register on May 11, 2009 (74 FR 21772). That action proposed to
require initial and repetitive ECIs of certain P/N LP turbine rear
frames.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Operations office
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The street address for
the Docket Operations office (telephone (800) 647-5527) is provided in
the ADDRESSES section. Comments will be available in the AD docket
shortly after receipt.
Comments
We provided the public the opportunity to participate in the
development of this AD. We have considered the comments received.
Request To Supersede or Revise Existing AD 2008-03-09
One commenter, the Air Transport Association (ATA), requests that
we should supersede or revise existing AD 2008-03-09 to incorporate the
requirements and P/Ns affected by the proposed AD.
We do not agree. Superseding or revising that AD to incorporate
these requirements would make the requirements of existing AD 2008-03-
09 and this AD confusing. AD 2008-03-09 requires a change to the
Airworthiness Limitations Section (ALS) for the introduction of the new
LP turbine rear frame life limits, with inspections, while this AD
introduces limits for LP turbine rear frame P/Ns that were introduced
to the field before the ALS changes occurred. We did not change the AD.
Request To Reference the Latest Service Bulletins (SBs)
ATA and CFM International, S.A. request that we reference the
latest version of CFM International, S.A. SB No. CFM56-7B S/B 72-0579,
which is Revision 5, dated March 30, 2009. CFM International also
requests that we reference the latest version of CFM International,
S.A. SB No. CFM56-7B S/B 72-0558, which is Revision 3, dated March 30,
2009.
We agree and changed the SB references in the AD.
Request To Include LP Turbine Rear Frame P/Ns
ATA requests that we include turbine rear frame P/Ns 340-166-251-0;
340-166-252-0; and 340-166-253-0. These P/Ns are included in the
effectivity section of CFM International, S.A. SB No. CFM56-7B S/B 72-
0579, and Engine Manual 05-21-03. ATA also requests that we include LP
turbine rear frame P/Ns 340-027-110-0 and 370-027-120-0. These P/Ns are
included in the effectivity section of CFM International, S.A. SB No.
CFM56-7B S/B 72-0568.
We do not agree. This AD addresses LP turbine rear frame P/Ns
introduced in the field by CFM International, S.A. through SB No.
CFM56-7B S/B 72-0527, before the ALS could be modified to include the
LP turbine rear frame P/Ns affected by this AD. The LP turbine rear
frame P/Ns listed by ATA are already listed in the ALS. We did not
change the AD.
Question Regarding Inclusion of LP Turbine Rear Frame P/Ns
Japan Airlines (JAL) questions whether the LP turbine rear frame P/
Ns 340-166-251-0; 340-166-252-0; and 340-166-253-0 should be listed in
this AD.
The LP turbine rear frame P/Ns referred to by JAL are already
listed in the ALS. We did not change the AD.
Request To Remove Engine Models
ATA requests that we remove engine models CFM56-7B26/B2; CFM56-
7B26/3B2; and CFM56-7B26/3B2F from the proposed AD, as they are not
affected.
We agree and removed those models from the AD. We also advised CFM
International, S.A., to remove those models from the effectivity list
of SB No. CFM56-7B S/B 72-0579.
Request To Remove Repeated P/Ns
ATA requests that we remove the repeated listings of LP turbine
rear frame P/N 340-166-254-0 from the AD.
We agree and removed the repeated P/N listings from the AD.
Request To Review and Correct an Engine Model
ATA and CFM International, S.A. request that we review the engine
model -7B27/3 in the proposed AD, as it appears to be incorrect. ATA
states also that engine model -7B27/B3 is missing from the proposed AD.
We agree. We corrected the -7B27/3 engine model in paragraph (g) to
read ``-7B27/B3''. We also corrected the typographical error in
paragraph (c)(1) so that engine model -7B27/3 is not duplicated. We
changed the duplicate model to read ``-7B27/B3''.
Request To Remove an Engine Model
ATA requests that we remove engine model -7B27A from paragraph (f)
of the proposed AD, as it is not affected by the AD action.
We agree and removed that engine model from the AD.
Previous Credit Paragraphs Added
Since we issued the proposed AD, we became aware that we need to
allow previous credit for initial inspections done before the effective
date of the AD, using earlier versions of the applicable SBs. We added
two previous credit paragraphs to the compliance section of the AD.
Conclusion
We have carefully reviewed the available data, including the
comments received, and determined that air safety and the public
interest require adopting the AD with the changes described previously.
We have determined that these changes will neither increase the
economic burden on any operator nor increase the scope of the AD.
Costs of Compliance
We estimate that this AD will affect 1,228 CFM56-7B series turbofan
engines installed on airplanes of U.S. registry. We estimate that it
will take about 3 work-hours to perform an eddy current inspection of
an LP turbine rear frame. The average labor rate is $80 per work-hour.
A new replacement LP turbine rear frame costs about $275,000. We
estimate that all but the first of the recurrent inspections would
occur during normally scheduled maintenance. Therefore, the cost of
only the first inspection is included as directly attributable to this
AD and we included that cost in the first year. Also, while we estimate
that all 1,228 LP turbine rear frames will need replacement at some
point in their 30-year useful life, only the unused cost of the part is
attributable to this AD. Therefore, based on the service history of the
LP turbine rear frame, we estimate the total cost of the AD to U.S.
operators to be less than $11,266,490 annually based on a 30-year fleet
life expectation.
[[Page 2066]]
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, Section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866;
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a summary of the costs to comply with this AD and
placed it in the AD Docket. You may get a copy of this summary at the
address listed under ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the Federal Aviation Administration amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive:
2010-01-05 CFM International, S.A: Amendment 39-16162. Docket No.
FAA-2009-0236; Directorate Identifier 2009-NE-06-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective February
18, 2010.
Affected ADs
(b) None.
Applicability
(c) This AD applies to:
(1) CFM International, S.A. CFM56-7B20; -7B22; -7B24; -7B26; -
7B27; -7B22/B1; -7B24/B1; -7B27/B1; -7B26/B1; -7B20/3; -7B22/3; -
7B24/3; -7B26/3; -7B27/3; -7B22/3B1; -7B24/3B1; -7B27/3B1; -7B26/
3B1; -7B26/3F; -7B27/B3; -7B27/3F; -7B27/3B1F; and -7B27/3B3
turbofan engines assembled with a low-pressure (LP) turbine rear
frame, part number (P/N) 340-166-254-0; 340-166-255-0; 340-166-256-
0; 340-166-257-0; 340-166-258-0; or 340-166-259-0; and
(2) CFM International, S.A. CFM56-7B20/2; -7B22/2; -7B24/2; -
7B26/2; and -7B27/2 turbofan engines assembled with a dual annular
combustor and an LP turbine rear frame, P/N 340-177-551-0; 340-177-
552-0; 340-177-553-0; 340-177-554-0; 340-177-555-0; or 340-177-556-
0.
(3) These engines are installed on, but not limited to, Boeing
737-600, 737-700, 737-800, and 737-900 series airplanes.
Unsafe Condition
(d) This AD results from a refined life analysis by the engine
manufacturer that shows the need to identify an initial and
repetitive inspection threshold for inspecting certain LP turbine
rear frames. We are issuing this AD to prevent failure of the LP
turbine rear frame from low-cycle-fatigue cracks. Failure of the LP
turbine rear frame could result in engine separation from the
airplane, possibly leading to loss of control of the airplane.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified unless the
actions have already been done.
Inspections of LP Turbine Rear Frames
(f) For CFM International, S.A. CFM56-7B20; -7B22; -7B24; -7B26;
-7B27; -7B22/B1; -7B24/B1; -7B27/B1; -7B20/3; -7B22/3; -7B24/3; -
7B26/3; -7B27/3; -7B22/3B1; -7B24/3B1; -7B27/3B1; -7B26/3F; -7B27/
3F; and -7B27/3B1F turbofan engines with an LP turbine rear frame,
P/N 340-166-254-0; 340-166-255-0; 340-166-256-0; 340-166-257-0; 340-
166-258-0; or 340-166-259-0, do the following:
(1) Perform an initial eddy current inspection (ECI) of the LP
turbine rear frame within 25,000 cycles-since-new (CSN) on the LP
turbine rear frame.
(2) For engines with unknown LP turbine rear frame CSN, perform
an initial ECI within 300 cycles from the effective date of this AD.
(3) Perform repetitive ECIs of the LP turbine rear frame, using
the inspection intervals in paragraph 3.A. (8) of the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0579,
Revision 5, dated March 30, 2009.
(4) Use paragraphs 3.A. through 3.A. (7)(d) of the
Accomplishment Instructions of CFM International, S.A. Service
Bulletin (SB) No. CFM56-7B S/B 72-0579, Revision 5, dated March 30,
2009, to do the ECIs.
(5) Remove LP turbine rear frames from service that have a total
cumulated crack length at any location, of 0.79 inch (20 mm) or
longer.
(g) For CFM International, S.A. CFM56-7B26/B1; -7B27/B3; -7B26/
3B1; and -7B27/3B3 turbofan engines with an LP turbine rear frame,
P/N 340-166-254-0; 340-166-255-0; 340-166-256-0; 340-166-257-0; 340-
166-258-0; or 340-166-259-0, do the following:
(1) Perform an initial ECI of the LP turbine rear frame within
19,000 CSN on the LP turbine rear frame.
(2) For engines with unknown LP turbine rear frame CSN, perform
an initial ECI within 300 cycles from the effective date of this AD.
(3) Perform repetitive ECIs of the LP turbine rear frame, using
the inspection intervals in paragraph 3.A. (9) of the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0579,
Revision 5, dated March 30, 2009.
(4) Use paragraphs 3.A. through 3.A. (7)(d) of the
Accomplishment Instructions of CFM International, S.A. Service
Bulletin (SB) No. CFM56-7B S/B 72-0579, Revision 5, dated March 30,
2009, to do the ECIs.
(5) Remove LP turbine rear frames from service that have a total
cumulated crack length at any location, of 0.79 inch (20 mm) or
longer.
(h) For CFM International, S.A. CFM56-7B20/2; -7B22/2; -7B24/2;
-7B26/2; and -7B27/2 turbofan engines assembled with a dual annular
combustor and an LP turbine rear frame, P/N 340-177-551-0; 340-177-
552-0; 340-177-553-0; 340-177-554-0; 340-177-555-0; or 340-177-556-
0, do the following:
(1) Perform an initial ECI of the LP turbine rear frame within
16,350 CSN on the LP turbine rear frame.
(2) For engines with unknown LP turbine rear frame CSN, perform
an initial ECI within 300 cycles from the effective date of this AD.
(3) Perform repetitive ECIs of the LP turbine rear frame, using
the inspection intervals in paragraph 3.A. (8) of the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0558,
Revision 3, dated March 30, 2009.
(4) Use paragraphs 3.A. through 3.A. (7)(d) of the
Accomplishment Instructions of CFM International, S.A. SB No. CFM56-
7B S/B 72-0558, Revision 3, dated March 30, 2009, to do the ECIs.
(5) Remove LP turbine rear frames from service that have a total
cumulated crack length at any location, of 0.43 inch (11 mm) or
longer.
[[Page 2067]]
Previous Credit
(i) Initial inspection of LP turbine rear frames before the
effective date of this AD performed using the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0579,
original issue, Revision 1, Revision 2, Revision 3, or Revision 4,
satisfy the requirements of paragraphs (f)(1), (f)(2), (g)(1), and
(g)(2) of this AD.
(j) Initial inspection of LP turbine rear frames before the
effective date of this AD performed using the Accomplishment
Instructions of CFM International, S.A. SB No. CFM56-7B S/B 72-0558,
original issue, Revision 1, or Revision 2, satisfy the requirements
of paragraphs (h)(1) and (h)(2) of this AD.
Alternative Methods of Compliance
(k) The Manager, Engine Certification Office, has the authority
to approve alternative methods of compliance for this AD if
requested using the procedures found in 14 CFR 39.19.
Related Information
(l) European Aviation Safety Agency AD 2009-0009 (corrected),
dated January 27, 2009, also addresses the subject of this AD.
(m) Contact Antonio Cancelliere, Aerospace Engineer, Engine
Certification Office, FAA, Engine and Propeller Directorate, 12 New
England Executive Park, Burlington, MA 01803; e-mail:
[email protected]; telephone (781) 238-7751; fax (781)
238-7199, for more information about this AD.
Material Incorporated by Reference
(n) You must use the service information specified in the
following Table 1 to perform the inspections required by this AD.
The Director of the Federal Register approved the incorporation by
reference of the documents listed in the following Table 1 in
accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Contact CFM
International, Technical Publications Department, 1 Neumann Way,
Cincinnati, OH 45215; telephone (513) 552-2800; fax (513) 552-2816,
for a copy of this service information. You may review copies at the
FAA, New England Region, 12 New England Executive Park, Burlington,
MA; or at the National Archives and Records Administration (NARA).
For information on the availability of this material at NARA, call
202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
Table 1--Incorporation by Reference
----------------------------------------------------------------------------------------------------------------
Service Bulletin No. Page Revision Date
----------------------------------------------------------------------------------------------------------------
CFM56-7B S/B 72-0558........... All............................ 3 March 30, 2009.
Total Pages: 22
CFM56-7B S/B 72-0579........... All............................ 5 March 30, 2009
Total Pages: 23
----------------------------------------------------------------------------------------------------------------
Issued in Burlington, Massachusetts, on December 23, 2009.
Francis A. Favara,
Manager, Engine and Propeller Directorate, Aircraft Certification
Service.
[FR Doc. E9-31043 Filed 1-13-10; 8:45 am]
BILLING CODE 4910-13-P
Why this text is shown
The complete text was extracted from the official GovInfo HTML edition for this publication. Acquired 2026-10-09T03:18:09.010558+00:00. Text extraction preserves the recorded source wording; it does not determine current requirements.
Open the captured official edition
- Source SHA-256
- c6348d8090faae3ef0b073768b8725f23416717de4fa800ca8e2b8c16c5f5689
- Text SHA-256
- 9f282e14e11847bca8ffd89669a8467da960f1f6d363f2c5ad433ea1405cb545
Return to the full metadata catalog · Search complete publication text · Explore retained publication text and evidence
Coverage and limits
These are dated publication metadata, recorded clauses and literal source observations. Word, model-label, header and reference matches do not establish current legal effect, manufacturer/model identity, aircraft applicability, installed configuration or compliance.
The collection uses 33 explicit annual source snapshots. Source captures and operative-text qualifications have separate states. Missing information remains unknown.